HomeMy WebLinkAboutPermit Building 2001-7-30
.
I Job# 01-00796-01 I
..
Page 1 of 2
TRANS#:01-0006273
DATE: JUL 30 2001
AMT RECD:2 $ 121.56
CHANGE:
CASHIER: 061
.;.... SPRINGPIELD
~-
CITY OF SPRINGFIELD, OREGON
I
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 01-00796-01
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
location Of Proposed Site: 660
Assessors Map#: 17033531
lot: Block:
Main St Spr
Addition:
Tax lot #: 09000
Subdivision:
*
Owner:
Chuck Larson
2201 WiIlamelte
Phone Number: 541485-0426
City/State/Zip: Eugene. OR 97405
New Value: $14,700
Address:
Scope Of Work: Reroof
Contractor Type
General Contr
,0
^\}. .~..\
, 0"" \)~" ~'
Registration # Expira.tJ~~-l,Date~'\~I:II,)'\'Phone
\'<.10 -.(0 '!..0~ a: ~'-\
137203 5/,111/2003",!a' ",,-oJ:' ,541-746-5000
0'" ". ~.. \>-~. \~'- 0
~0({, 0'0'1 0'V' 0 C<;\0 0(:' ~
,.0 .\" ,,<:; ,r.~ _, ~ ,_<:>"" .,,0
~\V' '1;00' ,:" >I$',v",0'" 0''0' ,,~'v'
<"_~ !eo ^,0 ,1:1 0'<' ,;S< ~o
~'v (s,0 CP' .1,)1,) :^ c; ,\~. ,{,\,\ _ .1).,.
land Use: \>- o~ 'o~ ,,1:1' ~,'Of\,!3U1I!!mg.%:1"
O~ ^"!> n-" ,\ 0 .(, .<\ r!'
Zoning Code: ~ ,~\c;O' q,~" ",,'1;" Occul1ancy'Group:
__\.o~ ~ :V '\~. c0" r\~~ ',C'\'-J
Bedrooms: '-: O~ ~o >1$'0 ~1;!e,~t\Source:
Range: ~ !::lq,I,)' '/i.,~Q, .\0' SSl~'Footage:
t"j _~ .1'),'\ ...(\\;
- ~v v-
To request an inspection call the 24 hour recording at 726-3769, All inspe~tions requested before 7:00
a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following
working day,
Reroof
Contractor
River Roofing Bend Lie
1484 South B St, Springfield, OR 97477
Office Use
Quad Area:
# Of Units:
Constr, Type:
Water Heater:
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access? D
["'Area (Sq. Feet)
I Main: Accessory:
Required Inspections ~'t-
I Building I x,\,\~'t\O 0'
-Prior to installing any roof covering, s:>\~~ ~ ~\' \'0 ~
- Before covering sheathing witt).(inlsfi:materiah,\.. ~~ ,S ~~'?I f(0~
-When all required inspectioriS:ha~~iieen jjp'prov~n'a \Ile\tlUllding is complete,
.. ?~~w' '\:)~IJ""" \>.~V'"
,\,\\'0 ~\t~\) ~ \'0 \>.~
\>.'\:),\,\0 <;.~C~\)O ~~\O\),
CO~>JI.' \)\>.'1 ~
c( \?;()
\>.~ Height (feet):
Proposed Units:
# Of Stories:
Current Units:
Census Code: Does not apply
Roofing
Roof Sheating/Nailing
Final Building
Total:
.
,
Job# 01-00796-01 I
Paid On Receipt#
Building
07/30/2001 6273
07/30/2001 6273
07/30/2001 6273
Fee
.
Page 2 of 2
Value/Quantity Fee Amount
I
14,700 $110,50
$7,74
$3,32
$121.56
$121.56
7--10-0;
Date
E
I.J OJ
Z~
u::'"
o 00
0-.2
'" 0
w 0
Z'"
<(~
"'0-
CO'
::db
w c
:::EiJi
........
