DAILY FIELD REPORT
Date Performed: February 13, 2007 Report Number: 722-60359-60
Client: Mr. Eric Patterson Project Name: L1thia Toyota.
Lithia Toyota Lube
360 East Jackson Street Project Location: 863 Main Street
Medford. Oregon 97501 Springfield, Oregon
P.O. No.: Permit No.: COM 06-0868
Type of Inspection: Structural Masonry Weather: Cloudy
Quick
Field Observations and Comments
Performed visual inspection of reinforcing steel in the following locations: 5'4" to 8'4" elevation at interior masonry walls (oil
room, compressor room, electrical room), Reinforcing steel was checked for grade, size, lap, placement and clearances
where applicable. Reinforcing steel was placed in accordance with approved design drawings and specifications. All cells
were relatively clean and mortar projections are within the limits of the International Building Code. Perfonned continuou~,
inspection during the placement of grout in the locations listed above. Grout was placed by pump and manuall,'
consolidated. All cells were grouted solid. Note: grout truck ran out with approximately 4'x8" remaining over door at eas"
interior wall. Contractor mixed one sack of mortar to finish pour at this location (PCL sand type S masonry mortar spec.
mix) mixed with cement and pea gravel. To the best of our knowledge, the work inspected above was in accordance with
the building department approved design drawings, specifications and applicable workmanship provisions of the
International Building Code. Contractor was advised of all on-site results
and asked to notify our office when additional services are needed.
Tvoe of Material YrQlIt
Supplier ES&G
Mix# 17
Slump
Air Content
Ambient Temperature
Material Temperature
Time Placed
Design Strength (psi) 2500
Number of Samples
Total YardaQe Placed
Inspector: Chris Thomason, ICC# 5069949.87
If you have any questions regarding this report, please feel free to contact us at 541-746-9649,
Respectfully Submitted,
Professional Service Industries, Inc,
~:=
Department Manager
c: City of Springfield
John Hyland Construction
Doug Snider Architect
Attachment: RFI
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CUENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDusmIEs, IS PROHIBITED.
.~. Feb 14 2007 3:34PM
. En~ i neer i n~ Group
541.218
Memo
Dale: 14 February. 2007
To:
Douglas Snider Arch~ect, P.C,
45 Hawthome Suite 1
Medford. OR 97504
Phone - 541-772-5203
Fax - 541-772-9438
From:
Gary Froehlich. P.E.
Project
Af #:
Re:
Uthia ToyotD Quick Lube Building, 863 Main St. Spnngfield, OR
E1374-2
Grout substitution
The mason contacted us and infolTTled us that as they found that they were two and a half sacks of
grout mix sho'rt while they ,were finishing the interior walls of the addition, They finished the last four
feel of interior walls with a mix of the specified grout, portland cement, sand and pea gravel, This
substibJtion is acceptable. Please contact Ben Unzy. project manager, if you have any ques~ons.
Gary Froehlich. P.E,
[]arvftfilanaenoineerino.com
C: David Shaw, John Hyland Construction
p.2
.,
GROUP
A EGROUP
C1VILa.
STRUCTURAL
ENGINEERING
1357 O::ak Street
Suite"lOO
Eugme. OR 9740!
ph 54J ~I IB2
fn HI 341 IZl9
angcnginccring.c:ltll