June 29, 2006
I RECb;l \lED
JUN 2 9 2006
BY:
Mr Dave Puent
City of Spnngfield
Development Sernces Dep..... L~.ent
225 Fifth Street
Springfield, OR 97477
Re: Glacier View Final Geotechnical Summary
(P304S3)
Dear Dave:
This letter summarizes the earthwork and assocIated fill completed for the Glacier View
Subd1vision during project construction on August 18, 2005 through September 27, 2005.
Per the attached letter LuLU .eST, Inc dated looe ~8, 2006 the earthwork penormed by Wild1sh
Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in
accordance with the proJect reql.o.u.<'Ulents, plans, specifications, the PSI Geotechmcal Report
dated July 22, 2005, and applicable workmanshlp proviSlons of the State Buildmg Code and
Standards.
lbe rnmirnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are natJ.ve cut lots and Lot 4 will be addressed at a
later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of
the SIngle fu:cily reSIdence lots up to fimshed sulrgrade and does not include footmg excavations,
wmch have not yet been performed, and the placement of CT"ilshed rock.
Please do not hesItate to call me with any questions at 988-1862 or Ray Al1perti from PSL Ine at
746-9649
S!...l1cer~lY:1
Higa Burkholder ASSOCIates, Lie
r~
I .1
\ . ~J):
Todd Powell, P E.
ProJ ect Engmeer
Cc: Joe Hams I JeffSmd.t, 2J. LtC
Ray .<\lipertl, PSI, LflC.
5VERETT .. ~ 721 Hewlt':: A\ienue . SUlCa 401 . Everett, Washington 88201 . [4ee) 252-aS26 . fax' (425) 252-9551
SPRINGf"IEL.O. 1 ED NOf"'th 7t." St.~eet . SPf"'lf"'gfisJd, LJr.egon 97477 II (541) 9BS-1 BB2 . fax ['541j 988-1863
1 - d
99GB-BBS flvSl
.Ja'>lTal"l ,..
dRc:;:qn qn c:;r ~nl-l