Loading...
HomeMy WebLinkAboutPermit Miscellaneous 1988-5-9 ''',,' r CuLiLM 4JJ L _ ____ CITY OF SPRINGFIELD Planning and Development Department DATE OF LETTER May 9, 1988 DATE OF MEETING May 5, 1988 APPLICANT (p f t,J Q Larry Brabham 10-D West Q Street Springfield, OR 97477 SUBJECT CITY JOURNAL NUMBER construction of a new electrical contracting location of the property 88-05-71. Pre-Application Conference to discuss building of approximately 10,000 square feet to be used with approximately 4,000 square feet to be leased. is approximately 100 feet west of 10-D West Q Street. the for The ATTENDANCE APPLICANT: Larry Brabham. CITY STAFF: Gary Karp, Carol Denner, Dave Brown, Les Craigmile and Cynthia Pappas. ACTION No formal information approval. action prior was to taken. This meeting was held to provide the applicant with submitting a formal application for Type I Site Plan Review DISCUSSION The items discussed may not include all issues which may be reviewed as part of the actual application. 1. Assessor's Map# 17032710 Tax Lot 3600: The zoning is Light-Medium Industrial; the Metro Plan designation is Light-Medium Industrial. 2. The proposed use is permitted under Site Plan Review (SDC 20.020(3)(d)). There are no Special Use Standards to be met (the proposed rental area use must comply with permitted uses in the Light-Medium Industrial District). ~ ~ Page 2 Brabham Pre-App 3. As part of Site Plan Review the following issues will need to be addressed: a. A planted 5 foot front yard parking setback is required (SDC 20.050(1)(b). the property. In addition, two street trees are required in the front yard setback area (SDC 31.140). This standard has some flexibility. If the landscaping required interferes with parking requirements, the square footage required for landscaping may be located elsewhere on the property. b. Parking requirements for the proposed use are 1 for each 500 square feet of gross floor area (manufacture and assembly) and 1 for each 1000 square feet of gross floor area (warehousing) (SDC 20.070(2)). The interior layout of the building will be necessary to determine the parking needs for this site. The parking back-up area near Q Street needs to meet Code standards. The dimensions of the parking stalls and back-up areas need to be shown on your Site Plan submittal (45 degree parking should be used). All parking areas must be paved. Only "static" storage areas are permitted to be gravel. The term "static" refers to permanent storage, with little or no vehicular traffic. c. An attempt should be made to share access to the proposed site with the property owner to the east by using a joint use/access agreement. d. If there is no sidewalk on the Q Street frontage, one will be required. e. Any outdoor trash receptacles must be screened (SDC 31.160(1)(e)). f. A copy of the access agreement for th~ area to the west of the proposed site needs to accompany the Site Plan application. 4. The storm sewer issue (See attached Memo). 5. Building Code related issues. Fire rated walls will be required on the east and west since there are no setbacks from the property lines. Staff will need to know how the building is used to determine the R rating. The need for sprinklers will depend on the type of building construction. APPLICATION PROCEDURE A Type I Site Plan application is necessary. The cut-off date for a Site Plan review application is any Friday. An application is enclosed. If you will need any further assistance, I will be glad to help. I ..~ .. \ Page 3 Brabham Pre-App QUESTIONS Please call the Planning and Development Department at 726-3759 if you have any questions regarding this process. PREPARE1nY J " .Kar~ te Planner Copy To: DRC Members ~ ~ ) M E M 0 RAN DUM CITY OF SPRINGFIELD ENGINEERING DIVISION TO: Gary Karp, Associate Planner FROM: Les Craigmile, Chief of Construction~/~~ SUBJECT: DEVELOPMENT REVIEW COMMENTS 1. LARRY BRABHAM, BRABHAM ELECTRIC A meeting was held Friday May 6, 1988 with City Engineer Al Peroutka, Maintenance Supervisors Brian Conlon and George Dicks, Chief of Construction Les Craigmile, and Mr Larry Brabham to go over Mr. Brabham's proposed development and drainage plans. It was decided that in the best interests of the City of Springfield, Mr. Brabham would be allowed to build over a proposed 24" Storm Sewer under the following conditions. a. The design and installation of the proposed 24" Storm Sewer would meet the approval of the City Engineer. b. The proposed 24" Storm Sewer would extend south to the northern right of way of Q Street within an easement obtained by Mr. Brabham from the co- owners of the joint access road serving the Springfield News. c. The City of Springfield would extend the 24" Storm Sewer across Q Street to an out-fall along the Eugene Springfield freeway.