Loading...
HomeMy WebLinkAboutPermit Building 1993-10-20 . COMM ERCIAL/IN DUSTRIAL PERMIT APPLICATION . 225 Fifth Street, Springfield, Oregon 97477 ~ ~S )'7f~/h' .r /?-63-~~ / JOB NUMBER 9'"3f#(t!)3 INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK' ASSESSORS MAP' TAX LOT: / b /t:>-t!J> OWNER: /7'/f"7r:4:;~?nT'/""" # ~ ~.- ADDRESS: ~ ' . ~~p- , / DESCRIPTION OF WORK: .4;?'? ~ ~y~ oy,d!$lf ~..- 7 r? ~,.?7" AODITION Y OEMOLlSH OTHER VALUE: '2 '2..- PHON~' CITY' STATF' P/?o ZIP' "77S?-, NEW REMODEL NAME AODRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERA" L!!!i!F ~c...r- r ~~)P~9v../ ~c:;.e~ ~:i>:?.7~/ CONST. CONTRACTOR' EXPIRES PHONE -::s?W'/v_ AP-~", 6B,8-:iYI ~ PLUMBING: MECHANICAl' ELECTR!r^ I. ~__,7,.r:'Y_/> I PLUMBING I NO. FEE CHARGE 1 Single Fixture 1 Relocated Bldg. (new fix. addtl) I Water Service ft. I Sanitary Sewer ft. I Storm Sewer ft. 1 Backflow Device 1 MECHANICAL ",,,' ~~~ I r:HARGE- Furnace/ burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duel Permit Issuance $10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOO PLAIN' QUAD AREA: . OF BLDGS: LAND USF' . OF UNITS' ZONING: OCCY GROUP: CONSTR. TYP~' LIGHTING POWER BUDGET: . OF STORIE~' HEAT SOURCE: WATER HEATER' i. ih 1(' SQ. FT. $/SO. FT. VALUE SQ. FTG MAl N X SO. FTG ACCESo x SQ. FTG OTHER .X , TOTAL VALUE OF PROJECT ;;?'2t::1'7? I BUILDING PERMIT 15% Stat,e Surcharoe I MECHANICAL 15% State Surcharae 1 PAVING '3J!. f!;>t!> /-~3 1 PLUMBING 15% State Surcharoe I FENCE VALUE $ I SIDEWALK I CURB CUT DATE /"-~~::r BY ~ ~ DEMOLITION PLAN CHECK FE!' zS-P~ RCPP~::?g FT. I SUBTOTAL PERMITS I SYSTEMS _ DEVELOPMENT 7'~"O //,4- FT. TOTAL PERMIT FEES I EXCLUOING ELECTRICAl 65: 71b l') . REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received b6.tore 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work ~ay. SITE INSPECTION: To be made after excavation, but' prior to setup C?f forms. . .' UNDERSLAB PLUMBING;:, ELECTRICAL & , -" -." MECHANICAL:~To be made before any work is cover~d,_...~,,~..:' )( )l9"'il! pi UMBING, _ -qtECTflJ(;~ MECllANICAL: No work Is to be covered until these inspections have been' made and approved. PAVING: After gravel is in place but prior to placing as phalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but_ prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner I Contractor during construction of the following work. A copy of the special testing reports shall . be- furnished to the Building Division. ATTIC DRAFT STOPS & -CUR'rAfN~,WALLS- " CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pi pes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 RS.1. (306 a,1) STRUCTURAL WELDS: Performed on the job. (2722 f) UNOERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. INSULATION & VAPOR. . ,BARRIER: To be made after all insulatlon and required vapor barriers are In place but before any lath or gypsum board Interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed ~ccording to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U,B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION ANO FILLING: Ouring earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing. LATH ANOIOR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. . GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.S.G. STDS. 25.10.11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *In addition to the Inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING ANO NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. ------------------------------------------------------- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish Inspection. All proJect conditions such as landscaping, parking lot stripil}g, etc. must be completed before requesting this Inspection. x' FINAL ELECTRICAL x FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENT'" PLANS REVIEWED BY //~ 4- DAT~ /6-::;>~ -9:r By signature; I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Sulldlng Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. . I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during co):)ruction. Slgnatur~ ~J.J cR, '#. I J. R ~ Date /0- "2.0 - 93 VALlOATION: AMOUNT RECEIVED: ~ ~-- RECEIPT': 1L962fi$ 4r Y-' DATE PAlO: RECEIVED BY: /~-":2PJ'7?: /'/-. "'"- - ---- 'jr' - -