On 8 June 2006, I performed a special inspection on Helical Piers being installed at
Springfield Memorial Gardens to stabilize their structure foundation, Pier #27 went in to the
depth specified and encountered a large rock, many of which were in significant evidence
around the site. Being able to go no further, but bearing on solid rock, this pier was
considered completed with adequate load bearing. The next two piers, #26 and #25 went in
smoothly until encountering a layer of shale, which they went through and then locked up,
reaching maximum torque. The inspection was terminated at this point. Attached herewith
are inspection reports for the three piers referenced in this report.
Respectfully,
Kenneth S. Pfeiffer, P.E.
Pfeiffer Engineering LLC
~J)feiffer
~'~'1~ngineering ,LJLC
~'!.-d
606 SummIt Blvd
Springfield, OR 97477
Ph (541) 747-3766
Fx (541) 747-1183
Soecial Insoection Reoort
For: Oregon Helical Piers, LLC
2734 Kalmia Street
Eugene, OR 97404-1854
Ph,: (541) 689-1414
Permit No,: COM ~--l'DCoffi
M~\ C1~InspectionDate: ta/e/o(o
. Time: F::>', 6'5 -to- '=" ~ \~
0f2,. Zip9JA. t!6 Weather: F-t 'r~N;::;r 1 COD L
Job Name: ~1(.;f4'F:lD
Address: -.150 $=) ~~
City/State: 5Pt:2X~F-tt?lJ)
This special inspection covers observation and oversight of the installation of the A.B. Chance
Helical Pier products listed below, The pier was installed at the angle and to the depth and
torque as reported below, Inspection of additional installed equipment with the pier is noted.
For reference, this report may identify the pier, by number, as shown on the engineering plans
for this project. Installation depths indicated are from grade to the deepest helix.
InsDection Summarv
Certifications
Field Supervisor: ~~ ~EI~Q.. ,/
Install. Assistant: '
Install. Assistant:
Project Pier No. /}.""L
V Helical Pier Lead Section
PierMod,No,:C.1'50-CXD. Type: S ~l ~ P>''/lDl\/t'2j1
Installed Angle(I): ~o Depth: A ft, Final Torque: ~.tl.l Ft-Lb,
Wlu.- i3E:" ~ &p Across Motor Ports: 1 DO \ Lb/in2
V . Extension Shaft(s) 1b 00 \..-'Tl\.JOesz.. ~ o~ tzod
Qnty,: PIN C150-0047 (3 ft.) Qnty,: PIN C150-0048 (10 ft,)
II Qnty,: \\ PINCI50-0008(5ft,)
Qnty,: PIN C150-0009 (7 ft.)
Foundation Bracket
Bracket Mod, No,:
Bracket Mod, No.:
C150-0121
C 150-0298
1/2" Brkt-to Fndn Bolts (2)
5/8" Brkt-to-Fndn Bolts (2)
(1) Installation angle is measured from plumb,
The engineer's stamp appearing on this report is for the information as shown and for the
number of sheets indicated (if more than one), and shall not apply to any additional documents,
unless specifically stated otherwise herewith, For questions regarding this report (and the
attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer
Engineering, LLC at (541) 747-3766, -
l])feiffer
-k 'I -1 " lDl g i lDl e e r i lDl g , JL JL C
. ~ 4
606 Summit Blvd
Sprmgfield. OR 97477
Ph (541) 747-3766
Fx (541) 747-1 183
Soecial Insoection Reoort
For:
Oregon Helical Piers, LLC
2734 Kalmia Street
Eugene, OR 97404-1854
Ph,: (541) 689-1414
Permit No,: COM ~-~5
Job Name: Spa} f\. '9 1==-1 ~LD 1v'\6~spection Date: to .LJ:3!(") (0
Address: .-.:J :::2...6'15 ~A 1 Time: .9 ;~ -20 -to- ~ vz6
City/State: ~PQ..~l9i~lta.D o1ZZipg74i1~ Weather: ~'GAF?T, C'_nr-,L
This special inspection covers observation and oversight of the installation of the A,B. Chance
Helical Pier products listed below, The pier was installed at the angle and to the depth and
torque as reported below. Inspection of additional installed equipment with the pier is noted.
