Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 L\\55~\5l G ~{>Cce,r \ \ltU D ( ~HIGA.BURKHOLDER tm:,~ (;N~ U~E l2.sNI,~ !:ISl. ~~e,hc~;S June 29, 2006 I ~EIVED JUN.2 9 2006 Mr Dave Puent City 'of Spnngfield Development Sernces Department 225 Fifth Street Spnngfield, OR 97477 BY: r Re; Glacier VIew Final Geotechnical Summary (P304S3) Dear Dave: This letter summarizes the earthwork and assocIated fill completed for the Glacier View Subdivision during project constructIon on August 18, 2005 through Septe~er 27, 2005. Per the attacbed letter ~VLU .eST, me dated looe 28, 2006 the earthwork performed by Wildlsh Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in accordance with the proJect reql.o.u.<......ents, plans, Specifications, the PSI Geotechnical Report dated July 22, 2005, and applicable workmanshlp prOVlSlons of the State Buildmg Code and Standards. The rnumnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, md 14 are natlve cut lots and Lot 4 will be addressed at a later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of the smgle family reSIdence lots up to finished sub-grade and does not include footIng excavatlons, wmch have not yet been performed, and the placement of cr\.lShai rock. . .. Please do not hesItate: to call me with any questions at 988-1862 or Ray Al:tpertl from PSI, me at 746-.9649 S!...l1.':er~!y;) Higa Burkholder ASSOCIates, LLC r AJ~ n \rHJtJ/J,( Todd Powell, P.E. Project Engineer CC' Joe Hams I Jeff Sindt, 2J, LtC Ray Alipertl, PSI, Inc. EVEJ:lETT II ~ 721 Hewrc:: A\ienue II S\-lltZ 401 II Sierett, Washington 98201 . [4ei5) Sl52-l!826 . faX' (425] 252-95::1 SPI=IING"IELC. 1 ELl ~~o,.,th 7th St:reet: II Spr''''gfield, Oregon 97477 II [341) SSS-' S62 II fax !'S41J 988-1 863 1 - d 99GB-889 -( 1,.9) .Ja'>lTal'1 r dR~:qn qn CT ~nl-l