DAILY FIELD REPORT
Date Performed October 30, 2007 Report Number, 722-70227 -20
Client S R Yett Project Name Wilco- Olympic Spring
The Olympic, LLC
PO Box 26125 Project Location 1401 21 st St, Springfield, Oregon
Eugene, OR 97402
PO No PermIt No : COM 2007-00-834
Type of Structure Weather Overcast
Type of Inspection Epoxy
Field Observations and Comments
Performed visual Inspection during the Installation of (8) :y.," wedge anchors In the following locations at nOl'thwest
corner of building #6 wedge anchors torque to 200 PSI 2 wedge anchors to only 150 PSI The 2 wedge anchors at
150PSI had approval from Engineer and he had mentioned that he would be sending over an RFI on that matter
Verified minimum embedment depth of 8 Inches The wedge anchors were Installed in accordance with approved Job-
site plans Contractor was asked to notify our office when additional services are needed To the best of our knowledge
the work Inspected above was In accordance with the bUilding department design drawings, specifications and
applicable workmanship provISions of the International BUilding Code, except as noted
Inspector Pete Furlong
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649
"/"'
Joseph Vardner, EIT
Branch Manager
c
Robert Castile
ILO Constructloll- 1102@comcast net
Eric Hall Architects
Erik Kunbel
THIS REPORT IS PROViDED FOR THE INFORMATION OF THE CLIENT ONL I' THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
P P~RTY, BY f&Y MEANS' EXCEPT IN FULL WITHUU I I Ht:: WKII I clV '-c,,'~' ;)f" n:s,-:::SS:O!I,^ L S:~'l"'CE '''J;)l',TPIi=~ I~ PRnHIRITFn
ro esslona ervlce ndustnes, Inc o1040-A Shelley Street 0 Spnngfleld, OR 97477 0 Phone 541/746-9649 0 Fax 541/746-7163