U~r"')
.ECj)~
00=
.S :J VI
~ 00:J
o :J 00
o ~ :J
"'~<(
~
'"
-J
,
e
:J
o
.'
1. PROUDCT NAME .
Ouro-Last~ Specially Formulated
Roofing Membrane
2. MANUFACTURER
Duro-Last Roofing, Inc,
S25 Morley Drive
Saginaw, MI 48601
Phone: (517)753-6486
(800) 248-0280
FAX: (800) 432-9331
Branch Offices:
Grant's Pass, OR
Phone: (800) 356-6646
Fax: (800) 566-2698
Jackson, MS
Phone: (800) 434-3876
FAX: (800) 566-4478
3, PRODUCT DESCRIPTION
Basic Use:The Duro-Last single-ply
roofing system is a prefabricated
waterproofing system used in the fol-
lowing applications:
. Re-cover over existing systems
. New construction
. Both combustible and noncombus-
tible decks,
Limitations: Duro-Last Membrane
must not be installed over assemblies
with saturated underlying insulation or
directly over existing roof without the
proper separation,
Composition and Materials: Duro-
Last Membrane is a proprietary ther-
moplastic formulation consisting of
resins, plasticizers, stabilizers, fungi-
cides, flame retardants, and u,v. ab-
sorbers which is laminated to a weft
inserted polyester fabric, It is available
in white, tan and gray,
Sizes: For ease of handling and re-
duced field seams and installation
time, Duro-Last Roofing, Ine.
dielectrically welds material in large
sheets, up to 230 square meters (2500
square feet) as specified by architects,
contractors or installers,
Accessory Components: Duro-Last.
Ine. produces a complete line of stan-
dard and custom fabricated accesso-
ries. These accessories are made (rom
the exact same membrane as the roof-
ing sheets and are made in the Duro-
Last factory, not on the roof.
Standard Accessories: Round pipe
flashings from 2,5 cm (1 ") to 38 cm
(15") in diameter, inside and outside
corners, two-way roof vents, roof drain
~
OJ
"
OJ
~
Ii;
"-
:J
~
Th.. len-i><';nl SPEC.OATA., Iormal hllB, "'," re' ~
produced !rom publications Copyrighled by C.SI, ...
1964.196S,l966.1967,anduslKlbypoerml$SlOO ~
01 The Conslrucbon SpecificallOns Instltute,AIex-
andria, VA 2231'-'
liners, dripedge. gravel/water stop witheg P EO C
factory welded Duro-Last skirts. termi- _
nation bar, and fascia with cover and
joint clips, ~
Custom Made Accessories: Round This Spec-Data sheet conforms
pipe flashings greater than 38 cm to editorial style prescribed by ~
(15"), parapet wall flashings, scuppers The Construction Specitications
and curbs for all types of roof penetra- Institute: The manufacturer is ):!
tions, i,e" HVAC units, skylights, chim- responsfble for technical ac-
curacy.
neys, ete. @
If there is a need for a custom flash-
ing which has not been mentioned,
send in a drawing and if it can be
made, Duro-Last will make it.
Applicable Standards: Underwriters
Laboratories, Ine. Class A and B (R-
10128); Factory Mutual Research Class
1-60, 1-90 and 1-150; Dade County,
FL; City of Los Angeles, CA; City of
Denver, CO; HUD Material Release
1223; City of New York, NY 421-90-
M and 422 90-M; ICBO-SBCCI-BOCA
(NER-227)
4. TECHNICAL DATA
Please refer to page 2 for physical
properties and test results,
5. INSTALLATION
Duro-Last Roofing, Ine. provides de-
tailed application instructions and
training for roofing contractors and
consulting services to architects, en-
gineers, and specifiers, The following
are general instructions for installing
the Duro-Last system,
Deck Surface Preparation: The sub-
strate on which Duro-Last membrane
is to be applied must be clean, smooth,
free of sharp edges. loose debris and
standing water. Gravel should be lev-
eled, All surface preparations must be
done in strict accordance with the
Duro-Last application specifications,
Insulation: Insulation must be laid
on the deck and cut neatly around all
penetrations, It must then be mechan-
ically attached with approved fasten-
ers according to the Duro-Last
specifications, Do not lay more insu-
lation than can be covered in the same
day, Stagger the insulation boards 50%
from row to row.
