HomeMy WebLinkAboutPermit Field Test & Inspection Report 2005-7-12
07/12/2005 02:59
5038972013
INDEPENDENT PRESS
PAGE 02
\l\~
5q4h ~,-
Independent Inspection
978 SW Hall Avenue
Mill City, Oregon 971fJO
I 503 897 3269
Page ()t
Daily Field Report
High Strength Bolting
Project: All Pro Machine
Date: June 12,2005
Job Address: Springfield, OregOIl
Client: Oregon Cascade FabricatJon
Eugene, Oregon
Pe..mit Number: Amended Renort
Weather:
Temp:
Time Arrived:
Time Departed:
Inspection Site:
This is an amended renort to the June 26. 2004 Insneetio":
Inspector was called to perform a h1gh strength bolting Inspection to the already assembled building
located at the north side of the lot.
Observed I Verified:
Reviewed the approved drawings and contract speclflcatJons. Venfied that all faymg surfaces were in
contact and performed a torsion test to J 5% of all bolts at various conncctlOns to verify bolts were
ten~ioned to the correct compressiOn. Verified that aJl hoh~ were of the ASTM A-325 as required
Inspection Compliance:
InstallatlOn of the ASTM A-325 bolts comp]ie~ with cnteria set l'orth by the me, the contract
documents, and the AIse.
NOTE: Due to retuemenl my leBO certlficatlon expired as of June 30, 2004
Inspector: 1 If
~ <:to ~- A_'i/cC'-'1
Certification No.: CWI #98-010981/lCBO # I ()79292-851 cOP #713 / OBOA #3961 WABO HAN-36-0793
These test aod Inspectu:1n results relate Gilly to the specific test locations !luted. Inspector IS not responsible f()~ BOY other IOC8tl01l
or clevati()n. Reports may not be reprodul;ed, e~cept In full. Without w~ittcn pe~lnlsSlon of Inspector