Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2004-9-20 $1P-20-2004 a2:91pm Frcm-K & A En.lneerIRI. Ine ~ ~'ol~ ~\w- +541-884-9358 T-735 P 002/007 F-95f a 'ngln"rrng K I A Engineering, Inc. P.O. Bal28624, EDgene, OR 17a 521 MerbI IL, Ioite It Ell..... OR 17. (&41) ...... Voice (141) 1184-" FAX september HI- Hayden Homes 2464 SW Glacter Place. SUIte 110 Redmond, OR g7758 Subject Quality assurance. house foundatlon pad construotion Jasper Meadows SubdMsion - 2ftd Addition Springfl8ICI. Oregon ' ProjIII:t: 74.04 PURPOSE AND SCOPE M 1'8t1uested. K & A Engineering. Inc, has completed monitoring the construction of Individual foundation pads at the subject new residantlalsUMMSIon. 39 incftvidual foundation pads were construcl8d at the site and prepared ready tor 10rmJng nsw foundaUOJJB. Prior to construction, a Geotechnical ~gatiDnl was made of the subdivision to develop specific f8Commrmdattons for developing 1h8 site for nlsldentl8l foun,datlonsr~. and uuutl8s. The purpose Of our allVices was to provide monItOr constructlon at foundation paas to assure that OOf1BtnJUtian crlt8rla outlined In the ge0f8chn1ca1lnvestlgation was addressed.' , 11118 report documents foundation pad construction and makes recommendatiOns for suitability for residential foundation construcIion. FOUNDA11ON PAD EXCAYAnoN Gllld The faundltion pads dGvefoped tor ttds project are to support conventionally framed resid.,ntial atnICtur88 supported by conventional cast.Jn-pl8Ce conCRlte sprBad footings. Due to 1he slope or tI1s SIt8 most of tile foundation pads were ~ed In two or more benohes, sapara1ed In grade by approximately 1 to 2-feet. FoundIdoIl hill The aeotechnlcallnve8tlaaUon (Bofre) had predicted that hIgh plastiCity silts or clays would underlie the site. ExcavaUon for 1118 pad8 confirmed that in most of the foundation ~ds, there was 1 to 3-feet of a gray. highly plutlc. modllralBly atIff. and moist slit. In some locations the gray 81~ contained a slgnlftcant amount of sub- round8d Ign8ou8 cobbles, 111Is silt was often covered by 0.&-10 1.Q.1eet of damp, very low--denslty peaty siltS. weathered YBfIOw-tan tuffaceous siltStone or sandstone was encounterud underneath the plastic sills. 1 BOIre Asaoclates. Ine" G8OleChnlcallnvedgallon for tie Jasper Meadows Second Addition, Sprfngfteld. Oraoon. FtbnJaIy 16. 2003. 8 'd Z8L9'oN S3~OH N30AVH ~dH:Z 900Z '9 'uer Sep-ZO-2004 02:31pm Frum-K & A En,lnllrini, Inc +541"694-8358 T-735 P ODS/OOT F-952 K & A Enatneerlng, Inc. TIte gray plastic sills and gray plastic llllW w~h oabbles were deepest through the western portion 01 the subdivision. IsoIat8d zones of gmy plastic sltt or plastic slK with cobbles Wit also encountered throughout 1he centJal and eastern portions at the eubdMston. FaIDlDIiDD hd GOIlatrucllon Because the depth and _Ill of sods varied significantly across the 8ubdlv~n, ~h pad was evaluated IndlYlduallY to d8tlrmlne the proper depth of excavation and tile amount 01 &elect fiR to be placed in the excavation. For manY r}f ~ foundatiOn pad8, the depth to weathered slRstone or sandstone was less than 2.feet and, In Ihes8 cases, the foundatiOn pads were excavated to bedrOCk, and gradid smooth, JeveI. and free from loose matvrfals. In ~ casas the base or the excavation was in two benches separated in grade from 1 to 2.feet S818ct aranular fII WI8 placed In the prepared excavation and brought to footing gracm. In those aras aI deeper gray plastic sRI, the sifts weAl removed to a minimum depth tt 1 &-inche8 below footing grade. The battolTl$ of the excavations were graded smooth, level, and free from loose materialS. In most cases the bas& Of tho excavation W88 In two benches separated In grade frOm 1 to 2-f8et. Select granular nn was placed in thu ~ 8XCaVlltfon and brooohUa fooling grade. In all cases where peaty slits wel1 encountered, the peaty-sJlls were completely removad frOm the foundallon area. hIeeI CIt'8nUI&r FiRe Select granular fills consisted of a sub-base material and a baSe material. The scbobue material was placed on 1M prepared subgrade in the'foundatton pads and con9f8t8d of a S-Inch minus weu.grad8d quany aggragat8. The baee material was placed over the sub-l>aSe rock and con8l8t8d Df, a 1 *'~ minus densellradad quany aggl'8Q8l9. BaIh aggregates were produced at the MD1'S8 Bros. Quany In Sprlngtleld. 11IB 8IJb.baSG thIoIcn8sI generallY ranged from 6 to 12-inche8. Base rock ranged from 4 to 12..tnches In 1hIckneaa. In a few aU8S (Iot8 33 throUgh 39) tile sub-ba8e rock was elimInated and base rock was used exclusJv8ly for the uIact lIl1Ilufar flU. The select granular fiUS were well compacted in 12-inch maximum lifts (loose) using a steel-Whe8led Y1b, caI.u.1 roller. Water was applied 88 necessary to maintain optImUm water content during compaction. DenIIty If 8111cl8rDu1ar FIlla SUb-base The denstty of the sub-base was evaIUatBd by InSpection of placement methods and fleld evaluaUon of water content. The denslly was considered adaquale If passes by the large vibratory BtsekIrum roller did not IeM vlslbIe markS In the sub-bUe aggregatD lit the edges of the dl1l1l Bnd if the soil wablr content appeared to be near optimum as deteImlned In the ftekl~' 2 Squee2lnQ a small amount of 118 liner aaureum in the hand did not produce sillRificant free water and WOlJld f8ma1n In a relllMly unIfoml bit wtfIout immediately tailing apart. Project 74.04 Jasper Meadows Subdivision PhaSe II, Springfield, OR' Page 2 of 3 ClI6nt Hayden Homes september 20, 2004 V 'd ZEL9'oN S3~OH N30AVH ~d9t:Z 900Z 'g 'uer