Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-11-26 (2) l'" "~;l Information ~.,. .To Build On Engineering. Consulting · Testing DAILY FIELD REPORT Date Performed: November 26, 2007 Report Number: 722-70227 -28 Chent: S R Yett Project Name: Wilco- Olympic Spring The Olympic, LLC PO Box 26125 Project Location, 1401 21 st St, Spnngfleld, Oregon Eugene, OR 97402 P,O. No.' Permit No COM 2007-00-834 Type of Structure' Weather: Fog Type of Inspection: Epoxy . Field Observations and Comments Performed continuous inspection dunng the Installation of #4 epoxied rebar dowels In the follOWing locations #4's at 16" centers at 12' 8" elevation line A from 5 8 to 6 2 Pnor to Installation the prednlled holes were cleaned uSing a nylon brush and compressed air Venfled minimum embedment depth of 6 Inches The above listed epoxy anchors were Installed uSing HY 150 To the best of our knowledge, the work Inspected above was In accordance With the bUilding department approved deSign draWings, specifications and applicable workmanship provIsions of the International BUlldlnq Code Contractor was asked to notify our offIce when addlbonal services are needed Inspector: David Smith CCB #176269 If you have any questions regarding this report, please feel free to contact us at 541-746-9649 Respectfully Submitted, P4Ja;~~;;tries, Inc. Joseph Vardner~- Branch Manager c: Robert Castile ILO Constructlon- 1102@comcast net Enc Hall Architects Enk Kunbel THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED ProfeSSional Service Industries, Inc. 1040-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163