Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-11-20 (2) l- "~;l Infonnation ~..,. .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed November 20, 2007 Report Number 722-70227 -26 Client S R Yett Project Name Wllco- Olympic Spring The Olympic, LLC PO Box 26125 Project Location, 1401 21st St, Springfield, Oregon Eugene, OR 97402 PO No Permit No. COM 2007-00-834 Type of Structure Weather' Cloudy Type of Inspection' Epoxy Field Observations and Comments 'Performed continuous inspection dUring the Installation of 5/8" all thread epoxy anchored bolts In the following locations one (1) 5/8" diameter all thread (12" long) for pressure treated ledger (north bolt) for customer pick up drive through Prior to Installation the predrllled holes were cleaned uSing a nylon brush and compressed air Verified minimum embedment depth of 5 Inches The above listed epoxy anchors were Installed uSing Simpson Set Pac EZ epoxy with ICC # ES-EHR-1772 Contractor stated the nuts would be tightened after the epoxy has cured The epoxy anchors were Installed In accordance with manufacturer's directions To the best of our knowledge, the work Inspected above was In accordance with the bUilding department approved deSign draWings, specifications and applicable workmanship provISions of the International BUilding Code Inspector Raymond Allpertl CCB #176269 If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649 Respectfully Submitted, Profess/ona ServIce Industnes, Inc. ~i~\ '~I'fxJ Joseph Vardner, EIT Branch Manager c Robert Castile ILO Constructlon- 1102@comcast net EriC Hall Architects Erik Kunbel THIS R5PORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THiRD PT-MtlS'siChar'8'ew.e~.'InI:ll'J8tn1:fs'NfiI;IU 1~4U!~l8"hIDle~tre~~~1l1!1W, OO'grm~Ij3Hdh&~I(W&~9W.wfiIF~xi!3.fmJfIf-'f~