HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-12-27
~J JnfOmu.llion
~ - ~/ll .-n) 13uzlf] On
liEngln--. _" Jng ... ~lJitJng ... l'estJng
Client
Address
.. ... .
'Placement Data
S R Yett
The Olympic, LLC
PO Box 26125 ,,\.
Eugene, OR 97402
COMPRESSION REPORT
Project No 722,70227-31
ProJ Name Wllco- OlympiC Spring
LocatIOn
'Green House on west Side of bUilding (41) total post holes
Matenal Concrete
:LocatlOn Sampled At
;Northwest corner of green house
;
:Date Cast 11/28/07 Date Rec'd
:Tlcket No
333812
11/29/07
MIX No
105
Weather
c'
:.
Foggy
DeSign Strength (pSI)
: Cylinder No
07 -3965
07.3966
07 -3967
07 -3968
required 3,000
Test Date
Field Cure
(days)
Lab Cure
(days)
H 1 ' Cone (both ends) 2 - Cone/Verllcal Cracks (one end) 3 - Columnar
Remarks
C.
Age (days)
12/5/2007
12/26/2007
12/26/2007
Hold
7 ,"
28 .
28~:
H
Yardage
Load 1
ITotal 29
Supplier
Eugene Sand & Gravel
1401 21st St
Springfield, OR
;Slump (In) ASTM C143
;Max Aggr Size
Air Content ASTM C231
'Air Temperature (F)
Matenal Temp (F) ASTM C1064
Max Temp (F)
.Mln Temp (F)
ISpeclmen Size
Ynlt Weight (pcf) ASTM C138
Time Cast 8 30 AM
i
Additives UMA
Results Reported To
Date
B P No
PO No
Cast By
Field Test Data
..... ,.'''."..-.,
4 3/4"
1/2"
3390
6790
4x8
Cunng Conditions
Concrete Foreman
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
December 27,2007 CCB#176269
COM 2007-00-834
Michael Wright
... 11
1 day Fe, remainder ASTM
Compressive Strength Data ASTM C39
placed 3,500
Diameter or Cross SeFt Area Cylinder WT Camp Strength Capping Method
DimenSions Max Load (Ibs ) Fracture Type *' Test Time
(Inches) (s I ) (Ibs) (pSI)
C617 ,03 C1231-03
401 1263 84 34,660 2,740 3 3 45 PM X
402 1269. 84 51,770 4,080 3 1 53 PM X
402 1269 84 51,000 4,020 3 1 57 PM X
6
27
27
H
.C.... ,\
4 - Diagonal wino craklllg at ends ' 5 ' Side fractures (at top of bottom)
6", Top fractures (same as #5 but end of cyllnde'~ IS pOinted)'
ReJPej,~;~IIY Sub Itted,
pruliJCn:; S Ices Industries, Inc.
s'ven E Wilder
Laboratory Supervisor
THIS REPORT IS PROVIDED FO~ THE INFORM"" TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT BY ANY METHOD AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
Robert Castile
ILO Constructlon- Ilo2@comcast net
Enc Hall Architects
Erik Kunbel
1'1 ~ _,-
~, .