DAILY FIELD REPORT
Date Performed November 20, 2007 Report Number 722-70227 -26
Client S R Yett Project Name Wllco- Olympic Spring
The Olympic, LLC
PO Box 26125 Project Location, 1401 21st St, Springfield, Oregon
Eugene, OR 97402
PO No Permit No. COM 2007-00-834
Type of Structure Weather' Cloudy
Type of Inspection' Epoxy
Field Observations and Comments
'Performed continuous inspection dUring the Installation of 5/8" all thread epoxy anchored bolts In the following locations
one (1) 5/8" diameter all thread (12" long) for pressure treated ledger (north bolt) for customer pick up drive through
Prior to Installation the predrllled holes were cleaned uSing a nylon brush and compressed air Verified minimum
embedment depth of 5 Inches The above listed epoxy anchors were Installed uSing Simpson Set Pac EZ epoxy with
ICC # ES-EHR-1772 Contractor stated the nuts would be tightened after the epoxy has cured The epoxy anchors
were Installed In accordance with manufacturer's directions To the best of our knowledge, the work Inspected above
was In accordance with the bUilding department approved deSign draWings, specifications and applicable workmanship
provISions of the International BUilding Code
Inspector Raymond Allpertl
CCB #176269
If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
Profess/ona ServIce Industnes, Inc.
~i~\ '~I'fxJ
Joseph Vardner, EIT
Branch Manager
c
Robert Castile
ILO Constructlon- 1102@comcast net
EriC Hall Architects
Erik Kunbel