Re; Glacier VIew Final Geotechnical Summary
(P304S3)
Dear Dave:
This letter summarizes the earthwork and assocIated fill completed for the Glacier View
Subdivision during project constructIon on August 18, 2005 through Septe~er 27, 2005.
Per the attacbed letter ~VLU .eST, me dated looe 28, 2006 the earthwork performed by Wildlsh
Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in
accordance with the proJect reql.o.u.<......ents, plans, Specifications, the PSI Geotechnical Report
dated July 22, 2005, and applicable workmanshlp prOVlSlons of the State Buildmg Code and
Standards.
The rnumnum allowable soil beanng capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are natlve cut lots and Lot 4 will be addressed at a
later date. Please note that tlus letter and the attached PSI, Inc. letter covers the construction of
the smgle family reSIdence lots up to finished sub-grade and does not include footIng excavatlons,
wmch have not yet been performed, and the placement of cr\.lShai rock.
. ..
Please do not hesItate: to call me with any questions at 988-1862 or Ray Al:tpertl from PSI, me at
746-.9649
S!...l1.':er~!y;)
Higa Burkholder ASSOCIates, LLC
r AJ~ n
\rHJtJ/J,(
Todd Powell, P.E.
Project Engineer
CC' Joe Hams I Jeff Sindt, 2J, LtC
Ray Alipertl, PSI, Inc.
EVEJ:lETT II ~ 721 Hewrc:: A\ienue II S\-lltZ 401 II Sierett, Washington 98201 . [4ei5) Sl52-l!826 . faX' (425] 252-95::1
SPI=IING"IELC. 1 ELl ~~o,.,th 7th St:reet: II Spr''''gfield, Oregon 97477 II [341) SSS-' S62 II fax !'S41J 988-1 863
1 - d
99GB-889 -( 1,.9)
.Ja'>lTal'1 r
dR~:qn qn CT ~nl-l