Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 '\\~ ~. (cO - / G \Ob if VltW Dv 11\ . I HIGA.BURKHOLDER J, ,ASSOCIATEB,LLC " LANe USE Pt..ANNING I CIVIl. ENeINecl=lING June 29, 2006 . RECEIVED JUN 2 9 2006 Mr Dave Puent City of Spnngfield Development Sernces Department 225 Fifth Street Springfield, OR 97477 BY: . -, Re: Glader View Final Geotechnical Summary (P304S3) Dear Dave: This letter summarizes the earthwork and assocIated fill w...~leted for the Glacier View Subdivision during project construction on August 18, 2005 through September 27, 2005. Per the attached letter .;lv....... PSI, Inc. dated looe ~8, 2006 the earthwork performed by Wildlsh Sand and, Gravel and inspected and observed by PSL Inc. has been successfully completed in accordance with the proJect reqtu.........ents, plans, specifications, the PSI GeotecbmcaI Report dated July 22, 2005, and applicable \\orkmansh1p prOVlSlons of the State Buildmg Code and Standards. The rnmirnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are native cut lots and Lot 4 will be addressed at a later date. Please note that this letter and the attached PSI, Inc. letter covers the construction of the smgle family resIdence lots up to timshed su~grade and does not mclude footIng excavattons, wmch have not yet been performed, and the placement of crllShed rock. Please do not hesitate to call me with any questons at 988-1862 or Ray Al1pertl from PSI, me at 746-9649 S!.."1C'er~!~l, Riga Burkholder Associates, LLC ~ ToddPoweU, P.E. Project Engmeer Ce' Joe Hams I Jeff Smdt, 2J, lie Ray .4Jipertl, PSI, he. EVEJ:IEiT · ~ 721 Hew~ Avenue. Sult;",401 II Everett, Washington S8~01 . [4ee] e52-282S . fax (425) 252-9551 SPFlINGf"IELO. , 5.'J Nerth 7th Screen: II Sprll"gfield,Ol'egon S7477 . (541) ssa-, SS2 . fax i!541 J 988-1 SS3 1 . d S9GB-BSS [11-5) .Ja'>lTal'l r dR~:qn "In CT ~nl-l