Re: Glader VIew Final Geotechnical Summary
(P30453)
Dear Dave:
This letter summar:tzes the earthwork and associated fill completed for the Glacier View
Subdivision during project construction on August 18, 2005 through September 27, 2005.
Per the attached letter from PST, me dated looe 28,2006 the earthwork performed by Wild1sh
Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in
accordance with the proJect reqlw.<-utents, plans, specifications, the PSI Geotecbmcal Report
dated July 22, 2005, and applicable \\orkmansb.1p proviSIons of the State Buildmg Code and
Standards.
lbe rIl111JI!lum allowable soil beanng capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are natIve cut lots and Lot 4 win be addressed at a
later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of
the SIngle family TeSldence lots up to finished su~grade and does not include footIng excavations,
wmch have not yet been performed, and the placement of cr~ed rock
0-
Please do not hesltate to call me with any quesnons at 988-1862 or Ray AliperO from PSI, TIle at
746-9649.
S!.."1.cer~l)l;J
Higa Burkholder .~5ociates, LLC
~4
ToddPoweU, F.E.
Project Engineer
Ce' Joe Hams I JeffSmdt, 2J, liC
Ray Aliperti, PSI, l11C.
EVEJ:IEiT · . 721 l-lewltO: Avenue. SUIt",401 II Everett, Washington 981201 . [4ee] eSe-aSe6 . faX' (425] 252-95:;;1
SPRINSPIELO . , 5:J NCr'th 7tl"l St:re6/t ,. Spf'lf'gnsld, Oregon 97477 . [541] SSS-' S62 . fax i541j 988.1863
I . d
9SGB-BBS fli-S)
.Ja'>lTaP'l r
aR~:qn qn ~T ~n~