HomeMy WebLinkAboutPermit Building 1986-10-1
Job Address
CJc20 mol4rJ
~@
~ CITY Of SPRINGfiElD
COMBIIIATION APPLICATION/PERMIT
EIIERr,y SOURCES:
Heat
I~ater Heater
Ranqe
fi2- Ai -~1::7-'lO-\~q
.' . INfOR/IATION Lltlt .1
726-3753
Sq. ftg. 1.lain
~q. Ftc). Access.
Sq. Ftg. Other
New Add Alter ~ep.
-Fence Demo Change/Use
Other - -
I
IIrISPECTIOII LItlE
1726-3769
Owner ~ If'h-oo.J::;_
Address >? &, 3 m ~
Phone 7Lf 7
;3371
V~ j?o:O..fiJ vi
BuilciinQ Pennit Info: Descr,be \~ork(i'.e,"
family nesidence With Attached r,ara~e)
v1/i (J~ /YL1-red.,
if
Build Single
~
10
.....::J
c:::t
-S:)
Legal Oescription
Construction lender
Address
UtS I oN I EArl
(name)
Phone
(address)
(lies. no.)
(exoiresl
l'
(ohone nO.l
Primary
Structural
Electrical
Mechanical
CONTRACTORS (name)
General Jiarrl Ue ~r
PlumbinQ I
(addreso;)
/<:i-;tf~ 1.f2r.., &, d
-..J
(lies. no.) (e>tnil"'esl
10 ~;)c( ~f f)
(ohonf=l no.)
7cJ.h -sqb '2-
Electrical
~1echanica'
PlUIIBING
ElECTRICAl
MECHANICAl
rm.'
Each single fixture
r FEE I CHARGE Nn.-' ~ Hr: t rl-/8.RG..E. ~m_
Residence of furnace/burner to
SQ. fT. BTU's
'rrL'..cHARG.E..
Relocated building
(new fix. additional)
New circuits alts.
or extensions
Floor furnace
and vent
S.F. Residence
(] bathl
IDuplex (1 bath) each
Additional bath
SERVICES
Recessed wall
Sn~~p hp~tpr ~nd vpnt
~!ater service
!TempOrary Construction
IChange in existing
res i d_e.nce
Imultifamily. comm. or
Industrial
IOf amps.
ICOMI-I./lND. fEEDERS
I Install/alter/relocate
di~trib. feeders
IOf amps.1
I I
I
I
Appliance vent
SPDarate
S-tationary evap.
cooler
Vent fan wi th
sinale duct
Vent system apart from
heatina or A.C.
Mechanical exhaust
hnnd ~nd dUl't
I I'lood stove/heater
I
I
I
Sewer
Storm Sewer
TOTAL CHARGES
WHERE STATE l~W REQUIRES
shall not be vali~ until the
TOTAl CHARGES
ISSUANcr Of PfRtHT
TOTAl CHARGES
that the Electrical work be done by an Electrical Contractor, the electrical portion of this perr.1it
label has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE yAREFULlY EXN1INED the completed application for permit. and do hereby certify that all information hereon is true
and correct. and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Soringfield and the laws of the State of Oregon pertaining to the work described herein. and that UO OCCUPAUCY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ORS 701.055. that if exempt the basis for exemption is noted hereon, and that
only subcontractors and employees who are in compliance with OP.S 701.055 will be used on this project.
Zone
Fi re Zone
Flood Plain
Tyoe/Const.
Bedrooms
Stories
Units
Occy load
Occy Group
SIf,IlATURE ~
fOr. OffICE USE OIIL Y
Sq. Ftg. r1ain
Sq. ft9. Access
Sq. ftg. Other
u
DATE/tJ ,-!-Y6
IlAl.1E(please 'print) &eNe hs/el{'
x
x
Value
Value
Value
x
TOTAl VAlUATION
BUILDHlG PERmT
Charges an':::
Surcharges'
.30 c-,O Plan Ck.
_______~_!.::?~ ...Q.S!/Blda
I 5; 7 Plan Ck.
, 't 30%/Blda
Fence
Co,,"/I nd
Ppr J:'pp
Res
Per Fee
Isyste,ms Development
Charae (1.S~)
I
I
I
I
PlUt1BING PERMIT
Charges an,d
Surcharges,
D~mo
ElECTRICAl. PERr~IT
Charges an~
Surcharges,
11ECHANICAl PERMIT
Charges and
Surcharges
'Sldewalk
A/C Pavin9
Total Comb. rermit
I TOTAl
L/-o 0 tf
Curb Cut
.
..
COMBINATION APPLICATION/PERMIT (CAP)
1. Applicant to furnish
A. Job Address
B. Legal Description
I. example- Tax Lot 100, Lane County Map Reference
1/ oj 43
2. examEle' Lot 1. Block 3, 2nd Addition to
~prlngtield Estates
C. Name. etc. of owner and construction lender
D. Energy Sources
1. example~ heat/electrical ceilina/or forced air Qas
2. examole- waterheater/electrical/or solar
E. Square footage or valuation, etc. -
I. examole- 1250 sq. foot house, 500 sq. foot garage
2. examole- if new project. check-new - if addition,
check add, etc.
F. Building pennit information:
1. example - construct single family house with an
atta-ched garage
2. exam~le - remodel existing garage into family room
3. example - convert single family residence into
restaurant (change of use)
G. Value of work as defined in Section 303 (a) of the
Structural SpecialtY Code
H. DESIGN TEAM AND CONTRACTORS
I To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or job site
corrections, etc.
II. Abbreviated Plumbing, Mechanical, & Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacent
to the appropriate item{s) to be installed
B: Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEOULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for signature by his electrical
supervisor. The general contractor is .not authorized
to sign the electrical label. ---
III. Applicant to sign and date
Wnenever possible, the initial application will be used as
a worksheet only. Where possible, Building Division Staff
wi,ll prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fe~s are paid. All other fees and charges are due and
payable when the permit is issued.
V. FOR OFFICE USE ONLY
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
.
~
.
PERMIT VALIDATION
8&~(rb
1 0 -I - Yh
Permit Clerk ~(' ~
~
.
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
PLAN~ REVIEWED BY:
name
signature
date