Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-11-28 November 28, 2007 722-70227.29 Wllco- Olympic Spring Project Location 1401 21st St Spllngfleld, OR PO No COM 2007-00-834 DAILY MASONRY FIELD REPORT SPECIFIC PLACEMENT LOCATION (5) / MATERIAL INFORMATION l- ... ~ ., Infonnation ~..,. .To Build On Engineering · Consulting. Testing Client S R Yett The Olympic, LLC PO 8m. 26.1 25 Date Performed Report No Project Name Grout Mortar Pnsms Eugene OR 97402 Weather Fog CMU In, fill line A from 56 to 6 2, 12' 8" to top out SUPPLIER MIX NUMBER SLUMP AIR CONTENT AMBIENT TEMPERATURE MATERIAL TEMPERATURE TIME PLACED NUMBER OF SAMPLES DESIGN STRENGTH (PSI) PLACED Knife RIVer 246HG3KOOO 81/2" 400 1 00 PM 2,000 25 Performed visual Inspection of reinforcing steel and anchor bolts In the locations listed above ReinforCing steel was checked for grade, lap, placement and clearances where applicable Reinforcing steel was secured uSing mJ size o m'J Iml ~ Illl'! o Ifi! II o o o o I!lil Reinforcing steel was placed In accordance With approved deSign draWings, specifications, reVised detail 1 0/S2 2 and detail SK-1 All cells were relatively clean and mortar projections are Within the limits of the International BUilding Code Performed continuous Inspection dUring placement of grout In the locations listed above As directed by , continuous Inspection dUring placement of grout was not reqUIred Grout was placed by pump and mechanically consolidated All cells were grouted solid 0 Only cells containing reinforCing steel were grouted solid Empty cells were 0 Filled With insulation 0 Covered With grout paper Cast set (s) of (_ x _) grout test cylinders set (s) of set (s) of solid test prisms o (_ x _) mortar test cylinders hollow test prisms Cast e Contractor was asked to notify our office when additional services are needed ml To the best of our knowledge, the work Inspected above was In accordance With the bUilding department approved deSign draWings, speCifications and applicable workmanship prOVISions of the International Building Code o Cast o Re-Inspectlon ReqUired Additional Comments L T strap anchors will be epOXied at a later date o Non.Compllance Inspector DaVid Smith Respectfully Submitted, ProfeSSIOnal Service Industries, Inc CCB #176269 ReViewed By ~/ ~ ~~~ Branch Manage~ o ReqUires Engineers Acceptance (RFI) leBO # 0877340,84 I Distribution List Robert Castile ILO Constructlon- Ilo2@comcast net Enc Hall Architects - annette@enchallarchltect com Enk Kunbel r THIS REPORT 15 PROVIDED FOR THE "'FORMA TlON OF TriE CLIENT ONL ( THE REPRODUCTION OF THIS PEPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS E>-CEPT IN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES ProfeSSional Service Industnes, Inc o1040-A Shelley Street 0 Springfield, OR 97477 0 Phone 541/746-9649 0 Fax 541/746-7163