Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 ~\\o2'4-.b4: ~~QoeX V,6JJ)~ ~H,IGA.BURKHOLDER ~j.~ (;N~ U~E l2.sNII~ !:ISl. ~~e,hc~'~ June 29, 2006 RECb;l \lED JUN 2 9 2006 . BY: Mr Dave Puent City of Spnngfield Development Sernces Department 225 Fifth Street Springfield, OR 974i7 Re: Glacier VIew Final Geotechnical Summary (P304S3) Dear Dave: This letter summarizes the earthwork and associated fill completed for the Glacier View Subdivision during project construction on August 18, 2005 through September 27,2005. Per the attached letter .J.v....... EST, Ine dated looe ~8, 2006 the earthwork performed by Wild1sh Sand and Gravel and mspectCd and observed by PSL Inc. has been successfully completed in accordance with the proJect reql.o.u.<.wents, plans, specifications, the PSI GeotechnIcal Report dated July 22, 2005, and applicable \\orkmansb.1p proviSions of the State Buildmg Code and Standards. The rnmirnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are native cut lots and Lot 4 will be addressed at a later date. Please note that this letter and the attached PSI, Inc. letter covers the construction of the smgle family reSIdence lots up to timshed sub-grade and does not include footmg excavatlons, wmch have not yet been performed, and the placement of cr~hed rock Please do not hesItate to call me with any questions at 988-1862 or Ray Allperti from PSI, me at 746-9649 S!."1cerdy, Riga Burkholder ASSOCIates, LLC r A~~ n ~~J): Todd. Powell, P E. Project Engineer Cc; Joe Harris I Jeff Smdt, 2J. LiC Ray Alipertl, PSI, 111c. EVEJ:IETT · . 721 Hewlt:1: A\ienue . SUit.:: 401 . 8.riilrett:, WaGhlngt;on 001201 . r~e~) 252-2826. faX' (425] 252-95!51 SPRINGPIELO . , 5:) ~~c"th 7th Serest II Sp"I"gfield, Ol"egon 97477 . (541) ssa-, aaa II fax 1541 j 988-1863 / 1 . d 99GB-B8S flvSl .Jit'>lTitPl r dRC::!=ln qn cr ~nl-j