HomeMy WebLinkAboutPermit Field Test & Inspection Report 2003-8-11
Of
AUI-ll-Z003 10:Z4am From-K & A Enllneerlnl, Inc
"
.a
engln.trlng
August 11, 2003
Fax
To:
Fax:
Bob Barnhart, City of Sprfngfleld
726-3367
Subject: Geotech. report.. 2299 37'" St.
+541-684-9358
T-Z56 P 001/006 F-908
K a A Engineering, Inc.
P.O. 80123624. Eugene. OR 81402
621 Malhi St., Suite B) Eugene. OR 91402
(&41) 684--9399 Voice
(141) 684-9368 FAX
From: Michael Remboldt, P.E.
Pages: 6
DaI8: 8/11/2003
Attached is the geotechnical report for the River Valley Builders Inc. project at 3452 Ambleslde. Please call If you have
any questions.
~.
Michael Remboldt, P.E.
K & A Engineering, Inc.
AUI-II-2003 10:24am From-K & A Enllneerlnl, Inc
+541-684-9358
T-256 P 002/006 F-908
.;
Community Servjcc~ Div. Building SafelY
CITY OF SPRINGFIELD, OREGON
225 Sill Strecl. Springfield. OR 97477 Ph. 726-~759
Job Address ':l452 Amb~'e~ ; rlj:) Iilr.
City lob 4# car, 2Q03-0Q584
..
AMBLESIDE MEADOWS SUBDIVISION--tST ADDITION
I Site Investigation Questionnaire for Consulting Design Professionals
foundation requirements - new structures on residentia110ts
ThIs torm may be used as a temporary verification to allow construction to conUnue
on the job site until the consultant's stamped aftidavit9D the site soli compaction
and stabUlzatlon Is submitted to the City. ThIs form mbst be completed by a
licensed design professional (engineer or architect) or hlslher authorized employee,
and submitted to the building inspector prior to requesting City inspeet10DS or
placing foundation concrete. It is important that all questions be 811SWered
completely for the foundation site to be approved for construction.
Owner and/or Contractor Ri vel" Valley Bui 1 ders. Inc.
1. Date oUhe design professional's site evaluation? 7/23/03
2. Bas the design professional reviewed a copy of the geotechnkallnformation
for the subdivision that was provided with the building permit? Yes xx No_
lf not, please contact this office for a copy of the report. The design professiontJ/
must be familiar with the geotechnical information before completing this form.
3. What was the size and depth of the exeavatJon and lor fill?
Excavation was agDI"OX. 4~l( 41\' o.nt inl""lJ\(ling ~ri\le"'iY iC:~~"E
Depth of excavation ranQed from 1.0 to 2.n-f~Pt -- .
Was existing non-stmctural fill or expansive soil encountered on the lot?
Yes;u.No If "yes'\ what types) depths and locations? T.he"~ \."......g
approx. 1:U- to 2. O-feet of-' oose construct'f on debris coverina the
ground includ1nq woody material.
SmLl If Iln"'''Y'..gQ.t"t:! tR8. ~gRg~""e'ih- deBris ecl"l! I ~...d..-o....~ . J d
-., , .. ~~, ""'>.r <;:"...c; \ovlJlpacte
coarse c,.ushed. QIl~"I"Y )On,.!! tl'l ;l fi"'pt-h ()f iPprf.1"~''':'~~' a t&-4--fe:t.
Our unde.~stand' no '! s thi'lt this w~~ plat'Prl din'" n~ "l'\nstI"UC+~ ^'" 'Jf tl:le
SI.Ibd1V1 Sl on.
What measures were1aken to remedy the soil condition (include type of
engineered fill used to stabilize the soil)? --.Ih~ 11n~II;hh 1 Q (,Ot:lit"ycti Qn debri s
was removed.
1
AUI-11-2003 10:24am From-K & A Enllneerlnl. Inc
+541-684-9358
T-256 P 003/006 F-908
;;;
Community Service", Div, Building Sufely
ClTY OF SPRINGFIELD, OREGON
225 Slh Sln:t:I, Spnngfield, OR 97477 Ph. 726-3759
lob Address 3452 AMbo' esi de Dr.
City lob ~OM.. 2003-0n58LJ
ThQ qll::a......A~rr" ~..c: 1Q\lAlAd-::anl"l ::a thin 1 i of+ o.f..d,Qnc:p_~l"l'Idpd
crushed aQQrpol'lte (3 to 4-inches in thickness) was placed over the
foundation area and compacted.
Is the site as prepared adequate:61 inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification of moisture stabilization in the sub
grade is a requirement of the geotechnical report. and must be affirmed before
construction can continue.
H inadequate. what measures are needed to provide constant moisture content in
the sub grade?
Is the site as prepared adequate [! inadequate 0 to suppon the proposed
structure? An affirmative answer is requisite to proceeding with construction.
If Inadequate, what additional work is needed to provide adequate
foundation support?
