Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2002-3-20 FORD ~ NESS ~ FASSBENJER, INC. LAND SURVEYING. CONSTRUCTION SUPERVISION Iii WATER RIGHTS EXAMINATIONS CIVil ENGINEERING II GEOTECHNICAL 1llI ENVIRONMENTAL March 20, 2002 (\lf6 \Q\9~ ~\..... Dennrs Minium Construct/on 8745 Thurston Road Springfield, Oregon 97478 RE: Subgrade Evaluation lot 70 - levi Landing . -SpringfielctJ 'Oregon On March 19,2002, a representatIVe from Ford-Ness-Fassbender, Inc observed and hand- probed the building pad subgrade on Lot 70 In the LevI Landing subdivision to assess the subgrade bearing capacity and shnnk/swell potentIal of the soil The building pad shall be over-excavated at least 6-mches to remove surface vegetation and to expose a clayey silt/Silty clay subgrade 5011. The subgrade has a moderate shnnk/swell potential and is expected to have an allowable beanng capacity up to 1,500 psf To mitigate the potential for soil shrink/swell, the moisture content of the soil should be stabilized To prepare the subgrade for wet weather construction and to stabilize the soil mOisture content approximately 4-lnches of crushed %"-0 aggregate should be placed over the subgrade and compacted. The bUilding pad IS assessed to be SUitable for conventIonal resldentlaf constructIon With perimeter spread footings. We recommend that heavy equipment, such as concrete trucks, dump-trucks and lumber delivery trucks are not allowed on the building pad area during to the wet weather conditions We also recommend that perimeter footings be remforced with at least two No 4 steel reinforcing bars. We recommend that the landscape soil stope to direct surface water away from all foundatIons, and water should not pond adjacent to footings ~ Ronald J Derrick P.E. 116 Hwy. 99 N., Suite 1 OOD P.O. Box 22 735111 Eugene, OR 9740211 (541) 344.1852 iii Fax (541) 344.9923 E-mall.mail@fnfmc.netIlWebs;te:wwwfnflOc.net Certified W B E /0 B E