Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29 , L\'\^. \4\C\ ~ 6 \(It\e~w ~HIGA.BURKHOlDER ~{ (;N~ U~E 2fNi,~ ::lS~ ~~a,b=~!S June 29, 2006 , REC.b;l \TED JUN 2 9 2006 BY: Mr Dave Puent City of Spnngfield Development Semces Department 225 FIfth StreeT Spnngfield, OR 97477 Re: Glacier View Final Geotechnical Summary (P30453) Dear Dave: This letter summarizes the earthwork and assocIated fill completed for the Glacier View Subdivision during project cOnstructOD on August 18, 2005 through September 27,2005. Per the attached letter from ~~L Inc dated JWle 28, 2006 the earthwor.k performed by WildlSh Sand and Gravel and llf8pected and observed by ?SI, Inc. has been successfully completed in accordance with the project reqUlI'ements, plans. specifications, the PSI Geotechmcal Report dated July 22, 2005, and applicable workrnansl:up proviSlons of the State Buildmg Code and Standards. The mmimum allowable soil beanng capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, and 14 are natIve cut Jots and Lot 4 will be addressed at a later date. Please note that tlus letter and the attached PSI, Inc. letter covers the constructIon of the smgle family reSIdence lots up to finished sub-grade and does not mcluae footing excavatIons, whIch have not yet been performed, and the placement of crilshed rock Please do not hesItate to call me with any quesnons at 988-1862 or Ray Allpert1 from PSI, Ine at 746-9649 ~h...'1cer~l)';J Riga Burkholder A,SSOClates, LLC r A~~ ~ ~t.Uf1J: Todd Powell, F,E. PrOject Engmeer Cc: Joe Hams I JeffSmdt, 2J, LLC Ray .CJipertl, PSI, Ll'lc. EVERETT \I .721 HewiCt A.l'lnuE! . Sut:a 401 D Ev",rett:, Washington 98e01 . (4eS) 252-El826 . faX' [4<;l5J 252.9551 SJ'I=lINGlI"IELO . 1 5:J ~~arth 7th St:,~e5Jt: II Spr,rgfleld, Oregon 87477 . (541) SSS.' 862. fax [541 J 988-1863 I . d 9SGB-BBS (It9) .Ja'>llaM L 0I89:S0 SO 91 :;'l"l:J