HomeMy WebLinkAboutPermit Building 2002-11-6
.
.
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
*
. "'
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: 02-00980-01
ISSUED: 11106/2002
APPLIED: 08/14/2002
EXPIRES: 05/06/2003
VALUE: $ 488,005.00
SITE ADDRESS: 630 Main St
ASSESSOR'S PARCEL NO.: 1703353108900
Spr
TYPE OF Commercial Miscellaneous
TYPE OF USE: Remodel Commercial
PROJECT DESCRIPTION: Remodel theater building. Phase I, Demolition and reroof, existing structural only.
Phase 2, Remainder of structural, interior remodel & marquee extension.
Owner: Springfield Renaissance Dev.
Address: POBox 155 Springfield OR 97477
Phone Number: (541) 736-0503
I CONTRACTOR INFORMATION I
Contractor Type
Architect
General
Role Type Null
Owner
Contractor
Poticha Architects
CHAMBERS CONSTRUCTION
HOHBACH - LEWIN, INC
Springfield Renaissance Dev.
License
Expiration Date Phone
(541) 686-9466
541-349-1701
(541) 736-0503
BUILDING INFORMATION I
Vlhr
# of Stories:
Height of
Type of Heat:
Water Type:
Range Type:
Energy Path:
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport:
Sq Ft Other:
Impervious Surface Area:
# of Buildings:
Primary Occupancy Group:
Secondary Occupancy
P'rimary Construction Type
Secondary Construction
# of Bedrooms:
A-2.1
SETBACKS
Front yard Setback:
Side 1 Setback:
Side 2 Setback:
I DEVELOPMENT INFORMAT,10N'I\li IUI\l,uregor, ,,,II> re4ull"'~ u','"
TOIIUW rules adopted REQUrRED'PA~KliN'G
, Notilication Center, Those rules are seT 10
Overlay Dlst: , OAR 952-001-0010 illp.Y1.'iJh OAR 952-00 . '
# Street Trees In bt ' Handicapped:, rules u
Paved Drive Rqd: 00~~il~~~:a!e~te~~~1~8mPr~~~\~I~~ho~e'
% of Lot Coverage: numberforthe Oregon Utility NotlllcaliOn
Cenle! i~ 1-Ron-:'\'1'.i-?:ll.4\.
Rearyard Setback:
Solar Setbacks:
IPUBLIC IMPROVEMENTSI
Street
Storm Sewer Available:
Special Instruction:
Sidewalk Type:
Downspouts/Drains
Notes:
Not\CE: XPIRE IF 1HE WORK
1HIS PERM\1 ~~~~~ \H\S PERM\1 IS N01
AU1HORIIEDD OD IS ABANDONED FOR
COMMENCE n
ANY 160 DAY PERIOD. ,
1 of 5
I .
.
. CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: 02-00980-01
ISSUED: 11/06/2002
APPLIED: 08/1412002
EXPIRES: 05/0612003
VALUE: $ 488,005,00
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Valuation Descrintion I
Desc ription
Bid Amount
Type of Construction
Use Bid Amonnt
$ Per Sq Ft
$1.00
Square Footal!e
488,005.00
Value
$488,005.00
$488,005.00
Date Calculated
11105/2002
Total Value of Project
Fees Paid'
Fee Description Amount Paid Date Receipt Num ber Received By
Fire & Life Safety Plan Review $806.06 8/14/02 10282 djb
Commercial Plan Check $1,309.85 8/14/02 10282 djb
+ 7% Stale Surcharge $3.15 10/14/02 1200200000000000058 djb
+ 8% Administrative Fee $3.60 10/14/02 1200200000000000058 djb
Additional Plan Check $20.28 10/14/02 1200200000000000058 djb
Demolition $45.00 10/14/02 1200200000000000058 djb
+ 7% State Surcharge $3.50 11/4/02 1200200000000000183 djb
+ 8% Administrative Fee $4.00 11/4/02 1200200000000000183 djb
Temp Power 200 amps or less $50.00 11/4/02 1200200000000000183 djb
+ 7% State Surcharge $3.15 11/6/02 1200200000000000200 djb
+ 8% Administrative Fee $3.60 11/6/02 1200200000000000200 djb
Miscellaneous Plumbing $45.00 11/6/02 1200200000000000200 djb
+ 7% Slate Surcharge $128,09 11/6/02 1200200000000000200 djb
+ 8% Administrative Fee $146.39 1116/02 1200200000000000200 djb
Building Permit $1,829,90 11/6/02 1200200000000000200 djb
Total Amount $4,401.57
Commercial Plan Check $1,309.85 08/14/2002 10282
Fire & Life Safely Plan Review $806.06 08/14/2002 10282
Total Fees Paid Prior to 9/30/02 $2,115.91
I Plan Reviews I
2 of 5
lIIr~r-T8~J
, '
-"\"- '-
......-
Status:
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Fire Marshal-CII/P
Initial Review-CII!P
Structural Review
Structural Review
Structural-CIIIP
.
