K & A Engineering, Inc.
P.O. Box 23624, Eugene, OR 97402
521 Market St., Suite I, Eugene, OR 97402
(541) 684.9399 Voice
(541) .&84-9358 FAX
January 25, 200&
Ralph and Paula Peterson
6880 Glacier Or.
Spnngfield, OR 97478
Project: 49.05
'Subject: Inspection certification - Foundation underpinning
City Of Springfield permit no. COM2005-01654
6880 Glacier Dr., Springfield, OR
PURPOSE AND SCOPE
As requested, K & A Engineering, Inc. has provided on-site inspection of foundation underpinning of the
foundation of your home at the subject site address. This work was permitted by the City of Spnngfield and
was completed by Van Dam Construction, Inc.
Our services included on-site inspection of the piers during Installation, inspection of the leveling of the
foundation after piers were installed, and this summary report.
PIER INSTALLATION
Underpinning Design
Underpinning for this project was deSIgned by K & A Engineering, Inc. and consisted of placement of steel
helical piers to support the existing concrete foundation. The design was specifIed in a repair plan that was
part of our geotechnical foundation investigation report to you dated April 22, 2005. Our recommendations
InCluded specific locations, pier type, and minimum ultimate pier capactties to be achieved.
Pier Installation
The helical piers were installed at the locations with two exceptions. See the attached As-built Pier Plan. An
additional pier was required (pier no. 5) due to the presence of a large rock at the originally specified location.
Also, and additional pier was needed near the water heater, pier no. 17, due to an error in our original foundation
plan's dimensions.
Piers 1-5 and 10-35 consisted of 2.875-mch diameter schedule 80 high-strength steel pipe with a 10.inch, 12-
inch, and 14-inch helical plate welded to the bottom lead, separated by approximatelv 2-feet Piers 6-9
consisted of a 2.875-inch diameter schedule 80 high-strength steel pIpe with a 1 Q-inch and 12-inch helical
plate welded to the bottom lead.
. Jan. 25. 2006 9:57AM
No.0149 P.3/4
K a A Englnesring, Inc.
Piers were driven into the ground using a hydraulic drive system to screw the piers into the soil. Pressure
readings of the hydraulic drive pressure, correlated to drive torque, were taken for each pier installed. Table 12
shows the maximum pressure and torque readings at the final installed depth for each pier.
Table 1 . Pier Installation Summary
Drive Calc. Required
Pressure, Torque, ft- U1t. UIl
Pier Depth, ". psi Ib Capacity, k Capa(;ity, k
1 10.5 1800 6121 61 44
2 8 1300 4421 44 44
3 10.5 1800 6121 61 44
4 10 2000 6801 68 44
5 9 1800 6121 61 44
6 8 1500 5101 51 44
7 9 1800 6121 61 44
8 10 1500 5101 51 44
9 7 1100 3741 37 44
10 9 1800 6121 61 44
11 9 1800 6121 61 44
12 10 1800 6121 61 44
13 10 1900 6461 65 44
14 10 1700 5781 58 44
15 9 1800 6121 61 44
16 10.5 1750 5951 60 44
17 10 2000 6801 68 44
18 10 1800 6121 61 44
19 13 1700 5781 58 44
20 19 2100 7141 71 70
21 16.5 2100 7141 71 70
22 12.5 2100 7141 71 70
23 12 2100 7141 71 70
24 11 2100 7141 71 70
25 11 2300 7821 78 70
26 10.5 2100 7141 71 44
27 11 2300 7821 78 44
28 11 2100 7141 71 44
29 11.5 2100 7141 71 44
30 12 2100 7141 71 44
31 16.5 2300 7621 78 70
32 18 2300 7821 78 44
33 18 2100 7141 71 44
34 16 2200 7481 75 44
35 16 2100 7141 71 44
Project: 49.05
Chent: Peterson
6880 Glacier Dr., Springfield, OR
Page 2 of 3
January 25, 2006
. Jan. 25. 2006 9: 57AM
No. 0\49 P. 4/4
K It A Engineering, Inc.
After pier installation, Fasteel' Ultra pier brackets2 were Installed over the exposed pier shaft into recessed slots
cut into the footing, so that the pier bracket shelf solidly supported the stem wall The brackets were attached to
the foundation using two 5/8.inch expansive anchors.
\
Note that the bracket for pier 31 was a specially fabricated bracket designed to attached to the side of the stem
wall using *-inch steel plate and attached to the wall using 6 - %-inch diameter grade 75 all-thread bars affixed
to the wall using high-strength epoxy.
After installatIon of the brackets, hydraulic jacks were used to lift the foundation on the piers. A level was used
to determine floor level, and a torque wrench was used on the jacks to ensure even distribution of foundation
loading to the supporting piers.
After pier installation and foundation leveling, the areas surrounding the piers were backfilled and graded.
SUMMARY AND RECOMMENDATIONS
Based on our field observations and measurements, the piers, as installed, meet our design specifications for
capacity. We believe that the underpinning system, as installed, is adequate to support the design live and dead
loads for the foundation.
We recommend acceptance Of the foundation underpinning system, as-built, by the local building official.
Thank you for the opportunity to be of service. Please call me if you have any Questions.
Sincerely,
Michael Remboldt, P.E.
K & A Engineering, Inc.
cc: Van Dam Construction, Inc.
1 The pier and bracket manufacturer and supplier of1he hydraulic drive eqUipment is Fasteel Systems, 463 Kirkwood Rd.,
#58, St Louis, MO 63122 www.fasteel.com
2lhese brackets have a rated ultimate capacity of 120 kips.
Project 49.05
Client: Peterson
6880 Glacier Dr., SpringfIeld, OR
Page 3 of 3
January 25, 2006
. Jan, 25. 2006 9: S8AM
"
-f
k geo!echn.icaVcivil
"- ...:J engineering
U Eugene, OR 97408
l en gin e er i n g 541 684 9399 541 6849358 fax
No. 0150 P. 1/1
Ji9.
Projed: 6880 Glacier Dr. ,
Client. Peterson - COM200S-01654
Job No: 49.05 Date:. 1/24/2006
Sheet: 1 of 1
,;
'"
'\
EXISTING FOUNDATION AND
STEMWAlL (TYP.)
- HELICAL PIER AND BRACKET
TYPICAL
r~----~----W-,
: ';-----------, ~~- --~---~-~
I I L_______-, r----l ~
I I I I I I
~I II II
;tfl II 1,k1
II II I~
I L_________~ I I I I
I r^---ft"--~-~~' I I J ~I
)}, LU ~ L!,). ~'--------J L____J
. I ~ ,
, I I gg-g---&--g~ :
I I I I
, I ,L- W WI , : ~
}} r-----"~ , ~ I I
I I I Rf--W--~lr-..., "I I I
I I L__..,' r----.-:J I ~ I I
I I I I I - . I I
~ I I """ I 11 --'lY-_J ~
- I I ~ L________J
I I I I
I I I I
I I I I
I I I I
I I I I
I L________---1 I
L__________~
CD AS-BUilT PIER P~A~_.
1 - 3/32" = 1'.0"
~'
"