Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1999-9-16 ~ -" OAGRA September 16, 1999 9-61 M-1 0300-J AGRA Earth & Environmental, Inc 7477 SW Tech Center Dnve Portland Oregon USA 97223 8025 Tel (503) 639-3400 Fax (503) 620-7892 ENGINE'RING GLOBAL SOLUTIONS RE I , I I 'i I I , , i 450 - 110th Ave N E Room 209 Bellevue, WA 98004 : I FINAL INSPECTION REPORT CELL TOWER EUG-173 333 N 58TH STREET ,I SPRINGFIELD, ORE~ON PERMIT NO 99-0441 Mr Jack Dittmer US West Wireless Dear Mr Dittmer This IS to certify that In accordance with Section 1701 of the State BUilding Code, AGRA Earth & , EnVironmental, Inc (AGRA) performed the following special Inspections for the above referenced I p~ect I · Concrete Properties All indicated inspections were performed and reported throughout the course of the project Based on our inspections and laboratory results, to the best of our knowledge, the structural aspects of the observed work have been constructed In substantial conformance with the approved deSign draWings, specifications, shop draWings, approved changes and applicable workmanship provIsions of the: State BUilding Code and Standards I I Sincerely, I I AGRA Earth and EnVironmental, Inc , /?/~i~ Rolando Ramos Technical Director DBUjlm I Attachment Completed Dlstl)butlon List I I I I I I b K.11 000011 030011 0300ICellTower173 wpd @ ""i COMPLETED DISTRIBUTION LIST US West Wireless Cell Site EUG-173 9-61 M-1 0300-J PrOject Address I 333 N 58th Street Springfield, Oregon I 'I City of Springfield 225 Fifth Street Springfield, OR 97477 'I ~ablb JlrJI AzourI Rohn Industries 6718 W Plank Rd ~eorla, IL 61604 } ChriS Allhands Cord Communications I 25977 SW Canyon Creek Rd , SUite E V,vllsonvtlle, OR 97070 I I , BUilding OffiCial Architect Contractor I I I ;1 '! I ! , l i i I J I : I , @ @ AGRA ENGINEERING GLOBAL SOLUTIONS ~ OAGRA f , , , Report of Compression T~st Results I I ,1 Client U S West Wireless, L L C 450 110lh Avenue NE Room 209 Bellevue, WA 98004 Report Date Project # Project Name AGRA Earth & Environmental, Inc 7477 SW Tech Center Drive Portland Oregon USA 97223-8025 Tel (503) 639-3400 Fax (503) 620 7892 September 16, 1999 9-61 M-l03oo-J Cell Site EUG 173 ENGINEERING GLOBAL SOLUTIONS Aftn Mr Jack Dittmer Specimen Type CONCRETE I j i 'I I I ASTM-C39 PrOject Mgr Krey Younger Architect Engmeer PO Number Placement : I I j Cell Tower Foundation - EUG 173 I il Required 3000 pSI @ 28 l I Contractor OMI Mix and Field Data Cast Date 7/9/1999 Strength (rc) Days Inspector Phil Lundberg MIX 10 50 Supplier Load # Truck # Ticket # Plant # Batch Size Water Admixture Morse Brcs Actual Slump (Inches) ASTM C-143 400 Air Content (%) ASTM C-231 Unit Weight (pct) ASTM C-138 Concrete Temp (OF) 72 1 2173 518448 75 Yds 4Gal Batch Time Sample Time Finish Time 600 700 710 r I I ~ I 'I Ambient Temp (OF) 54 Weather Clear, mild Time Test Result I Actual I Area Spec ,Age Nominal CompressIVe Strength Brk Type! % of 10# 10 Date Rec d Test Date (days) Specimen Size (sqln) (lbs) (psI) Cure Req d 5341 A 7/10/1999 7/12/1999 r 3 6x12 2847 92,980 3,270, 109% B 7/10/1999 7/16/1999 r 7 6x12 2847 108,810 3,820 127% , I C 7/10/1999 8/6/1999 I 28 6x12 2847 136,600 4,800 160% J " 0 7/1 0/1999 8/6/1999 I 28 6x12 2847 134,440 4,720 157% E 7/10/1999 9/3/1999 56 6x12 2847 144,415 5,070 ' 169% ! Break Types -- (Cn) Cone, (CSp) Cone _Split, (~Sh) Cone Shear, (Sh) Shear, (Co) Columnar i ReViewed By DlstnbutlOn Client Yes File Yes Producer Yes Others @