K & A Engineering, Inc.
P.o. Box 23624, Eugene, OR 97402
521 Market St., Suite B, Eugene, OR 97402
(541) 684-9399 Voice
(541) 684-9358 FAX
engineering
September 6, 2005
Scott Jordan
3520 Celeste Way
Eugene, OR 9740B
Project: 118.05
Subject: Beam 102 end supports
,Springfield permit no. COM2005-00619
" '(2Wo. 27U1 Gt , Springfleld;-fJR 7
As requested, K & A Engineering, Inc. has evaluated the existing end supports, as constructed for beam B102.
The supports consist of 3 - 2x6 DF/L no. 2 studs, nail-laminated, under each end of the 5 1/B-Inch glue
laminated beam. The support studs are notched to accept the beam end, providing 3-lnches x 4 5-Inches
bearing area
Based on our calculations, the design bearing pressure at the beam, at each end, greater than allowable.
We recommend modlfvlna the existina SUDDort bv the addition of one more 2x6. so that the total beanna area at
each beam end exceeds 15.3B-sauare inches. According to our calculations, adding one more 2x6 Will
increase the allowable end bearing above the actual design load
Thank you for the opportunity to be of service Please call us if you have any questions
Sincerely,
Michael Remboldt, P E.
K & A Englneenng, Inc