Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-12-19 (2) Field Observations and Comments Performed visual inspection of reinforcing steel in the following locations: 8" CMU block walls for the proposed Quick Lube Building from 8 'feet to 12 feet above finished floor. Reinforcing steel was checked for grade. size, lap, placement and clearances where applicable, Reinforcing steel was placed in accordance with approved design drawings and specifications. All cells were relatively clean and mortar projections are within the limits of the International Building Code, Performed continuous inspection during the 'placement of grout in the locations listed above. Grout was placed by pump and mechanically/manually consolidated. All cells were grouted solid. Cast one set of three solid test prisms, To the best of our knowledge. the work inspected above was in accordance with the building department approved design drawings. specifications and applicable workmanship provisions of the International Building Code. Contractor was advised of all on-site results and asked to notify our office when additional services are needed. Type of Material Supplier Mix No. Slump Air Content Ambient Temperature Material Temperature Time Placed Design Strength (psi) Number of Samples Total Yardage Placed Inspector: Ray Aliperti, ICC #1017075-84 l ra~;lInf01ltion ",..,. .To Build On Engineering . Consulting' Thstlng . DAILY FIELD REPORT Date Performed: December 19, 2006 Report'Number: 722-60359-38 Client: Mr. Eric Patterson Project Name: L1thia Toyota- Lithia Toyota Quick Lube 360 East Jackson Street Project Location: 863 Main Street Medford, Oregon 97501 Springfield. Oregon P.O. No.: Permit No.: COM 06-0868 Type of Structure: Weather: Cloudy Type of Inspection: Structural Masonry Gmut Morse Bras 247KG3ROOO fJism. Morse Bros 247KG3ROOO 9" 9" 39' 58' 1:15PM 2500 39' 58' 1:15PM 1500 3 (Solid Prisms) 7 yds 7 vds If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Respectfully Submitted, rofessional SerVice Industries, Inc. t:1/. ~ c: City of Springfield John Hyland Construction Doug Snider Architect r' THIS REPORT IS PROVIDED FOR THE: INFORMA TlON OF THE CUENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMfITAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULl.. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional ServIce Industries, Inc. .1040A Shelley St.. Springfield, OR 97477. Phone 541{746.9649. Fax 541{746.7163