Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 ~HIGA.BURKHOLDER ~ {;N~ U~E l2.sNII~ ~ISl. ~~e,hc~'~ ~~6~oY ~ ~~~( June 29, 2006 I RECb;l \lED JUN 2 9 2006 BY: Mr Dave Puent City of Spnngfield Development Sernces Dep..... L~.ent 225 Fifth Street Springfield, OR 97477 Re: Glacier View Final Geotechnical Summary (P304S3) Dear Dave: This letter summarizes the earthwork and assocIated fill completed for the Glacier View Subd1vision during project construction on August 18, 2005 through September 27, 2005. Per the attached letter LuLU .eST, Inc dated looe ~8, 2006 the earthwork penormed by Wild1sh Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in accordance with the proJect reql.o.u.<'Ulents, plans, specifications, the PSI Geotechmcal Report dated July 22, 2005, and applicable workmanshlp proviSlons of the State Buildmg Code and Standards. lbe rnmirnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are natJ.ve cut lots and Lot 4 will be addressed at a later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of the SIngle fu:cily reSIdence lots up to fimshed sulrgrade and does not include footmg excavations, wmch have not yet been performed, and the placement of CT"ilshed rock. Please do not hesItate to call me with any questions at 988-1862 or Ray Al1perti from PSL Ine at 746-9649 S!...l1cer~lY:1 Higa Burkholder ASSOCIates, Lie r~ I .1 \ . ~J): Todd Powell, P E. ProJ ect Engmeer Cc: Joe Hams I JeffSmd.t, 2J. LtC Ray .<\lipertl, PSI, LflC. 5VERETT .. ~ 721 Hewlt':: A\ienue . SUlCa 401 . Everett, Washington 88201 . [4ee) 252-aS26 . fax' (425) 252-9551 SPRINGf"IEL.O. 1 ED NOf"'th 7t." St.~eet . SPf"'lf"'gfisJd, LJr.egon 97477 II (541) 9BS-1 BB2 . fax ['541j 988-1863 1 - d 99GB-BBS flvSl .Ja'>lTal"l ,.. dRc:;:qn qn c:;r ~nl-l