Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2005-12-28 .' :JVfeiffer ..i-Engineering ,LLC 606 Summit Blvd Sprmgfield. OR 97477 Ph (541) 747-3766 Fx (541) 747-1183 SDecial InsDection Reoort For: Oregon Helical Piers, LLC 2734 Kalmia Street Eugene, OR 97404-1854 Ph.: (541) 689-1414 Permit No.: _ C. oS- (') i -, Z ~ Job Name: PF=~I rrel2... ~~ f)~(('J;:.. Inspection Date: ~'29;,/(")t;?" Address: If;,D( n So MUl r T 1?, l Vf\. Time: it ',"Zt7 -to- L 1 ~'A.() City/State: ~r2t^ lC;F.r~ [) Oelip ~74:...L( Weather: Cl15( JOi I coc) l This special inspection covers observation and oversight of the installation of the A.B. Chance Helical Pier products listed below. The pier was installed at the angle and to the depth and torque as reported below. Inspection of additional installed equipment with the pier is noted. For ref~l~uce, this report may identify the pier, by number, as shown on the engineering plans for this project. Installation depths indicated are from grade to the deepest helix. Project Pier No. :3 Field Supervisor: Install. Assistant: Install. Assistant: Certifications .JOSU F(J(ZJ) V Insoecnon Summary / Helical Pier Lead Section Pier Mod. No.: ,:=')eEC1AL Installed Angle(l): . 40 Type: ..s~c:; ~t LG X C';/ ip Depth: '2 YZ-ft. Final Torque: .seuJ..Ft-Lb. L1P Across Motor Ports: .....vb... Lb/in2 , /' Extension Shaft(s) Qnty.: PIN C150-0047 (3 ft.) Qnty.: l' PIN C150-0008 (5 ft.) Qnty.: PIN C150-0009 (7 ft.) Qnty.: PIN C150-0048 (10 ft.) V Foundation Bracket Bracket Mod. No.: ,,/' C150-0121 Bracket Mod. No.: C150-0298 112" Brkt-to Fndn Bolts (2) 5/8" Brkt-to-Fndn Bolts (2) V (1) Installation angle is measured from plumb. The engineer's stamp appearing on this report is for the information as shown and for the number of sheets indicated (if more than one), and shall not apply to any additional documents, unless specifically stated otherwise herewith. For questions regarding this report (and the attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer Engineering, LLC at (541) 747-3766. ~ :JJfeiffer l..~-4 ~ lrll g i lrll e e r i lrll g , L L C .L..J 606 Summit Blvd Sprmgfield. OR 97477 Ph (541) 747-3766 Fx (541)747-1183 Soecial Insoection Report For: Oregon Helical Piers, LLC 2734 Kalmia Street Eugene, OR 97404-1854 Ph.: (541) 689-1414 PennitNo.: C. OS-01..2P,. Job Name: PFF=:lFl=-82. kE:St f)~('F: Inspection Date:i2/2.P1/r:&- Address: lc:61..o 9) vU./\ I 1"' g LVD. Time: 1.1. : 0 ~ -to- -\. {', \ D , City/State: SPRf~ Pin Ql2.Zip q,4- '(7 Weather: CI r'i 'JO'i I ('.00 L This special inspection covers observation and oversight of the installation of the A.B. Chance Helical Pier products listed below. The pier was installed at the angle and to the depth and torque as reported below. Inspection of additional installed equipment with the pier is noted. For reference, this report may identify the pier, by number, as shown on the engineering plans for this project. Installation depths indicated are from grade to the deepest helix. Insoection Summarv Project Pier No. 1- Field Supervisor: ~ -R')CZO Install. Assistant: Install. Assistant: Certifications / / Helical Pier Lead Section Pier Mod. No.: ~~'1A. L Installed Angle{l): .4" Type: Depth: I' 5 'F=T K Ir> 4- Jt. Final Torque: r:=:;c:::.cc Ft-Lb. D.P Across Motor Ports: 2.ld"D Lb/in2 Extension Shaft(s) Qnty.: PIN CI50-0047 (3 ft.) Qnty.: PIN C150-0008 (5 ft.) Qnty.: PIN C150-0009 (7 ft.) Qnty.: PIN C150-0048 (10 ft.) ,,/ Foundation Bracket Bracket Mod. No.: ,,/ C150-0121 Bracket Mod. No.: C150-0298 1/2" Brkt-to Fndn Bolts (2) 5/8" Brkt-to-Fndn Bolts (2) v (1) Installation angle is measured from plumb. The engineer's stamp appearing on this repo~ is for the information as shown and for the number of sheets indicated (if more than one), and shall not apply to any additional documents, unless specifically stated otherwise herewith. For questions regarding this report (and the attached sheets), please contact Oregon Helical Piers, LLC at (541) 680-1414, or Pfeiffer Engineering, LLC at (541) 747-3766. -