June 29,2006
RECEIVED
JUN 2. 9 2006
BY:
Mr Dave Puent
City of Spnngfield
Development SeMces Depcu ;"~.ent
225 Fifth Street
Springfield, OR 97477
Re: Glader VIew Final Geotechnical Summary
(P30453)
Dear Dave:
This letter summarizes the earthwork and assocIated :fill completed for the Glacier View
Subdivision during project Construction on August 18, 2005 through September 27,2005.
Per the attached letter ..J.VL.U .eST, Inc dated June ~8, 2006 the earthwork performed by Wilchsh
Sand and Gravel and mspected and observed by PSL Inc. has been successfully completed in
accordance with the project reqL.u.~u.lents, plans. specifications, the PSI G..."'.......bn1cal Report
dated July 22, 2005, and applicable workmansblp prOviSlODS of the State Buildmg Code and
Standards.
The mmimum allowable soil beanng capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, md 14 are natJ.ve cut lots and Lot 4 will be addressed at a
later date. Please note that thJ.s letter and the attached PSI, Inc. letter covers the construction of
the singIe family reSldence lots up to timshed sub-grade and does not include footIng excavations,
which have not yet been performed, and the placement of crllShed rock.
Please do not hesltat.e to ca1l me with any quesnons at 988-1862 or Ray Ahperti from PSL me at
746-9649.
Sl..'1C'~~l-)l,
Higa Burkholder ASSOCIates, LLC
r A,~ ,1
~d(
Todd Powell, P E.
Project Engineer
Cc: Joe Hams I JeffSmdt, 2J, LLe
Ray .qJipertl, PSL L'1c.
EVEJ:lETT · ~ 721 Hewit;: Avenue. Sur::.:; 401 . EviOlrett, Washington 98201 . [4e!5) 252-aU!r2S . faX' (425] 252-95:1
SPI=IINGPIELO. 15.:) ~.Jo,..th 7th St1"Elsrt: a Spr'lr'gfisld, Or-egon 87477 II (541) SSa., Ba2 . fax 1641J 988-1853
t . d
9S2B-B89 rtirC;1
...a'>lTal"l ,..
a:3Icc::cn on ~T 9.....u