Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-1-3 .'T'+; .. ... ~. lnjOrmatlOn l",~. .To Build On Engineering. Consulting . Thstlng . / CAlLY FIELD REPORT Date Performed: January 3, 2007 Report Number: 722-60359-49 Client: Mr. Eric Patterson Project Name: Lithia Toyota Lithia Toyota Quick lube Building 360 East Jackson Street Project location: 863 Main Street Medford, Oregon 97501 Springfield, Oregon P,Q. No,: Permit No,: COM 06-0868 Type of Structure: Weather: Rain Type of Inspection:, Epoxy Inspection Field Observations and Comments Performed continuous inspection during the installation of #5 epoxied rebar dowels in the following locations: foundation attachment at west side of existing building (36 total). Prior to installation the predrilled holes were cleaned using a nylon brush and compressed air. Verified minimum embedment depth of 6 inches, The above listed epoxy anchors were installed using Hilti Hy 150 epoxy. The epoxy anchors were installed in accordance with approved job-site plans and manufacturer's directions. To the best of our knowiedge. the work inspected above was in accordance with the building department approved design drawings, specifications, and applicable workmanship provisions of the International .SuildinQ Code, Contractor was asked to notify our office when additional services are needed. Inspector: Michael Wright If you have any questions regarding this report, please feel free to contact us at 541-746-9649. Respectfully Submitted, Professional Service Industries, Inc. ~: Department Manager c: City of Springfield John Hyland Construction Doug Snider Architect THIS REPORT IS PROVIDED FOR THE INFORMA rlDN OF THE CLIENT QNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED. Professional Service Industries. Inc.. 1040A Shelley St.. Springfield. OR 97477. Phone 541n46.9649. Fax 541046.7163