HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-10-7
FRQI"I :
FAX HO.
Oct. 07 2002 04:41Pf1 P6
-I
..
CummullIty ServlLes Div, Buddjng Safety
CITY OF SPRINGFiELD; OREGON
225 5'" Street., Springfield, OR 97477 'Ph. 726.3759
Job Address
City Job #
~r..,
~SA.O
Ir;>:'a :;V~:~_i .i'~ ~~ ~:~1 :..~':~i Sj~~t:~~i:.~1~:. ~~~~~?~ ~,~"\!.. ~:;.; +., .1~~~/~;~~..,:'j,:,,,",;"J ;. f" ':';:i:i: ~~.: .~: ~~t;f1'~ ~t~~~~'...:~;~~ ';
Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1st Addition
Subdivision
The undersigned hereby afflIr.'lS that the excavation. structural fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my fum and that the following is tme:
1. The foundation sub-grade is capable of supporting a minimum of 1.500 psf, and is
adequate tc support the building proposed for this site.
2 The mOisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
.l;'J.~~'J. to any significant change in moisture content of the sub-grade.
3. The site is adequately graded and drained. to prevent the collection of water in the
excavated area during construction.
4.
.
t~~
Date t~ 10 t.-
Name of Licensed Professional (print)
n
SignatureJ~ '
I
" >
~
f.XflJ~'FI::;I~ ti':;lc: v/0Jioal
FRGr'l :
FAX NO.
Oct. 07 2002 04: 39Pt1 P2
CCJI'l1muni!y Services Div, BUIlding SAfety
CITY OF SPRINGFIELD, OREGON
125 Stl1 Street, Springfield. OR 97477 Ph. 726-3759
Job Address 1. t. (, '"
City Job #
'?~' e.A
AMBLES IDE MEADOWS SUBDIVISION-1ST ADDITiON
Site Investigation Questionnaire for Consulting Design Professionals
foundation requirements ~ new structures on residential lots
This form may be used as a temporary verlticatioD to allow COll1Struction to continue
on the job site until the consultant's stamped aftidavit on the site soil compaction
and stabi.lizatiOD is submitted to the Oty. This f'viL.i.U must be c.ompleted by a
licensed design professional (engineer or archltect) or hislber authorized employee,
and submitted to the bunding inspector prior to requesting City inspections or
plaeing foundation concrete. It is important that all questions be answered
completely for the foundation site to be approl'ed fo:.. construction.
Owner and/or Contractor ~ '2.'1
1. Date of the design professional's site el'aluation?
1d.PM.&;7S
~'- 7 ~o e,c..T' 4. I 2,.e:l 0 'Z..
2. Has the dCfjign professional reviewed a copy of the geotechnical information
for the subdivision that was provided with the building permit? YesJ<.No_
If not, please con.tact this office for a copy vf the report. The design professional
must b~ familiar with th~ geotechnical information before completing this fonll.
3. What was the size and depth of the excavation and lor fill?
'L 'ZhEJO b
Was existing non-structural fill or expansive soil encountered on the lot?
Yes_NoX If "yes", what types, depths and locations?
What measures were taken to remedy the soil COPf}ti.'on (include type of
engineered fill used to stabilize the soil)? fJ, ~
1
FRQM :
FAX HO.
Oct. 07 2002 04:39PM P3
CornmunllV Service:; DIY. Buildmg Safety Job Address 'to ''It/,p(.,,
CITY OF SPRINGFIELD, OREGON City Job #
225 S!h Str",e(, Springfield, OR 97477 Ph. 726.3759
~~ p?
Is the site as prepared adequate;@. inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification ofmoislure stabilization in the sub
grade is a requirement of the geotechnical repon. and must be affirmed before
construction can continue.
If inadequate, what measures are needed to provide constant moisture content in
the sub grade?
Is the site as prepared adequa.te J'L in.adequate 0 to support the l'w!'u.:Jed
structure? An atfinnative an.wer is requisite to proceeding with construction.
H inadequate, what additional work is needed to provide adequate
foundation support?