4. Did the design professional witness placement and COmpactlOD of the
engineered On, or is there a speclal inspection report fortbeomlng from a
qualified agency? 1 witnessed Plac~ment 0 Speciallnsplcompaction report CJ
Our understanding is that compattf6n records are in ex4stance at the City.
s. The design professlonallntends to use the following method for installation
of perforated perimeter tooting drains:
The design on the attached drawing provided by the design professional ...... 0
The method shown on the original constroetion drawings......... ................ 0
The typical "Foundation Drain' drawing attached to permit... .. ......... .. ... .. ~
Perforated perimeter drains are not required.. .... . .. ...... .... " ... . ... .. ... . . .... 0
COJI1lII1Cnts:
Note: City inspectors will inspect installed drains prior to cover upon request...
Call: 726-3769 to schedule inspection,
2
AUf-ll-Z003 10:Z5am Frcm-K & A Enflneerlnf, Inc
+541-684-9358
T-Z56 P 004/006 F-908
Community Serviec:~ DIY, BUilding SoIfely
CITY OF SPRINGFIELD, OREGON
225 5'h Sl~t, Springfield, OR 97477 Ph. 726-3759
Job Address 3452 Ambl es; de Dr.
City lob # Cl?~ 2003-00584
Low-point crawl space drains are required to prevent the build-up of excess
moisture inside the foundations during (and after) construction. This drain
may be Installed lflii: foundation pla_,.-.....~nt onlv with the exnl'eSS Del'miSflion
of the desin Drofessional.
a The design professional has detennined the following:
The crawl space drain is required when the foundation is installed..... 0
The low-point drain can be installed after foundation placement without a
signijkant moisture build-up problem within the foundation... .... ...... ~
(The low-point drain may be installed at the fram1 ng _stage
of construction) POll II HGm.framJIlR. fOOfing. etc.
b. Has the design professional observed and approved the installation of the
required low point drain ?..................... .............. Yes, No, v
if "yes", ,where is the low point drain located under the building and
where does it terminate at this time? (must be an approved location, i.e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.)
The design professional must determine whether the approved pennit drawings have
adequate foundation steel. Is any additional foundation steel required that Is Dot
shown on the foundation drawings for the buUding?
Yes No...u.... If "yes", describe additional steel required (or provide drawing).
The following statement must be signed by the individual doing the observations and
providing direction for the excavation and site preparation work on the property.
3
AUi-11-Z003 10:Z5am From-K & A Enilneerlni, Inc
+541-684-9358
T-Z56 P 005/006 F-908
Community Service~ Ow, Building SafelY
CITY OF SPRINGFIELD, OREGON
22~ Sill SlnlCI, Springfield, OR 97477 Ph. 726.nS9
Job Addresil452 Amh 1 es; de Dr.
City Job ~ _\~~j ?~OJ" ():O~l}~
The undersigned design professional (or tudhorit.etl employee) attests that he/she
oblened required moisture stabllily procedures on this 1iIe, and thai such procedlU'l/S
were tlCcompUshed before any changes occurred in the moisture conlent Dille sub-
grade under tllld around the bulldlng (wheN expansive lOth were IlICounured). The
undersignetlfurther attests thai the sub-grade, as prepared, Is tuleqlUlle to support the
b"'Uting proposed for this site.
Additional comments:
(Note): A copy of this report shaD be kept on site with the appro'fed plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices thig report was completed, affIrming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
__ _....- ,4I>r-...
Slgnatu~ . -.,.... "-J.... . -
Name Mi,..h1l.@l R~mboldtf P.E. Tltle}'r1nciDle fJlaineer
C~8DV K & A EriaineerinQ. Inc.
Phone (~4') ~A4-a~QQ
Licensee Michae1 Remboldt, P.E.
License - '9414
I ~/;j f I ~UU4
expires
The geotechnical report for the Ambleside Meadows - 1st Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub-grades. and that
expansive soils be over-excavated and replaced with at least 12 inches of fill compacted
to at least 95% of ASTM 0698 for foundation preparation. The report also recommends
that measures be taken to prevent water from collecting in or around the foundation areas
during and after the constIUctioD process, and that positive site drainage be provided to
reduce the infiltration of surface water into the expansive soils.
The geotechnical report further emphasizes that the fmish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, firmlv
comoacte4 to reduce the infiltration of water at the surface. The adequacy of fill soil
material around the building must be verified to the satisfaction of the design
professional.
4
AUI-11-2003 10:25am From-K & A Enllneerlnl, Ine
+541-684-9358
T-256 P 006/006 F-908
-'
Communuy Service, Dw, BUlldmg Saf~ty
CITY OF SPRINGFIELD, OREGON
22~ Slh ~lrocl, Springli~ld. OR 97477 Ph 726-3759
Job Addres,J452 Amb 1 es i de Dr.
City Job' cor, 2003 - 00584
Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1 st Addition
Subdivision
The undersigned hereby affirms that the excavation. structural fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my flnn and that the following is tnle:
1. The foundation sub-grade is capable of supporting a minimum of 1500 psf) and is
adequate to support the building proposed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
prior to any significant change in moisture content of the sub-grade.
3. The site is adequately graded and drained to prevent the collection of water in the
excavated area during construction.
4. The accompanying report titled "Site Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
!/?~l~f)? (date) for the building site was completed either by
myself or by an employee of my rum under my supervision. To the best of my
knowledge, the infonnation contained in that repon is complete and accurate.
Name ofUcensed Professional (print) ~ichael R~mbQl dt
Date
R/ll/M
r .,.
signatu~ ~~
~
~IOj:C:. /~,/~t:J.-
II