Placement: Using the roof layout di-
agram, select the proper marked and
rolled pre-manufactured sheet of
Duro-Last membrane, Orient the
membrane so the fastening tabs are
perpendicular to the ribs or corruga-
tions of steel deck or to the width or
pre-stressed concrete "T" slabs. Secure
the membrane to the roof deck
through the fastening tab with ap-
proved fasteners and plates, in accor-
dance with Duro-Last specifications,
Unfold the sheet thus covering the fas.
tening tab, Continue unfolding until
the next fastening tab appears, Fasten
this tab to the deck and repeat the
above until the complete sheet is in-
stalled,
Penetrations: During the aforemen- Z
tioned procedure, make cutouts in the ()
membrane for protrusions, Fasten
around cut outs with Duro-Last ap-
proved fasteners, The skirt of the fac-
tory fabricated accessories when
welded to the deck membrane, will g'
cover these cutouts. -c
~
Breather Vents: One Duro-Last two- ~
way breather vent must be installed ~
for each 90 square meters (1000 sq, ~
ft.), Duro-Last vents must be installed
according to the Duro-Last Specifica-
tions,
Parapet Walls: Duro-Last custom
fabricated parapet wall flashings are
designed for each individual applica-
tion, Secure through the fastening tab
at the bottom of the wall using ap-
proved fasteners and plates, The fac-
tory dielectrically welded skirt will
cover the fasteners when it is heat
welded to the deck sheet.
6. AVAILABILITY AND COST
The Duro-Last roofing system is
available throughout the United States
and Canada through the Duro-Last
Dealer/Contractor network and our
area representatives, For pricing infor-
mation contact Duro-Last Roofing, Ine.
for the nearest Duro-Last Representa-
tive.
7. WARRANTY
Duro-Last Roofing, Ine. will furnish
to the building owner either a 20-year
or 15-year warranty for water tight-
ness.
The 20-year warranty covers both
material and labor for repair or re-
placement for the first 10 years, The
second 10 years is prorated and cov-
ers material only,
The 15-year warranty covers mate-
rial and labor for repair or replacement
for the full 15 years,
07500
~~!
~
, .'
rE
:t>C
(/):;0
-iC
." I
;,. ;,.
c c
0000
:;; c
~ ~ ,
-' = q
cD cD '
i..O I.D:
~ t..n!
.......
~3:
:J m
~3:
'P '"
:!!~
-< Z
6'm
o ;0
=>0
.;g 0
",-n
~ Z
roC)
3
.
.
"
.
.
DURO-LAST
PHYSICAL SPECIFICATIONS
Thickness ASTM 0-751 ,040 in, (lmm) nominal
Tear Strength
Tongue method ASTM 0-751 130 x 110 (57SN x 49SN)
Breaking Strength ASTM 0-751 430 x 350 (19l3N x l557N) I
EMMAQUA ASTM E838 >6,1 Million Langleys
Exposure Oesert Sun (255,260 MJ/m')
Elongation ASTM 0-751 >27%
Oimensional ASTM 0-1204 <1%
Stability
Low temperature ASTM 0-2136 no cracks
fiexibility I/S" (3,2mm) mandrel -40F (-40 C)
Oynamic impact Fed, Std, 10lB 250# (1112N)
( Puncturing) Method B
Water vapor ASTM E96 WVT
Transmission Procedure B <,30 US Penns
Method A 0,087 glhr/m'
Accelerated Carbon Arc No cracks, crazing
Weathering 6000 hrs or blistering
Accelerated ASTM G-5388 No cracks. crazing
Weathering UVB-313 2000 hrs or blistering
Lamp@80C(176F)
Factory Mutual ASTM E-l08 Class I 1-60, 1-90 & 120
Research
Underwriters UL-790 Class - A, B or C
Laboratory UI-1897 UL-150
3
INTRODUCTION
DLSPEC-REV-8196
^
.
