DAILY FIELD REPORT
Date Performed: November 26, 2007 Report Number: 722-70227 -28
Chent: S R Yett Project Name: Wilco- Olympic Spring
The Olympic, LLC
PO Box 26125 Project Location, 1401 21 st St, Spnngfleld, Oregon
Eugene, OR 97402
P,O. No.' Permit No COM 2007-00-834
Type of Structure' Weather: Fog
Type of Inspection: Epoxy .
Field Observations and Comments
Performed continuous inspection dunng the Installation of #4 epoxied rebar dowels In the follOWing locations #4's at 16"
centers at 12' 8" elevation line A from 5 8 to 6 2 Pnor to Installation the prednlled holes were cleaned uSing a nylon
brush and compressed air Venfled minimum embedment depth of 6 Inches The above listed epoxy anchors were
Installed uSing HY 150 To the best of our knowledge, the work Inspected above was In accordance With the bUilding
department approved deSign draWings, specifications and applicable workmanship provIsions of the International
BUlldlnq Code Contractor was asked to notify our offIce when addlbonal services are needed
Inspector: David Smith
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
Respectfully Submitted,
P4Ja;~~;;tries, Inc.
Joseph Vardner~-
Branch Manager
c:
Robert Castile
ILO Constructlon- 1102@comcast net
Enc Hall Architects
Enk Kunbel
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industries, Inc. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163