HomeMy WebLinkAboutPermit Building 1993-5-6
.1 '\
.
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
~
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK: . t:;::? 7 /~f2//f/
J?-~~~?S'~:l/
c;~7f'/"~A>' -
ASSESSORS MAP'
OWNER:
J?/L~ 7:J
{
.. - ,
AOOR~~C:'
CITY'
c:?..>"'- "
STAT'"
.
JOB NUMBER
'7~~~
INSPECTION LINE: 726.3769
OFFICE: 726.3759
TAX LOT: 8"':? y~
PHONf'
ZIP:
DESCRIPTION OF WORK:
bq~;:~ FPCr,~~./LLC:-
ADDITION
"-7.>. .
~~.~ ,~?,..---
",
OTHER
5i:~,. ~~ .
NEW REMODEL
NAME
ARCHITECT'
DEMOLISH
ADDRESS
VALUE:'" ~-::S;. ~
PHONE
CONST.
CONTRACTOR'S NAME ADDRESS L~ CONTRACTOR' EXPIR.ES PHONE
GENERAL:~/ ~~;f~'4" ~ "3J"'-~~~~ ''''i'7''~; ~-7J7j ~Y':?-~/7?
PLUMBING'
MECHANICA' '
ELECTRICAl'
PLUMBING
NO.
Single Fixture
Relocated Bldg.
(new Ilx. addU)
Water Service
It.
Sanitary Sewer
It.
Storm Sewer
It.
Backflow Device
FEE
CHARGE
TOTAL PERMIT
TOTAL PERMIT
I
I Nn
I
I
I
I
I
I
I
I
I
I
I
I
QUAD AREA'
LAND US".
- OFFICE USE -
. OF BLDG~'
. OF UNIT'"
OCCY GROUP:
CONSTR. TYP'"
. OF STORIE'"
HEAT SOURCF'
Sa. FT,
SQ. FTG MAl N
SQ. FTG ACCESS
SQ. FTG OTHER
x
X
fr/?-.--~::-
X
PLAN CHECK FEF
RC PT'
I BUILDING PERMIT
15% State
Surchar9_e
I MECHANICAL
15% State
Surcharae
I PAVING
PLUMBING
?b- Sc::>
::< . s :::
5% State
Surcharge
I FENCE
VALUE $
I SIDEWALK
I CURB CUT
I
I"
$ISQ. FT.
DAT"
FT.
FT.
MECHANICAL
I
"HARGE-
"""
Furnace/burner & vent
< 100,000 BTUs .
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent SystefD apart
from AC or htg.
Mechanical exhaust
hood and duct
I
I
I
I
I
$10.00
Permit Issuance
HANDICAP ACCESS:
FLOOD PLAIN:
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER'
VALUE
.:;-=? ~ '=? C>r>=a
TOTAL VALUE OF PROJECT
BY
DEMOLITION
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
5'"'? '33'
.
REQUIRED INSPECTIONS
.
,
,
"'!.
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wilt be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
.be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
CONCRETE SLAB: To be
made after all inslab building
service equIpment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete Is placed.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and requIred vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering is
applied. .
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans. .
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing.
LATH ANDIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, is in
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
FLOOR INSULATION &
VAPOR BARRtERS: To be
made prior to installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
USC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof coverl ng.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the fOllowing work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a,1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.S.G.
Standards 43.8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U,B.G.
STDS. 25.10,11).
v
STRUCTURAL MASONRY: (306
a.7)
~j.-""r7~/~ #
.~h~W"#).
~ ,"" ~ ~.:s;'
.TS~~ th~in$jj"ec.
lions specified, the Building
OfficIal may make or requIre
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
/
FINAL PLUMBING
-------------------------------------------------------
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project co~dltions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premIses.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
DAT"
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permIssion of the Building Safety DivIsion. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the
street, that the perm ard Is located at the front of the property, and the approved set of plans will remain on the site at all
times d,urlng con ucti n. ... I
Signaturo ~ .P~~ Datp
VALIDATION:
"5'1'- '9',3
~-::;'9S
AMOUNT RECEIVED:
RECEI PT ':
DATE PAID'
RECEIVED SY.
~/93
S-:b~7
~~
,~:- .
~ ~
I. I-~
" t ~ -
C>
..
c:
';;
0 10
'"
Co
'"
J ~'
~ 1.0-.:."
N
9"
~
'.
'r
.
Four Ply
Mineral-Surface
Fiber Glass
Built-Up Roofs
"
.'
Manville
U,L. Classifications
Class A
Max. Slope: 1"
Deck: Non-Combust.
