HILL&DALE ENGINEERING, LLC
74 EAST 18TH AVENUE, SUITE #5
EUGENE, OREGON 97401
541-868-0667
FAX 541-868-0888
03/15/05
Parker Homes
24 717 Wolf Creek Rd.
Eugene, OR 97487
RE 737 S 48th - Site/SoIls/CompactiOn Investigation - Job #131-05
I
As you requested, a site soIls mvestIgatiOn was performed at the above address on 03/14/0$
All unsuitable fills, organic and other unsUItable material has been removed to native grade. The native
soIl on thiS site is sIlty clay loam/decomposed sandstone with a Unified Classification ofNlL and a
plastiCity index of less than 20. This soil is not considered expansive (after Holtz 1959) lfhese soils are
sUItable for the placement of footmgs for the proposed wood framed structure No extraordmary drainage
IS required for thiS site. !
Crushed rock was placed to a depth in excess of 6" to approximately 30" to raise and level the buIldmg
pad to the deSired elevatIOn for the proposed foundatIOn due to over-excavatIOn of the site to remove
unSUitable clay soils A compactiOn inspection on the gravel fill was performed on 03/15/05. The
compacted surface of the 1 Yl" minus crushed rock is adequate for the proposed foundatlOn;and has a
'mimmum beanng capacity of 1500 psf The compactIOn of the gravel surface is greater than 95% ofa
standard proctor per ASTM D698.
TIllS report is limited to the Site soIls investigatIOn related to soils and fill in regard to soIl c,ondltIons at
the excavated structure site at the above address only, not slope con.ditlOns.
Thank YOll for this opportunity to be of service If you have questions regarding this report: contact me at
868-0667
Smcerely,
Pamela S. Hillstrom, P E.
r=; .---==:"')
~!~~:Ir;r' .~'- 1..v/36/D'5". I
..';" ...
HILL&DALE ENGINEERING, LLC
74 EAST 18TH AVENUE, SUITE #5
EUGENE, OREGON 97401
(541) 868-0667
FAX: (541) 868-0888
03/15/05
Parker Homes
24717 Wolf Creek Rd
Veneta, OR 97487
RE: 737 S, 48th - Dramage - Job #33-05
As you requested, an inspection review of the above site was performed on 03/14/05. The site is
in a gently sloped area and the footings wIll be placed on compacted crushed rock ai
approximately curb height Placing under floor drains at 6" into the compacted cr~shed rock will
not provide the required diversion of surface waters away from the down slope sitesiin this area,
and will not allow for fall to the street. It is recommended to place 3" diameter perf6rated
perimeter footing drain at the up slope side of the structure only, changing the drain trine to solid
past the edge of the foundation, and direct the drain to a street curb cut. The perforated drainline
is to be place at the base of the footing with the solid portion of the drainlme to be sioped at
approxImately 1 % t~ the street. Clean round rock is to be placed over the perforated drainline
portIOn Clean, well drained backfill, with no expansive soils" is to be used for the b,ack fill
around the entIre structUle, except at the dnveway.
This method of dlvertmg the water around the foundatIOn wIll provide the required surface water
dIverSIOn from the foundation, in that water wIll always take the path ofleast resistance The
water will seep through the clean loam backfill mto the trench of clean round rock t~at has been
placed over the perforated drain pIpe, mto the pipe and away from the structure's fo~dation.
Thank you for this opportunity to be of service. If you have any questions regarding :thlS report,
contact me at 868-0667. I
Sincerely,
Pamela S. HIllstrom, P E
~