4. Did the design professional witness placement and compaction of the 'f..J I ~
engineered fill, or is there a special inspection report forthcoming from a
qualified agency? I witnessed Placement 0 Speciallnsplcompaction report 0
5. The design professional intends to use the :following method for installation
of perforated perimeter footing drains:
The design on the attached drawing provided by the design professional..... . 0
The method shown on the original construction drawings......................... 0
The t"fPical 'Foundation Drain' drawing attached to permit ..................... 0
Perforated perimeter drains are not required.... . . .... . . ... .. .... . ... .. ... ........ .:a..
Comments:
Note: City inspec:tors will inspecr installed drains prior to cover upon request...
Call: 726-3769 ttJ schedule i.llspeczion.
2
FRQM :
FAX NO.
Oct. 07 2002 04.40PM P4
Communtty Services DIV, Buildjn~ Safety
CITY OF SPRINGFIELD, OREGO!\;
2255<11 Street., Springfield, OR 974"17 Ph,726-3759
Job Address "L-z...,~
City Job #_
~~ ~
Low-point crawl space drains are required to prevent the build..up of excess
moisture inside the foundations during (and after) construction. This drain
may be installed ~ foundation placement onI'\' with the .~resspermission
of the desi~n prof~~iomd~
a. The design professional has determined the following;
The crawl $pace drain is required when thefoun.dation is installed. ." 0
The low-pomr drain can be installed a.fter foundation placement without a
significant moisture bllild~up problem within the foundation............. ~
(The low. point drain may be installed at the _ ,;6.a ~ "11 .stage
of construction) past &: b=m.jmmJng. roofing, tttc.
b. Has the d~sign professional observed and approved the installation of the
required low point drain?.. ................... .............. Yes,_. No,.)<.-..
if 'yes'~ where is the low point drain located UJUler tlu:. building and
where does it terminate at this time? (must be an approved location, i.e.
street gutter, storm sewer, Skmp pump and discharge line to the street,
etc.)
The des1gn professional must detennine whether the approved pennit drawings have
adequate foundation steel. Is any additional foundation steel required that is not
shown on the foundation drawings for the building?
Yes x.. No . If 'Iyes ", describe additional steel required (or provide drawing).
The following starement must be signed by the individual doing the observations and
providing directionfor the e.tcavation and site preparation work on the property.
3
f"RQM .
FAX NO.
Oct. 07 2002 04:40Pt1 P5
-"
Community SerYl<..es Diy, Buildmg SafelY
CITY OF SPRINGFIELD, OREGON
225 5!~ Street, Srrjngtield, OR 97477 Ph. 726.3759
Job Address
City Job 1#
''"If'L lP "
'3 'b 'tV'
The undersigned design professional (or authorked employee) attests that he/she
observed required moisture stabiliJy procedures on this site1 and that such procedures
were accomplished before any changes occurred in the moisture conten.t of the sub.
grade uruler and around the building (where expansive soils were encou.ntered). The
undersigned further attests th4t the sub~grade, as prepared1 I's adequate to SUpport the
building proposed for this site.
Additional conunents:
(Note): A copy of this report shan be kept on site with the approved plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report was completed~ affIrming the infonnation
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to tlus office.rrior to requesting framing inspection for the building.
Signature \l~~ . \.t------
Name e.ta.::. /2J..~p~ Title ervh ,t.~ .
Company K btz. T t t;T2. -e t-3&,. L'1 ~ En...
Phone ~'-I'" 3&f'-:::a,
Licensee
License #
P A.M..l;;l..A
. ~!:t-'.r u- P E-
"SP W:l\\~-t-~M. p. B.
_ expires (.1 ~~/<' ~
The geotechnical report for the Ambleside Meadows _ 1 st Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub-grades. and tbat
expansive soil~ be over~excavated mid replaced with at least 12 inches of fill compacted
to at least 95% of ASTM D698 for foundation preparation. The report also recommends
that measures be taken to prevent water from collecting in or around the foundation areas
during and after the construction process, and that positive site drainage be provided to
reduce the infiltration of surface waler into the expansive soils.
The geotechnical report further emphasizes that the finish grade of landscape soil
adjacent to the foundation should be at least 24n above the expansive bearing soils, f1.11nh:
comoacted to reduce the infiltration of Water at the sUIface. The adequacy of fIll soil
material around the building must be verified to the satisfaction of the design
professional.
4