.
.
/"""'.
( I
10, Dcck: C-15/32 Incline: 1
Slip Shcct: Atlas encrgy Products "FR-10",
Insulation: One of the following, 2 in, min thickness with,
all jointS staggered 6 in, (min) from pl~ood joints,
A. Atlas Energy Products "AC Foam I" or "AC Foam
n"
B, Cclotcx "Hy-Thenn AP"or"Hy-Tcc (Encrgy-Loc)",
C, Apache Products "Apachc Pyrox" or "Apachc
White Line",
D, NRG Barriers "E'NRG'Y 2G",
E, Fircstonc Building Products "ISO 95+GW""
F, R-Max "Multi-Maxl!!l FA",
Mcmbranc: "Duro-Lasl@"(PYC),
II. Dcck: C-15/32 Inclinc: 1/2
Slipsheet: Atlas FR50,
Mcmbranc: "Duro-Lasl@"(PYC),
12, Dcck: C-15/32 Sce Note I Inclinc: 4
Barrier B~ard: Georgia.Pacific ~ in. (min) "Dens Deck@
Ovcrla)1TICnt" with all joints staggered a min 6 in. from
plywood joints,
Insulation (Optional):
A. Atlas Encrgy Products "AC Foam I" any thickness
mechanically fastened or adhered.
Mcmbranc: "Duro-Last@"(PYC),
13, Deck: C-15/32 Sec Note I Incline: 3
Barrier Board: Georgia-Pacific V. in, (min) "Dens Dcck@
Overlaymcnt" with all joints staggered a min 6 in. from
plywood joints.
Insulation (Optional):
A. RmAX "Multi-Max" or NRG Barriers "E'NRG'Y1"
any thickness mechanically fastened,
B. Schuller International "UllraGard Gold", any lhickness
mechanically faslencd,
Mcmbranc: "Duro-Lasl@"(PYC),
/\
\,\\
\)15,
14. Deck: NC Incline:
Insulation: ESI "ES Foam I"
minimum, mechanically fastened.
Mcmbranc: "Duro-Lasl@"(PYC),
No Limitation
any thickness, V,-inch
Deck: C-15/32 Incline: I
Slip Shcct two 1aycrs of Atlas Roof Products "FR-IO" ,
Insulation: ESI "ES Foam r' any thickness, V,-inch
minimum, mechanically fastened.
Mcmbrane: "Duro-Lasl@"(PYC),
New Construction or Full Tear-off
Mechanically Fastcned - Class C
I.
Deck: C-15/32 Incline: 1
Slip Sheet: Atlas Energy Products "FR-IO",
Insulation: (Optional) Atl.. Encrgy Products "AC Foam
II", R.Max "Multi-Max", Manville "Iso 1 ", Celotcx "Hy.
Tee", "Star AP", or "Hy-Thenn AP", any thicknc....s.
Mcmbranc: "Duro-Last" (PYC), mechanically fastencd
REv'/J/OJ/99
UL-5
.
Maintenance & Repair
Mechanically Fastened - Class A
I. Dcck: C-15/32 Inclinc: 1/4
Existing Roof System: Class A. B or C covercd with:
Barrier Board: Gypsum, ~ in. min.
Insulation Optional
A. Celotex "Star- APn or "Hy-Tec", any thickness.
B. Alias Energy Products "AC Foam I" or AC Foam
n", any thickness,
C, Owcns-Corning "Roof Deck Boards",
Mcmhranc: "Duro-Lasl@"(PYC).mechanically faslcned,
2,
Deck: NC Incline: 3
Existing Roof Systcm: Class A gravel surfaced,
Mcmbrane: "Duro-Lasl@"(PYC),mechanically faslened,
3,
Deck: NC Incline: ~
Existing Roof System: Class A, S, or C covered with:
Insulation (Optional):
A. Any UL Classified polyslyrcne insulation (tapered
or unifonn thickncss) any thickness covercd with
Lydall 20 mil "Manniglas 1200" or Alias Encrgy
Products "FR-I 0",
B. Celotcx "Star- AP" or "Hy-Tec", any thickness.
C, Atlas Energy Products "AC Foam I" or "AC Foam
II", any thickness.
