SDecial InsDection Reoort
For: Oregon Helical Piers, LLC
2734 Kalmia Street
Eugene, OR 97404-1854
Ph.: (541) 689-1414
Permit No.: _ C. oS- (') i -, Z ~
Job Name: PF=~I rrel2... ~~ f)~(('J;:.. Inspection Date: ~'29;,/(")t;?"
Address: If;,D( n So MUl r T 1?, l Vf\. Time: it ',"Zt7 -to- L 1 ~'A.()
City/State: ~r2t^ lC;F.r~ [) Oelip ~74:...L( Weather: Cl15( JOi I coc) l
This special inspection covers observation and oversight of the installation of the A.B. Chance
Helical Pier products listed below. The pier was installed at the angle and to the depth and
torque as reported below. Inspection of additional installed equipment with the pier is noted.
For ref~l~uce, this report may identify the pier, by number, as shown on the engineering plans
for this project. Installation depths indicated are from grade to the deepest helix.
Project Pier No. :3
Field Supervisor:
Install. Assistant:
Install. Assistant:
Certifications
.JOSU F(J(ZJ) V
Insoecnon Summary
/ Helical Pier Lead Section
Pier Mod. No.: ,:=')eEC1AL
Installed Angle(l): . 40
Type: ..s~c:; ~t LG X C';/ ip
Depth: '2 YZ-ft. Final Torque: .seuJ..Ft-Lb.
L1P Across Motor Ports: .....vb... Lb/in2
,
/' Extension Shaft(s)
Qnty.: PIN C150-0047 (3 ft.)
Qnty.: l' PIN C150-0008 (5 ft.)
Qnty.: PIN C150-0009 (7 ft.)
Qnty.:
PIN C150-0048 (10 ft.)
V Foundation Bracket
Bracket Mod. No.: ,,/' C150-0121
Bracket Mod. No.: C150-0298
112" Brkt-to Fndn Bolts (2)
5/8" Brkt-to-Fndn Bolts (2) V
(1) Installation angle is measured from plumb.
The engineer's stamp appearing on this report is for the information as shown and for the
number of sheets indicated (if more than one), and shall not apply to any additional documents,
unless specifically stated otherwise herewith. For questions regarding this report (and the
attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer
Engineering, LLC at (541) 747-3766.
~
:JJfeiffer
l..~-4 ~ lrll g i lrll e e r i lrll g , L L C
.L..J
606 Summit Blvd
Sprmgfield. OR 97477
Ph (541) 747-3766
Fx (541)747-1183
Soecial Insoection Report
For: Oregon Helical Piers, LLC
2734 Kalmia Street
Eugene, OR 97404-1854
Ph.: (541) 689-1414
PennitNo.: C. OS-01..2P,.
Job Name: PFF=:lFl=-82. kE:St f)~('F: Inspection Date:i2/2.P1/r:&-
Address: lc:61..o 9) vU./\ I 1"' g LVD. Time: 1.1. : 0 ~ -to- -\. {', \ D ,
City/State: SPRf~ Pin Ql2.Zip q,4- '(7 Weather: CI r'i 'JO'i I ('.00 L
This special inspection covers observation and oversight of the installation of the A.B. Chance
Helical Pier products listed below. The pier was installed at the angle and to the depth and
torque as reported below. Inspection of additional installed equipment with the pier is noted.
For reference, this report may identify the pier, by number, as shown on the engineering plans
for this project. Installation depths indicated are from grade to the deepest helix.
Insoection Summarv
Project Pier No. 1-
Field Supervisor: ~ -R')CZO
Install. Assistant:
Install. Assistant:
Certifications
/
/ Helical Pier Lead Section
Pier Mod. No.: ~~'1A. L
Installed Angle{l): .4"
Type:
Depth:
I'
5 'F=T K Ir>
4- Jt. Final Torque: r:=:;c:::.cc Ft-Lb.
D.P Across Motor Ports: 2.ld"D Lb/in2
Extension Shaft(s)
Qnty.: PIN CI50-0047 (3 ft.)
Qnty.: PIN C150-0008 (5 ft.)
Qnty.: PIN C150-0009 (7 ft.)
Qnty.:
PIN C150-0048 (10 ft.)
,,/ Foundation Bracket
Bracket Mod. No.: ,,/ C150-0121
Bracket Mod. No.: C150-0298
1/2" Brkt-to Fndn Bolts (2)
5/8" Brkt-to-Fndn Bolts (2) v
(1) Installation angle is measured from plumb.
The engineer's stamp appearing on this repo~ is for the information as shown and for the
number of sheets indicated (if more than one), and shall not apply to any additional documents,
unless specifically stated otherwise herewith. For questions regarding this report (and the
attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer