HomeMy WebLinkAboutPermit Mechanical 1996-5-28
COMM ERCI~L1IN DU;TRIA~
PERMIT APPLICATION
~
.-~
JOB NUMBER
~~:::>/?
~
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726.3769
OFFICE: 726,3759
ASSESSORS MAP:
LOCATION OF PROPOSED WORK' ..., '"1"":> )>.?/9/A/
_ ".. - , r
/")"'P? .'"3c:;-- '=3' ./
. -
-5Y'
TAX LOT'
//.P"7t::>?->
OWNER:
ADDRESS:
j)'-/~~~7?~L
I ' ,. -z;:lIL, ____
?/~_~/~~-'7 ~~'~:-;:/ . ,
Ec ~~~ STATE: ~
PHONE:~~:?~~
CITY:
ZIP' "'=7rYJ.:--;-
DESCRIPTION OF WORK:
NEW REMODEL
~
r/~./ -:-'--;-", ,
<.-/5'"~,1'="c./:~,.c-A-/;' ~~. /~/~
~ (I- Il..- - ~ ___. . _
L/,. e>i!!>
VALUE: ~,.......
DEMOLISH
OTHER
,1/ ADDITION
NAME
ADDRESS
PHONE
ARCHITECT:
CONTRACTOR'S NAME
ADDRESS
CONST.
.CONTRACTOR .
EXPI RES
PHONE
GENERAl'
PLUMBING:
MECHANICAL~E~,~.~
ELECTRICA' .
85.~5.V~~<:~/"Jz> .
Zi2-..:ffJf'e- .<9?~' ~/dCSI .(~~ ~ ';h-~
. - ~ , r _ _ ~ ,. __ _ _ _.
PLUMBING
NO, I FFE I r.HAP"O
Single Fixture
Relocated Bldg.
Inew fix, addll)
Water Service
Nn
2
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
MECHANICAL
I 000
tC.-
TOTAL PERMIT
TOTAL PERMIT
~#
I
"I:tARGi
J
I
I
I
I
I
I
I
I
S10.00 J
/~-I
It.
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duel
Vent System apart
from AC or hlg.
. Mechanical exhaust
hood and duct
Sanitary Sewer
II.
Storm Sewer
II.
Backflow Device
'..Permii Issuance
- OFFICE USE -
HANDICAP ACCESS:
QUAD AREA-
. OF BLDGS:
LAND USE:
FLOOO PLAIN'
. OF UNIT~'
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER'
OCCY GROUP:
CONSTR. TYpo.
. OF STORIES:
HEAT SOURCF'
SQ. FT.
SISQ. FT.
VALUE
SQ. FTG ACCESS
SO, FTG OTHER
x
*
SQ, FTG MAIN
x
x
TOTAL VALUE OF PROJECT
PLAN CHECK FEF
RCPT#
DATE
BY
I BUILDING PERMIT
15% State I
Surcharoe
I MECHA~
15% Stat/~: rl-I
Surcharoe 7?l
I PAVING ' I
PLUMBING
OEMOLlTION
5% State
Surcharoe
/V r- - FENCE
/~- VAltlF$
. . '~I SIDEWATj(- FT.
. , I CURBCUT
FT.
SUBTOTAL
PERMITS
SYSTEMS
OEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
26. 2-'
. REQUIRED INSPECTIONS .
It Is the responsIbility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION:To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches ,are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all Inslab building
service equl pment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete Is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer,. water and "
drainage 'lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing,
POST & BEAM: To be made
prior to Installation of floor
I nsulatlon, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
ROUGH PLUMBING,' :
ELECTRICAL & '
MECHANICAL: No work is to
be covered until these
Inspections have been made
and approved.
PAVING: After Qravel Is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner I Contractor during
con;:;truction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division,
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P,S,1. (306 a.1)
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL WELDS:
Performed on the job, (2722 f)
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a,6)
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied.
SPRAYED ON
FIREPROOFING: U.B,C.
Standards 43,8,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a,11 &
Chapter 29)
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is in
place but before any
plastering 15 applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
. Certificate by an approved
agency. furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25.10,11).
STRUCTURAL MASONRV: (306
a.7)
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material in
place.
*In addition to the Inspec-
tions specified, the Building
Official may make or require
lother inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
-------------------------------------------------------
FINAL ELECTRICAL
v
FINAL MECHANICAL
/"
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENT'"
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. .All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, eiectrlcal,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
PLANS REVIEWED BY
DAT~
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the BUilding Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street. that the permit card Is located at the front of the property, and the approved set of plans will remain on. the site at all
times during construction.
Slgnaturo ~ r
y
Date ~/ <If,.
'5'-<a-~
~,
~/
VALIDATION:
AMOUNT RECEIVED: -:z.e:::. ~~
2./6"$ ?
RECEIVED BY:
RECEIPT N:
DATE PAID: