Loading...
HomeMy WebLinkAboutPermit Building 1993-2-17 1......----- .1 ,1,.'- , COMMERCIAL/INDUSTRIA PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ~ . JOB NUMBER~ INSPECTION LINE: 726,3769 OFFICE: 726,3759 LOCATION OF PROP9SED WORK: 553 Main Street, Springfield, ASSESS;RS MAP' \, () ():::2..;~~ 6 \ OR TAX LOT' \ \rYYJ CITY' Dave & Jeanette Balthrouoe 553 Main Street, Springfield, Springfield PHON'" 747-6664 OWNER' ADDRESS: OR 97477 STAT'" OR ADDITION, DEMOLISH OTHER ZIP: 97477 VALUE: ~ PHONE EXPIRES PHONE 6-30-93 688-2500 DESCRIPTION OF WORI<' NEW X REMODEL Install awning NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ADDRESS CONST, CO NT RACTO R . GENERAl' RAY-OoLITE SIGNS, INC, 101 N. Seneca, Euqene, OR 910321 PLUMBING' MECHANICA' ' ELECTR~:-OoLITE SIGNS, INC., 101 N. Seneca, Eugene, OR 20-160ClS 10/93 688-2500 PLUMBING MECHANICAL I "'HA~GEI I I I 1 1 I 1 I I $10,00 I I NO I, Single Fixture Relocated Bldg, (new fix, addtll Water Service FEE CHARGE NO t:'~~ , Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs It. Floor fyrnace and vent Suspended wall or floor mounted unit heater Appllance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg, Mechanical exhaust hood and duct Sanitary Sewer ft. 'ft, Storm Sewer Backflow Device ... Permit Issuance TOTAL PERMIT TOTAL PERMIT . OF BLDGS' - OFF~E~~ LAND USE: ....c:; ct-U . OF UNIT~' HANDICAP ACCESS: FLOOD PLAIN' ZONING: (If'./' QUAD AREA~ t\\){ i ') OCCY G RO U p' . OF STORIE~' CONSTR. TYPF' HEAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER' SQ, FT, $/SQ, FT, VALUE SQ, FTG MAl N X SQ, FTG ACCES~ x SQ, FTG OTHER X TOTAL VALUE OF PROJECT <~q~qoo -) PLAN CHECK FEE3~. 73' RCPT' DAT" BY 1 BUILDING PERMIT I fF~. S~ PLUMBING DEMOLITION , 15% Stale I -Z .i5:? 5% State h/f? "'--A' ~'.73 Surcharge Surchar~e" .. ~ 1 MECHANICAL 1 FENCE (fUO,V 0 \r)~~~0f- L\{ ).CO~ VALUE $ '15% State I" SIDEWALK . SUBTOTAL r <:19, "37.1 Surcharae FT, PERMITS 1 PAVING I CURBCUT SYSTEMS ,I FT, DEVELOPMENT . - I TOTAL PERMIT FEES EXCLUDING ELECTRICAl /~?/6 . REQUIRED INSPECTIONS ~.~..~ . . It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wilt be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all "inslab building service equipment, conduit, piping, accessories and other ancillary equi pment items are in place but before any concrete is placed. UNDERGROUND: Plumbing. electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or' floor sheathing. POST & BEAM: To be made prior to installation of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior 10 Installing any roof covering. FINAL PLUMBING x FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' J( B'~'"'' pLUMBING. (ELECTRIC~ IVU:.l,.;N~PIIL::AL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board interior wall covering is applied, ' FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel Is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S,1. (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: U,B,C, Standards 43,8, SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.S.C. STDS, 25,10,11), y STRUCTURAL MASONRY: (306 a,7) ,$~#~ ~ ~"*C;~. ".. '4~~ , . ,.- ~~~,~ *In addition to me Inspec- y~ tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. , j SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspectton. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. RECEIPT .' AMOUNT RECEIVED: 13"~. O;&., 7~4"< ./'} ~ PLANS REVIEWED BY r~~ /~9DATE 2~..:7C;- v By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield. and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. J further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during .C~s~tlon. ./7 /' ~~_ _ /J Signatur<;.ff~~k~~ Datp 1-21-93 DATE PAID' "< -/?-9?:!> RECEIVED BY: ~~. /' ' - VALIDATION: l