HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-11-28
November 28, 2007
722-70227.29
Wllco- Olympic Spring
Project Location 1401 21st St
Spllngfleld, OR
PO No COM 2007-00-834
DAILY MASONRY FIELD REPORT
SPECIFIC PLACEMENT LOCATION (5) / MATERIAL INFORMATION
l- ... ~ ., Infonnation
~..,. .To Build On
Engineering · Consulting. Testing
Client
S R Yett
The Olympic, LLC
PO 8m. 26.1 25
Date Performed
Report No
Project Name
Grout
Mortar
Pnsms
Eugene OR 97402
Weather Fog
CMU In, fill line A from 56 to 6 2, 12' 8" to top out
SUPPLIER
MIX NUMBER
SLUMP
AIR CONTENT
AMBIENT TEMPERATURE
MATERIAL TEMPERATURE
TIME PLACED
NUMBER OF SAMPLES
DESIGN STRENGTH (PSI)
PLACED
Knife RIVer
246HG3KOOO
81/2"
400
1 00 PM
2,000
25
Performed visual Inspection of reinforcing steel and anchor bolts In the locations listed above ReinforCing steel was checked for grade,
lap, placement and clearances where applicable
Reinforcing steel was secured uSing
mJ
size
o
m'J
Iml
~
Illl'!
o
Ifi!
II
o
o
o
o
I!lil
Reinforcing steel was placed In accordance With
approved deSign draWings, specifications, reVised detail 1 0/S2 2 and detail SK-1
All cells were relatively clean and mortar projections are Within the limits of the International BUilding Code
Performed continuous Inspection dUring placement of grout In the locations listed above
As directed by , continuous Inspection dUring placement of grout was not reqUIred
Grout was placed by pump and mechanically consolidated
All cells were grouted solid 0 Only cells containing reinforCing steel were grouted solid
Empty cells were 0 Filled With insulation 0 Covered With grout paper
Cast set (s) of (_ x _) grout test cylinders
set (s) of
set (s) of
solid test prisms
o
(_ x _) mortar test cylinders
hollow test prisms
Cast
e Contractor was asked to notify our office when additional services are needed
ml To the best of our knowledge, the work Inspected above was In accordance With the bUilding department approved deSign draWings,
speCifications and applicable workmanship prOVISions of the International Building Code
o
Cast
o
Re-Inspectlon ReqUired
Additional Comments L T strap anchors will be epOXied at a later date
o Non.Compllance
Inspector DaVid Smith
Respectfully Submitted,
ProfeSSIOnal Service Industries, Inc CCB #176269
ReViewed By ~/ ~
~~~ Branch Manage~
o ReqUires Engineers Acceptance (RFI)
leBO # 0877340,84 I Distribution List
Robert Castile
ILO Constructlon- Ilo2@comcast net
Enc Hall Architects - annette@enchallarchltect com
Enk Kunbel
r
THIS REPORT 15 PROVIDED FOR THE "'FORMA TlON OF TriE CLIENT ONL ( THE REPRODUCTION OF THIS PEPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS
E>-CEPT IN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
ProfeSSional Service Industnes, Inc o1040-A Shelley Street 0 Springfield, OR 97477 0 Phone 541/746-9649 0 Fax 541/746-7163