Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-10-30 (2) l.".s., Information ~~. .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT Date Performed October 30, 2007 Report Number, 722-70227 -20 Client S R Yett Project Name Wilco- Olympic Spring The Olympic, LLC PO Box 26125 Project Location 1401 21 st St, Springfield, Oregon Eugene, OR 97402 PO No PermIt No : COM 2007-00-834 Type of Structure Weather Overcast Type of Inspection Epoxy Field Observations and Comments Performed visual Inspection during the Installation of (8) :y.," wedge anchors In the following locations at nOl'thwest corner of building #6 wedge anchors torque to 200 PSI 2 wedge anchors to only 150 PSI The 2 wedge anchors at 150PSI had approval from Engineer and he had mentioned that he would be sending over an RFI on that matter Verified minimum embedment depth of 8 Inches The wedge anchors were Installed in accordance with approved Job- site plans Contractor was asked to notify our office when additional services are needed To the best of our knowledge the work Inspected above was In accordance with the bUilding department design drawings, specifications and applicable workmanship provISions of the International BUilding Code, except as noted Inspector Pete Furlong CCB #176269 If you have any questions regarding this report, please feel free to contact us at 541-746-9649 "/"' Joseph Vardner, EIT Branch Manager c Robert Castile ILO Constructloll- 1102@comcast net Eric Hall Architects Erik Kunbel THIS REPORT IS PROViDED FOR THE INFORMATION OF THE CLIENT ONL I' THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD P P~RTY, BY f&Y MEANS' EXCEPT IN FULL WITHUU I I Ht:: WKII I clV '-c,,'~' ;)f" n:s,-:::SS:O!I,^ L S:~'l"'CE '''J;)l',TPIi=~ I~ PRnHIRITFn ro esslona ervlce ndustnes, Inc o1040-A Shelley Street 0 Spnngfleld, OR 97477 0 Phone 541/746-9649 0 Fax 541/746-7163