D, Owens-Coming "Roof Deck Boards",
Membranc: "Duro-Last@"(PYC),mechanically fastened,
-)(
Dcck: C-3/4 Inclinc: V.
Existing Roof System: Class A covered with:
Memhranc: "Duro-Lasl@"(PYC),mechanically fastened,
5,
Dcck: C-15/32 Inclinc: V.
Existing Roof Systcm: Class A, B or C gravel surfaced,
Thc gravel musl be maintained al400 lbs.lsq,
Separation Sheet: Type 30 or G2 (45 lb,) base shect,
Lydall 10 mil "Manniglas" or underlayment boards
consisting of Amoco Foam Products "Amocor P14, PB4,
PB6, PB6W or Duro-Fold 1M',
Membrane: "Duro-Lasl@" (PYC), mechanically faslencd,
6,
Dcck: C-15/32 Incline: '/.
Existing Roof System: Class A, B or C BUR system,
smooth surface covered with:
Slip Shcel: One layer Lydall "Manniglas 1151", foil side
do"" or lwo layers of Alias RoofProducls "FR-IO",
mechanically fastened.
Membrane: "Duro-Lasl@"(PVe), mechanically fastened.
,-
j"..F ~ ,
/ /
I
/
I
-:)
,
/
'j
UL & ULC Nov 99.doc
.'
.'
.'
TEST DESCRIPTION
Thickness, Nominal
Tear Strength, Minimum
Breaking Strength
tMMAQUA Exposure
Elongation
Dimensional Stability
Low Temperature Cracking
Dynamic Impact (Puncturing)
Moisture Vapor Transmission
Accelerated Weathering
Factory Mutual Research
Underwriters laboratories
.
DURO-lAST PHYSICAL PROPER.
TEST METHOD
METRIC RESULTS
ENGLISH RESULTS
,.-
40mils
130 x 11 0 Ibs,
430 x 350 Ibs,
> 6.1 Million Langleys
27%
<1%
No Cracks -40.F
250lbs,
.30 U. S. Perms
No Cracks, Crazing or Blistering I
Class '-60. '-90 and '-150
Class A, Band C
Factory Welded Tab
Factory Weld
ASTM D 751
I ASTM D 751 (200 ~ 200 mm S..mple)
I ASTM D 751 G"b Method
I Desert Sun ASTM E B3B
I ASTM D 751
I ASTM D 1204 BOT. 6 hrs,
I ASTM D 2136 3mm Mandrel
I Fed, Std, '01 B - Method B
I ASTM E 96 Pro B, Method A
I Carbon Arc (6,000 hrs,)
I ASTM E lOB; FM 4450-70
I UL,790
I mm
57B x 4B9 N
1.913 x 1.157 N
205.213 MJ/m'
27% J
<1% I
No Cracks -40'( I
1.112N I
O,OB7 gihr/m' I
No Cracks, Crazing or Blistering I
Class 1-60.1-90 and 1-150 I
Class A, Band C I
Fastener With Stress Distribution plate
8. MAINTENANCE
Keep the fi n ished roof free of de-
bris, Do not use roof area for storage,
No other maintenance is required,
9, TECHNICAL SERVICES
Duro-Last Roofing. Inc. provides a
consulting and design service to ar-
Technical field service is available
through Duro-Last Field Quality As-
surance Specialists,
chitects,engineers and licensed con-
tractors for specifying and detailed in-
stallation of the Duro-Last roofing
system for various field applications,
Technical brochures, manuals and
specifications are available upon re-
quest.
10. FILING SYSTEM
. SPEC-DATA"' II
. Sweets General Building File
07500/DUR- BuyLine 2998,