10/03/2002
10/29/2002
10/2112002
08/15/2002
10/03/2002
10123/2002
APP AG
Appr
10
APP
Pend
3 of 5
. CITY OF SPRINl> 1<lJ!.LD
Building/Combination Permit
PERMIT NO: 02-00980-01
ISSUED: 11/0612002
APPLIED: 08/14/2002
EXPIRES: 05/0612003
VALUE: $ 488,005.00
I. Plan Review - Phase I,
Demolition, Theater remodel,
Occupancy A2.1
I. Fire Department. Standpipes will
not be required due to limited
combustible load anticipated and
limited ceiling height in the
performance area.
2. Provide installation, pressure test
flush of fire line in accordance with
NFP A 24 from the point of public
connection forward to the building
sprinkler system.
3. Demolition procedures are to be
carried out in compliance with teh
code requirements as set forth in
Article 87 of the Uniform Fire Code
as adopted hy the City of
Springfield.
LH
DLM
FedEx'd the following to Tom
Rogers today I. Response to Plan
Review Comments from project
engineer, 2. Structural Plan
Revisions dated 9/19/02 (w/llxI7
drawings), 3. Supplemnetal
Structural Calculations, 4.
Geotechnical report. dim
Structural modifications only. Fire
& Life Safety review is not
completed.
Fed Ex'd Addendum and structural
calculations.lh
TR
TR
Status:
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural-CIIIP
.
08/26/2002
4 of 5
. CITY OF SPRINGFIELD.
Building/Combination Permit
PERMIT NO: 02-00980-01
ISSUED: 11106/2002
APPLIED: 08/14/2002
EXPIRES: 05/06/2003
VALUE: $ 488,005.00
Wait TR
Preliminary plan review revealed
the following in part. See job file for
complete letter and code references.
I) The occupant load of the stage
combined with the seating would
resull in an occupant load exceeding
300. The occupancy classification
for the building will be a group A
Division 2.1. Please make the
necessary modifications to the
construction documents for this
classification. 2) Please specify the
distance from the building to the
center of the alley, lOess than 10
feet, openings in the wall need to be
protected. Due to the construction
of the alcove for the exit doors,
protection at the exterior wall is not
practical. As an equivalent
protection, all construction in the
alcove must be one hour rated with
3/4 hour doors. 3) Depending on
the distance to the center of the
alley, parapet construction, or
ceiling rating, provisions of the
OSSC may need to be addressed.
STRUCTURAL I) Calculation
page 23 specifies a 5x5x5116 tube.
Where is the thickness of the tube
specified on the plans? 2) The floor
framing plans do not correspond to
the structural calculations. Provide
revised calculations for review. 3)
Calculation page L17 specifies an 18
inch footing for the interior CMU
wall, whereas detailll/S5.3 shows
12 inch thickness. Please clarify. 4)
Calculation pages L21 and L22 do
not use the verticle distribution
provisions of OSSC. Provide revised
calculations for review. 5)
Calculation page W3 specifies 4 inch
nail spacing for the subdiphragm,
Where is this noted on the plans? 6)
Calculation page RI and R2 indicate
the existing roof joists would be over
stressed approximately 80% with
code prescribed snow loads. Due to
the change of occupancy
classification, these joists need to be
upgraded, 7) Deta1l9/S7.1, as
c
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: 02-00980-01
ISSUED: 11/06/2002
APPLIED: 08/14/2002
EXPIRES: 05/06/2003
VALUE: $ 488,005.00
"
Status:
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
referenced on sheet S3.1, elevation
line 2.6, appears to have been
omitted. Provide a copy for review.