For reference, this report may identify the pier, by number, as shown on the engineering plans
for this project. Installation depths indicated are from grade to the deepest helix.
Insoection Summarv
Certifications
Field Supervisor: Q.I~ W~L~ j/'
Install. Assistant:
Install. Assistant:
Project Pier No. 'l(P
v Helical Pier Lead Section
Pier Mod, No,: oP.~ b- 600, Type: 6 1-, )(. tJ31~/t d./12.."
Installed Angle : ~. (AJOtE \ \ Depth:., ft, Final Torque: ~ Ft-Lb,
( Nt7tle:. i -.. Wlu.../7E: TIL....t~P Acros~ Motor Ports: ~6'O Lb/in2
/ Extension Shaft(s) f7A61t:: TD 00 l<)~~)
Qnty,: PIN C150-0047 (3 ft,) Qnty,: PIN C150-0048 (10 ft,)
Qnty.: PIN C150-0008 (5 ft.)
Qnty,: PIN C150-0009 (7 ft,)
Foundation Bracket
Bracket Mod, No.:
Bracket Mod, No,:
C150-0121
C 150-0298
1/2" Brkt-to Fndn Bolts (2)
5/8" Brkt-to-Fndn Bolts (2)
(1) Installation angle is measured from plumb,
The engineer's stamp appearing on this report is for the information as shown and for the
number of sheets indicated (if more than one), and shall not apply to any additional documents,
unless specifically stated otherwise herewith, For questions regarding this report (and the
attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, !!!: Pfeiffer
Engineering, LLC at (541) 747-3766.
Dfeiffer
-L I~"'\ngineering ,LLC
i-J
606 Summit Blvd
Spnngfield. OR 97477
Ph (541) 747-3766
Fx (541) 747-1183
Soecial Insoection Reoort
For: Oregon Helical Piers, LLC
2734 Kalmia Street
Eugene, OR 97404-1854
Ph.: (541) 689-1414
JobName: SP"RLUGF1FJ1'> M6~~ ~
Address: ~~05 M,AL~
City/State: ~ 1}12. Zip 9Ji1.i8
Permit No,: c.otoJ\ '1cC{.o- 00 lDeD
Inspection Date: (e,,/~D~
Time: ~ f..~ -to- 9 \. 4f)
Weather: ~ rODl.
"
This special inspection covers observation and oversight of the installation of the A,B. Chance
Helical Pier products listed below, The pier was installed at the angle and to the depth and
torque as reported below, Inspection of additional installed equipment with the pier is noted.
For reference, this report may identify the pier, by number, as shown on the engineering plans
for this project. Installation depths indicated are from grade to the deepest helix,
Insocction Summarv
Certifications
Field Supervisor: C9t~ WHs:;~ V
Install. Assistant:
Install. Assistant:
Project Pier No. 26
~Helical Pier Lead Section
Pier Mod, No,: Cf50'" ~, Type: S '-l X e$'lfblVt:2. ~
Installed Anglell): ~c 1JD1E ~Depth: B ft, Final Torque: ~Ft-Lb,
("JOTE: i"; tPLE:4'2- W(.,ti.c. ee- .6.P Across Motor Ports: ~ (jf") Lb/in2
a./'Extension Shaft(s) , u-e:D i() 0 ~ ~)
Qnty,: PIN C150-0047 (3 ft.) Qnty,: PIN C150-0048 (10 ft.)
Qnty,: , PIN C150-0008 (5 ft.)
Qnty,: PIN C150-0009 (7 ft,)
Foundation Bracket
Bracket Mod, No.:
Bracket Mod, No,:
C150-0121
C 150-0298
1/2" Brlct-to Fndn Bolts (2)
5/8" Brlct-to-Fndn Bolts (2)
(1) Installation angle is measured from plumb,
The engineer's stamp appearing on this report is for the information as shown and for the
number of sheets indicated (if more than one), and shall not apply to any additional documents,
unless specifically stated otherwise herewith, For questions regarding this report (and the
attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer
Engineering, LLC at (541) 747-3766,