HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-10-26
October 26,2007
722-70227-18
Wilco- Olympic Spnng
1401 21st 8t
Spnngfleld, OR
PO No COM 2007-00-834
DAILY MASONRY FIELD KI:.t'UKT
l."'!f:;' Information
~~. .10 Build On
Engineering. Consulting. Testing
Client
S R Yetl
The Olympic, LLC
PO Box 26125
Eugene, OR 97402
Date Performed
Report No
Project Name
Project LocatIOn
"
Weather Clear
MATERIAL INFORMATION
SUPPLIER
MIX NUMBER
SLUMP
AIR CONTENT
AMBIENT TEMPERATURE
MATERIAL TEMPERATURE
TIME PLACED
NUMBER OF SAMPLES
DESIGN STRENGTH (PSI)
PLACED
liS Performed visual Inspection of reinforCing steel In the locations listed above
placement and clearances where applicable
D ReinforCing steel was secured uSlnCi
SPECIFIC PLACEMENT LOCATION (S)
8" cmu wall Illflll 0' to 7' 2" line A from 5 6 to 5 8, lop out 3
coarser wall line A Ilonl 5 3 to 5 6, and (2) columns at drive
througll 0' to 9' 6" and 9' 8"
Grout
Knife Rlvel
246HG3KOOO
8"
Pnsms
Mortar
56'
3 00 PM
2,000
3
ReinforCing steel was checked for grade, Size, lap,
m ReinforCing steel was placed In accordance with
. approved deSign draWings, specifications, and submittal from Hohback-Lewln dated September 18, 2007 detail SK-1
III AII'cells were relatively clean and mortar projections are within the limits of the International BUilding Code
II! Performed continuous Inspection dUring placement of grout In the locations listed above
D As directed by , continuous Inspection during placement of grout was not required
9 Grout was placed by pump and mechanically consolidated
III All cells were grouted solid D Only cells containing reinforCing steel were grouted solid
D Empty cells were D Filled with Insulation D Covered with grout paper
D Cast set (s) of x ) grout test cylinders
D Cast set (s) of x ) mortar test cylinders
D Cast set (s) of 0 solid test pnsms D hollow test pnsms
B Additional Comments Clean - outs proVided
IiIl Contractor was asked to notify our office when additional services are needed
III To the best of our knowledge, the work Inspected above was In accordance with the building department approved deSign draWings,
speCifications and applicable workmanship prOVIsions of the International BUilding Code, except as noted
D ReqUires Engineers Acceptance (RFI)
ICC #0877340,84 OBOA #442 I Distribution List
Robert Castile
ILO Constructlon- i102@comcast net
Enc Hall Architects - annette@enchallarchltect com
Enk Kunbel
D Non,Compllance
Inspector DaVid Smith
Respectfully Submitted,
ProfeSSIOnal Service Industnes, Inc CCB #176269
Revlew~d'~y '~/ ~
~r~, EIT Branch Manager
D
Re-Inspectlon ReqUired
THIS REPORT IS PROVIDED FOR THE INFORMA TiON OF THE CLIENT ONL Y THE REPRODUCTiON OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS
EXCEPT IN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
ProfeSSional Service Industrres, Inc .1040-A Shelley Street. Sprrngfleld, OR 97477. Phone 541/746-9649. Fax 541/746-7163