8) Provide a copy of the
geotechnical report for review.
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
I Temporary Electric: Approval required prior to Utility Company energizing pole.
2 Footing: After trenches are excavated.
3 Foundation: After forms are erected but prior to concrete placement.
4 Framing Inspection: Prior to cover and after all rough in inspections have been approved.
5 Epoxy Anchors: To be done by Certified Spciallnspector. Provide Inspection resnlls to City Building Inspector.
6 High Strength Bolling: To be done dnring construction by a State Certified Special Inspector. Provide inspection
resulls to City Building Inspector.
7 Structural Masonry: To be done during construction by a State Certified Special Inspector. Provide resulls to
City Building Inspector.
8 Bolls Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
9 Structural Concrete: In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide
resulls to City Buiding Inspector
10 Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test
resulls to City Building Inspector.
II Underfloor Plumbing: Prior to insulation or decking.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certity that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made ofany structure without permission of the Community Services Division,
BuiWing Safety. I further certifY that only contractors and employees who are in compliance with ORS 701.005 will be
used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from
the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site
at all times du,;,-construction. _ ./ /
,/ ~~#'~
0# or Contractors Signature
I/~~ 2-
Date
5 of 5
-= t" tJlOO N
..
..., S' ~"Cl N
3 .. ....StJI
.. - ~ ''''1
() .., = 0 0 0 0 0 0 .. ;; N'; =;
C' :0; - N N N N N N " ~
.. ~ , , , , , , ~ '" -
, - I:l"
n " 0 0 0 0 0 0 w!!.
,.. " 0 0 0 0 0 0 "
.... '-0 '-0 '-0 '-0 '-0 '-0 C -.lQ.00
... 00 00 00 00 00 00 .. tJI. q
= 0 0 0 0 0 0 c
'-< , , , , , , !!. \CO'"
8 0 0 0 0 0 0 ":l., '"
" Z I:l""'-
c c
.. 8 c(IQ
= c
lr '" =
.. \C
() ... -.l
::c = ~
~ is: -.l
= -.l
'-<
I:l:I
m
Gl
() + + ~ + + I:l:I c
0 '" 00 00 '" 5, il
;;'!. ;;'!. ~ ;;'!. ;;'!. 0: n
Z n
!!.. ..
[/) [/) )> )> [/) 5' ~
-i 0; Po 0; Po 0; (JQ
~ ;; e, = 3 ;; -= ;S'
.. c
0 5' "
q [/) 3, c [/) g,
c ~ ~ <;;' ~
.. g ... g
0 n
C' ! C'
z ~ :;;' :;;' ..
" " " ~
"r1 5' "r1
" "
" (JQ "
Po "
!3 :l ~
"
;;'
" tll
Co n
= tll
'-< -.
"Cl
....
w ,., t:l ;l!=
'" C"
'-0 " ., ....
- n - N
Vo ,.,. !'!
... Z Q
dl1 c .... Q
.. 8 .... N
... as Q
0 "
..., .. '" Q
-. Q
N Q
-=
,., -= Q
" N Q
c
'" Q
3 Q
Q
Z Q
" Q
N
Q
Q
-= 5' ::: t"
.. "" "
..., " ~ S'
3 Ol " ..
.. 0 .. -
=. = n ;; t:l
.. 8
-i ;;' '"
" g, .., <
- " '"
; ~ Q
"Cl
":lS
C '"
0"=
c::-
" 00
~"'I"l
> > c :! -.
'" 8 '" 8 0" ;;'q
!'" !" " !" Co " ,",~~c
- c - c ;;'t:lt:l'"'
Ul Vo a Ul ... ... N N a
'" ~ '" !" w Vo '" 00 '-0 ..... ~ f'I) 00
;.. ... ;.. - '" <=> w <=> '0 ... e:."O~~
.. =
W w c;: w Vo 0 0 '-0 '-0 0 c;: ::0" ., S' w -
g~g~ t':' ::::
" '"
-
~ '" N
. .....ft! ftI ftI ~ 0
~ "0==- 0
",,' ............c. N
"
-S