HomeMy WebLinkAboutPermit Field Test & Inspection Report 2006-6-29
L\\W L\\D, GtWd
, \'tw D(
~HIGA.BURKHOLDER
fmf ~~ U~E ~LSNI,~ !:1~L ~~G,be~l~
June 29, 2006
I RECEIv ~1J
JUN 2 9 Z006
1vfr Dave Puent
City of Spnngfield
Development SeMces Dep... uuent
225 Fifth Street
Spnngfield, OR 974i7
BY:
. -
Re; Glader View Final Geotechnical Summary
(P30453)
Dear Dave:
This letter summarizes the earthwork and assocIated fill........pleted for the Glacier View
Subdivision during project Construcnon on August] 8, 2005 through September 27, 2005.
Per the attached letter from P.SI, Inc. dated June 28, 2006 the earthwork performed by WildlSh
Sand and Gravel and mspected and observed by PSL Inc. bas been successfully compIeted in
accordance with the project reql.w.<.w.ents, plans, specifications, the PSI GeotechnIcal Report
dated July 22, 2005, and applicable ",orkmanshlp proviSIons of the State Building Code and
Standards. ,
lne mmimum allowable soil beanng capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are natIve cut lots and Lot 4 will be addressed at a
later date. Please note that this letter and the attached PSI, Inc. letter covers the construction of
the smgIe family reSldence lots up to timshed sulrgrade and does not mclude footIng excavatIons,
wmch have not yet been performed, and the placement of cr\.lShed rock.
..
Please do not hesitate to call me with any questions at 988-1862 or Ray Al1pertl from PSI, me at
746-9649
Sl...'1cer~l;',
Higa Burkholder ASSoCIates, LLC
r AJ~ n
~,~reu
Ce.
Joe Hams I Jeff Smdt, 2J, lie
Ray .4Jipertl, PSI, Inc.
ToddPoweU, F.E.
ProJ ect Engmeer
J EXPIRES: 12131/o~
EV~ETT · ~ 721 Hewn:;: Avenue. Sur;.:; 401 . Ev~rett:, Washll"lgeon 98201 . [4ee) 252-2826 . faX' (425) 252.S5!::1
SPRINGfI'ELC . , 5:J North 'to'" 51:.~eGlt . SprlrgfieJd, Oroegon 97477 . (541) Sas.1 saa . fax ['541 J 988-1 963
1 . d
SSGS-BSS fl?9J
..la)jTal'l r
c1Rc::qn qn c:r :iJn~