HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-11-26 November 26,2007 722.70227 -27 Wllco- Olympic Spnng 1401 21st St Springfield, OR PO No COM 2007-00-834 DAILY MASONRY FIELD REPORT MATERIAL INFORMATION SUPPLIER MIX NUMBER SLUMP AIR CONTENT AMBIENT TEMPERATURE MATERIAL TEMPERATURE TIME PLACED NUMBER OF SAMPLES DESIGN STRENGTH (PSI) PLACED Iiii Perrormed visual inspection of reinforCing steel In the locations listed above placement and clearances where applicable D ReinfOrcing steel was secured uSing l-~;lInfonnati.on ~~. .To Build On Engineering. Consulting ~ Testing Client S R Yett The Olympic, LLC PO Box 26125 Eugene, OR 97402 Weather Fog SPECIFIC PLACEMENT LOCATION (S) CMU line A from 5 6 \0 5 8 7' 4" to 12' 8" and line A from 58 to 6 2, 12' to 12' 8" above slab on grade Date Performed Report No Project Name Project Location Grout Knife River 246HG3KOOO 8" Mortar Prisms 42' 56' 1 00 PM 2,000 1 ReinfOrcing steel was checked for grade, Size, lap, iii! ReinforCing steel was placed In accordance With J:lil approved design drawings, speCifications and submitted from Hohback.Lewln dated September 18, 2007 detail SK-1 EI All cells were relatively clean and mortar projections are Within the limits of the International BUilding Code &!II Performed continuous Inspection dunng placement of grout In the locations listed above D As directed by , continuous inspection dUring placement of grout was not required II Grout was placed by pump and mechanically consolidated 121 All cells were grouted solid 0 Only cells containing reinfOrcing steel were grouted solid D Empty cells were 0 Filled With insulation 0 Covered With grout paper D Cast set (s) of (_ x _) grout test cylinders D Cast set (s) of (_ x _) mortar test cylinders D Cast set (s) of 0 solid test pnsms 0 hollow test prisms D Addlilonal Comments liilIl Contractor was asked to notify our office when additional services are needed Iii To the best of our knowledge, the work Inspected above was In accordance With the bUilding department approved design drawings, speCifications and applicable workmanship prOVIsions of the International BUilding Code o Re-Inspectlon Required o Non-Compliance Inspector DaVid Smith Respectfully Submitted, ProfeSSional Service In5!J;stnes, Inc Reviewed By o Requires Engineers Acceptance (RFI) leBO # 0877340,84 I Dlstnbutlon List Robert Castile ILO Constructlon- lio2@comcast net Eric Hall Architects - annette@erlchallarchltecl com Erik Kunbel CCB #176269 ~ THIS REPORT IS PROVIDED FOP THE illFORMA TlON OF THE CLIENT ONL Y THE REPROOUCTlON OF THiS REPORT BY ANY METHOD AND ITS TRANSMiTTAL TO A THiRD PARTY BY ANY MEANS EXCEPT IN FULL is PROHiBITED WITHOUT THE WRiTTEN PERMISSiON OF PROFESSIONAL SERVICE INDUSTRIES ProfeSSional Service Industnes, Inc o1040-A Shelley Street 0 Spnngfleld, OR 97477' Phone 541/746-9649 0 Fax 541/746-7163