Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 L\ \ \014\ lol1&.\Diuf , ~\fu) Dr ~HIGA.BURKHOLDER ~~ (;N~ U~E l2.sNII~ ~ISl. ~~e,hc~!S June 29,2006 I RECh;l \lED JUN 2 9 2006 , . BY: Mr Dave Puent City of Spnngfield Development Sernces Dep..... L~.ent 225 Fifth Street Spnngfield, OR 97477 Re: Glacier VIew Final Geotechnical Summary (P304S3) Dear Dave: This letter summarizes the earthwork and associated fill completed for the Glacier View Subdivision during project construction on August 18, 2005 through September 27, 2005. Per the attacbed letter Lv....... .eST, me dated looe 28,2006 the earthwork performed by Wild1sh Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in accordance with the project reql.o.u........ents, plans. specifications, the PSI Geotechnical Report dated July 22, 2005, and applicable \\orkmansb.1p prOVlSlons of the State Buildmg Code and Standards. The rnmirnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are native cut lots and Lot 4 win be addressed at a later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of the SIngle family reSIdence lots l.lp to timshed sub-grade and does not include footIng excavatlons, which have not yet been performed, and the placement of cr<.1Shcd rock ... Please do not hesItate to caJI me with any quesnons at 988-1862 or Ray Allpertl from PSI, me at 746-9649. S!.."cer~l~l~ Higa Burkholder ASSOCIates, LLC ~ Todd Powell, P E. PrOject Engmeer Cc: Joe Hams I JeffSmdt, 2J, LLe Ray ..uipex;tl, PSI, he. EVERETT · ~ 721 Hewtc;: A\lenue . SU~ 401 . Everett, Washln~on 98201 . [~e15] e52-aS26 . fax (425) 252-9551 SPRINlllflIEL.O · , 5:J ~~ot'th 7t..... St.~eGt . Sprlt'gfie/d, Oregon 87477 II (541) 9BS.' SS2 . !'ax l'S41 j 888-1963 1 . d 9928-889 flio!;) .Ja'>lTal"l r dR~:qn qn t:T ~nl-l