& Combust.
Insulation: none
Surfacing: Cap Sheet
Class B (see Clsss A)
Class C (see Class A 8< B)
eil'~(~"',':"","_"~"",-"""",",,,~,,;,' . 'A"_'~
Naitable Deck
Sheathing Paper
(It Required)
GlasBase
orVenlsulalion --
.
\
Sp~Cifi(;HIi()n !'AO. 4GNC
For use over Plywood or other
Nailable Decks on Inclines of W'
to 6" per Foot
For Regions 2 & 3
....~
Asphalt - -
ASPhalt~ j:..,.".
'"..:'-=-:~..... ...".
'"t,; .....,:
.~.. 2" ,:,':' . .. ,':
'" GlasKap
Mineral Surface
'.CapShe~t, . '.'
, End Laps Broken
:.' 3' Apart. (Mi~.) . '
',.. ,_ r. .. .
.:.:"......:: ,',:,-;.: ....-...
'.. .' 6" End ...1....,....,
.7....~.:\
, . ,'.' ..'
. .. . . .
-F18"--i
,-
Co
'"
Nails
-- .
Asphalt -
~
- --r0-
t
2'
Co
'"
Gla:PIY I
Premier or
GlasPly IV -
,
hiil!.".-..~'.:..;, ,lh',.,,,L."",-~'\~~~',,,,;\,,:.;,,-.-.,-",' -~.. ..'-;"-"",." ,,.,;-".,,,._ ~,'" '0,_ ~_
.01 Guncfal
This specification is for use over any type of structural
deck (without insulation) which can receive and ade-
quately retain nails or other types of mechanical fas-
, teners as may be recommended by the deck manufac-
turer. Examples of such decks are wood and plywood.
This specification is not for use over lightweight insulat-
ing concrete decks either poured or pre-cast or over fill
made of lightweight insulating concrete,
Note: All general instructions contained in the current Manville
Industrial/Commercial Roofing Systems Manual shall be con-
sidered part of this specification.
Flashings: See section on BUR Flashings, Manville
Industrial/Commercial Roofing Systems Manual.
.02 Maledals fJl;/ 100 S(I. It 01 /uul :tleiJ
Sheathing Paper: Wood board decks only . . .1 layer
Fells: GlasBase ,. or Ventsulation" Felt , , . , , " 1 layer
GlasPly'" Premier or GlasPly'" IV' ......,.,. 2 plies
GlasKap" Mineral Surfaced Cap Sheet 1 layer
Bitumen: Refer to Para. 7.7 or 11.0.3.2
Approx. installed weight (Ibs.): 165-245
Prior to application, cut the cap sheet into handleable
lengths (12'-18') and allow to flatten.
.03 Application 01 Hoofing
Over wood board decks one ply of sheathing paper must
be used under the base felt next to the deck.
Using GlasBase, start with a 12" width, FOllowing felts to
be applied fuil width, lapping each fell 2" over the
BU.S60$cc.1I Pg.16 ll-a7
preceding one, Nail the laps at g" centers and down the
longitudinal center of each fslt nail two rows of nails with
rows spaced approximately 11" apart and nails stag-
gered on approximately 18" centers. Use nails or fas-
teners appropriate to the type of deck, See Fastener
Data in general instructions,
Starting at the low edge of the roof area apply one 18"
wide, then a full 36" wide GlasPly Premier or Glas Ply IV,
All fOllowing felts are to be applied full width overlapping
the preceding felt by 24'13', giving 3 full plies at all points,
Install each felt so that it shall be firmly and uniformly
set, without voids, into the hot (within 250 F of the EVT)
asphalt applied just before the felt at a nominal uniform
rate of 23 Ibs. per square over the entire surface.
Starting at the low edge of the roof area, apply one layer
of the cap sheet, being sure to maintain 2" side laps and
6" end laps over the preceding sheets. Apply the cap
sheet in a full width mopping of hot asphalt (approx.
200F above the EVT to maximize bonding of the cap
sheet to the ply sheets) at the approx. rate of 23lbs/sq to
the ply sheet(s), aiso applying asphalt to the side lap
area on the backside of the cap sheet. Then flop the cap
sheet into the hot asphalt. At ambient temperatures
below 700 F, see the cold application section of the
Manviile Industrial/Commercial Roofing Systems
Manual. The cap sheet must be firmly and uniformly set
into the hot asphalt with all edges well sealed. Forslopes
Nailing: For slopes greater than 1" per foot: nailing is
required, Refer to Para, 11.0,6,
"GlasPly Premier required for No Dollar Limit (NDL) Guarantees.
I
I