Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 ~\Q\ '4\\.0'0 G.Ubef \\tJD D( ~HIGA.BURKHOLDER tmf 6.~ U~E 9CAgN!~ I~L ~GlhE~,B June 29, 2006 I .RECb;IVED JUN 2 9 2006 BY: Mr Dave Puent City of Spnngfield Development Sernces Department 225 Fifth Street Springfield, OR 97477 Re: Glader VIew Final Geotechnical Summary (P30453) Dear Dave: This letter summar:tzes the earthwork and associated fill completed for the Glacier View Subdivision during project construction on August 18, 2005 through September 27, 2005. Per the attached letter from PST, me dated looe 28,2006 the earthwork performed by Wild1sh Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in accordance with the proJect reqlw.<-utents, plans, specifications, the PSI Geotecbmcal Report dated July 22, 2005, and applicable \\orkmansb.1p proviSIons of the State Buildmg Code and Standards. lbe rIl111JI!lum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are natIve cut lots and Lot 4 win be addressed at a later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of the SIngle family TeSldence lots up to finished su~grade and does not include footIng excavations, wmch have not yet been performed, and the placement of cr~ed rock 0- Please do not hesltate to call me with any quesnons at 988-1862 or Ray AliperO from PSI, TIle at 746-9649. S!.."1.cer~l)l;J Higa Burkholder .~5ociates, LLC ~4 ToddPoweU, F.E. Project Engineer Ce' Joe Hams I JeffSmdt, 2J, liC Ray Aliperti, PSI, l11C. EVEJ:IEiT · . 721 l-lewltO: Avenue. SUIt",401 II Everett, Washington 981201 . [4ee] eSe-aSe6 . faX' (425] 252-95:;;1 SPRINSPIELO . , 5:J NCr'th 7tl"l St:re6/t ,. Spf'lf'gnsld, Oregon 97477 . [541] SSS-' S62 . fax i541j 988.1863 I . d 9SGB-BBS fli-S) .Ja'>lTaP'l r aR~:qn qn ~T ~n~