HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29
~HIGA.BURKHOLDER
~m (;N~ U~E l2.sNII~ ~ISl. ~~elhc~l~
'\ \\L A\l ~ · \ ~u})
~\~lj\l
June 29, 2006
I REC~l v"b;U
JUN 2 9 2006
Mr Dave Puent
City of Spnngfield
Development Sernces Department
225 Fifth Street
Springfield, OR 97477
BY:
.
Re: Glacier View Final Geotechnical Summary
(P304S3)
Dear Dave:
This letter summanzes the earthwork and associated filll,.uu,!-,leted for the Glacier View
Subd1vision during project Construction on August 18, 2005 through September 27, 2005.
Per the attached letter from PSI, Ine dated looe 28, 2006 the earthwork performed by Wildish
Sand and Gravel and mspected and observed by PSI, Inc. has been successfully completed in
accordance with the proJect reql.o.u.<'4Uents, plans, specifications, the PSI Geotecbmcal Report
dated July 22, 2005, and applicable workmanshlp proviSlons of the State Buildmg Code and
Standards.
The rnmirnum allowable soil beanng capaClty of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are native cut lots and Lot 4 will be addressed at a
later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of
the single family reSldence lots up to fuushed sul>-grade and does not include footmg excavations,
which have not yet been performed, and the placement of crllShed rock.
Please do not hesttate to call me with any quesnons at 988-1862 or Ray Al:tperti from PSI. Ine at
746-9649.
Sl..'1C-:l"-::l}l,
Riga Burkholder ASSOCIates, LLC
~
Todd Powell, P.E.
ProJ ect Engmeer
Ce. Joe Hams I Jeff Sincit, 2J. LLC
Ray .<\lipertl, PSI, he.
e;VEf:lEiT - A 721 Hewlr:1: A\ienue . Sulta 401 . Sleret1:, Washlrlg:on 98201 . r4e~) 252-2826 _ faX' [425] 252-9551
SPFlINGPIELC - , 5:l North 7th St.-est: II Spr,rgfield, Oroegon 87477 II [!541) SSs-, saa _ fax l541J 988-1863
1 . d
SS2B-BBS flvSl
..Ia'>lTaPl r
dRc;:qn qn CT ~n~