August 16, 2005
DMH Enterprises
780 S. 57th St.
Springfield, OR 97478
Project: 187.05
Subject. Foundation soils
Springfield building permit no. COM2005-00377
755 S. 58th S1.
PURPOSE AND SCOPE
As requested, K & A Engineering, Inc. has completed a limited evaluation of the subject project site. Our
understanding is that a new duplex will be constructed at the site. Construction will consist of a conventionally
framed structure supported by a conventional cast-in-place concrete spread footing foundation system.
The purpose of our evaluation was to detennine the nature and extent of sOil at the site, provide on-site verbal
recommendations for foundation pad construction and document our findings and recommendations in thIS
report. The scope of our services included visits to the site for visual inspection during excavation, and a
written report.
FOUNDATION PAD PREPARATION
General Site Conditions
The project site is located on the east side of the street on a west-facing slope. The slope is not severe and the
estimated gradient ranges from 20 to 25%. The slope surface was relatively uniform. There are no indications
of slope movement en the site.
The ground surface, prior to excavation, did not have a significant amount of vegetation.
Subsurface Soil Conditions
Soils at the east half of the site consisted of 1.5 to 2.0-feet of dark brown, damp, soft plastic silts over
approximately over massive, hard tan/orange sandstone. In the west half the soils consisted of 1.5 to 2.0-feet
of tan, damp, soft plastic silty fill over 0.5 to 1.0-feet of dark brown organic silty topsoil over 1.0 to 1.5-feet of
dark gray, saturated, soft, highly plastic silt over decomposed or highly weathered tan/orange sandstone.
Construction
Construction of the foundation pad consisted of excavating and removing the overlying soft silts, topsoil, and
highly plastic silt to undisturbed highly weathered tan/orange sandstone. The excavation resulted in three
benches into the hillside in the foundation area.
^ .
.
n
f)
K & A Engineering, Inc.
The upper two benches (in the east 2/3 of the foundation pad) bottomed into massive tan/orange sandstone at
depths ranging from 3 to 4-feet. After removing all loose soil and rock, the benches were covered with a thin
layer of dense-graded crushed aggregate to provide a smooth, level surface for footing construction.
The lower bench (at the west 1/3 of the foundation pad) was excavated to a depth ranging from 3 to 4-feet
since soft silty fills and soft highly plastic silts were encountered in this area. After removing all loose soil and
rock, 3 to 4-feet of 5-inch open graded crushed quarry stone were placed in the excavation (for the west bench)
and seated with the backhoe bucket. The 5-inch quarry stone was covered with 6 to 12-inches of 1 1/2-inch
and %-inch minus dense-graded crushed aggregate, in 4-inch lifts, and compacted to provide a smooth, level
surface for footing construction. We tested the crushed aggregate for dry density and have determined that the
density exceeds 95% of maximum as determined by ASTM 0698. A copy of the fIeld test resu~s are attached
to thIs report.
-
SUMMARY AND RECOMMENDATIONS
General Suitability
The foundation pad, as constructed, will provide excellent foundation support with no hazards associated with
slope movement or heaving soils.
We recommend acceptance of the foundation pad, as constructed, by the local building official.
Drainage
We recommend that a perimeter footing drain be installed along the east, north, and south sides of the
foundation. The footing drain consists of a perforated drain pipe covered with at least 12-inches of drain rock
that is enveloped in a separation geotextile.
To construct the footing drain;
1. First placing the separation geotextile at footing level on the prepared foundation pad. The geotextile
should run the length of the footing and be wide enough to wrap around the drainrock and still proVide
a 12-inch minimum overlap at the top.
2. Next place the perforated drainpipe on the geotextlle with the perforations facing down.
3. Cover the top and sides of the drainpipe with drain rock.
4. Cover the dmin iOck with the separation geotextile, overlapping the fabric on top of the iOck a
minimum of 12-inches.
The footing drain should be placed as low as possible in the excavation, preferably at the base of the granular
fill.
We recommend that a drain be installed at the west edge of the coarse quarry stone fill to collect groundwater
that may accumulate in the fill. This drain may consist of a solid drainpipe that extends into the quarry stone fill.
All footing drains and the quarry stone drain should be routed to the city storm drain system.
Project: 187.05
Client: OMH Enterprises
755 S. 58th St., Springfield, OR
Page 2 of 3
August 16, 2005
K & A Engineering, Inc.
I
SPECIFICATIONS
Foundation Drain
Perforated drainpipe should consist rigid ADS 3000 Triple Wall pipe. The perforations should be placed down.
The foundation drain should NOT be connected to the rdof drain unless the connection is made downhill of the
foundation utilizing a backflow prevention device that prbhibits roof drainage from backing up into the foundation
drain system.
Drain Rock
Drain rock should consist of clean, durable, 1 1f2-inch round rock. The rock should be placed over and to the
side of the perforated pipe so that the pipe has a mimmJm of 12-inches of cover. The drain rock should be
covered with separation geotextile
Separation Geotextile
Separation geotextile should be placed on the grade (at footmg level) prior to placement of the perforated pipe
so that after the pipe is laid and drain rock place, the gedtextile can completely wrap around the drain rock.
Separation geotextile shall consist of a polypropylene non-woven needle-punched fabric that is stabilized
against degradation from ultraviolet light exposure (sunlight). The fabric should meet the specifications for
Amoco ProPex 4535.
LIMITATIONS OF THIS REPORT
This report has been prepared for the exclusive use of DMH Enterprises and its subcontractors for the subject
proposed structure.
This geotechnical investigation, analysis, and recommendations meet the standards of care of competent
geotechnical engineers providing similar services at the time these services were provided. We do not warrant
or guarantee these recommendations, site surface, or subsurface conditions. Exploration test holes indicate
sOil conditions only at specific locations (i.e. the test hole locations) to the depths penetrated. They do not
necessarily reflect soiVrock materials or groundwater conditions that exist between or beyond exploration
locations or limits.
The scope of our services does not include construction safety precautions, techniques, sequences, or
procedures, except as specifically reGommended in this r~port. QLli services should not be interpreted as an
environmental assessment of site conditions.
Thank you for the opportunity to be of service. Please call us if you have
questions or need further assistance.
Sincerely,
~:~~
Michael Remboldt, P.E.
K & A Engineering, Inc.
EXPIRES !,L(w ~
Project: 187.05
Client: DMH Enterprises
755 S. 58th St., Springield, OR
Page 3 of 3
August 16, 2005
, ,
Density of Soil and Soil-Aggregates In-Place
ASTM 02922 and 03017
Project: 187.05
Site Address: 755 S 58th Street
Permit No: COM2005-00377
Date: 8/19/2005
Density Test Type1:/DT-4"
Operator: I CCD
Material Type:13/4" (-) Springfield Quarry
Maximum Dry Denstiy, pcfl 141.0
Standardization and Reference Check A Density
(Standard Deviations) (S.D.) 0.3
A Moisture,
(S.D:)
0.19
Moist - - 01)'
Density, Density, Water Compaction,
Test No. pet per Content, % % Remarks
1 156.7 145.7 7.5 103.3%
2 150.1 141.6/ 6.0 100.4%
3 144.71 135.9' 6.51 96.4%1
4 147.51 139.1 6.1 98.7%
I
I
I
j
I
I
j
I
j
I
I
I
I
I
I
Average: 99.7%
Std. Dev.: 2.93%
1 DIrect Transmission (DT) (specify deprh, in.) or Air Gap Backscatter (AGB) (specifiy(1)ouchable or (U)ntouchable
mode
Test performed using Seaman Nuclear Corp model C-300, SN 21113
Client DMH Enterprises
Project 187.05
K & A Engineering, Inc.
8/19/2005