Loading...
HomeMy WebLinkAboutPermit Building 2000-8-4 .,r SPRINQFlELD ~. . . "~j -);1 . . ,. I . Job# 00-00675-02 Page 1 of 3 ~ /-I/?O 4 Po. 15 ~~.iI--II:-d9i30 W-M,~ CITY OF SPRINGFIELD~ OREGON COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00675-02 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 500 Main St Spr Assessors Map#: 17033531 Lot: Block: Addition: Scope Of Work: Commercial former Gerlach building renovation Phase 1 permit to reconstruct mezzanine, shear walls and footing pads and construct two ornllnrl floor rAstronms. Contractor Emerald Empire Art Association 500 Main St, Springfield, OR 97477 C & SElectric Inc i~;dW18;~~I"'U'bYC-<9/'lJOO"4"'1Il::~ yu,; ".541-741-2236 Po Box 1482, Springfield, OR 97477-Q~icationCadtOPtedbytheOregOnUlilil' en er. Those rUles J Steve Keating .:~ OAR 952-001-0010 through O:~e settors~ 1-726-9995 188 West B Street, Springfield, OR 97~flP,'"YOU may obtain COpies of the9r52, "001, ca rnJltIle center (N u as b\. Tucker Plumbing Co numt1~J:l18Hhe0r9 ~l~ta'ephone 541-726-2192 2451 Clearvue, Springfield, OR 97477 C"nt".'~ '_Q~~~'l'l~~~~~lcatjon Owner: Address: Contractor Type General Contr Electrical Contr Engineer Plumbing Contr Quad Area: # Of Units: Constr. Type: Water Heater: Tax Lot #: 08100 Subdivision: Emerald Empire Art Association 500 Main St Phone Number: 541-746-5727 City/StatelZip: Springfield, OR 97477 Value: $50,000 Remodel Registration # Expiration Date Phone 541-746-5727 2CNWD Office Use Land Use: Other Professional Svc. Zoning Code: CC Bedrooms: Range: NOT'~f:. # Of Buildings: Occupancy Group: Heat Source: Sq. Footage: To request an inspection call the 24 hour recording arr26-3i7'6'9d1An;iI;\SlleClions,relluested before 7:00 a.m. will be made the same working day, inspectionsfreql!J~'li!,\!:~~'11IQ;(j6J.m.'Gm Ibe'li\~deCiliEilfollowing working day. COMMENC ut. fHISPERMITISNOT "n ~DOR'SA8ANDmll::nr=f"\'" Requlrea II1~P-"<i~9'l:~:1I0D. I Buildinll I -After trenches are excavated. - Before covering sheathing with finish materials. - Prior to cover. -Prior to taping. Footing Shear Wall Nailing Framing Drywall Hold Downs Installed Final Fire Final Building -When all Fire Department requirements have been met. -When all required inspections have been approved and the building is complete. ~/' Rough Electrical Final Electrical . . I Job# 00-00675-02 I Required Inspections Electrical Page 2 of 3 "Prior to cover. - When all electrical work is complete. I Plumbing -Prior to insulation or decking. - Prior to cover. -When all plumbing work is complete. Mechanical Underfloor Plumbing Rough Plumbing Final Plumbing Rough Mechanical Final Mechanical - Prior to cover. - When all mechanical work is complete. Zoning: CC FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2: Comments: Overlay District: Historic # of Street Trees: Land Use: Other Professional Svc. Pave Driveway? 0 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Planner: Urban Growth Boundary?D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Construction Types: Occupancy Groups: # Of Buildings: # Of Bedrooms: Handicap Access? 0 ,Area (Sq. Feet) I Main: Accessory: Fee Commercial Plan Check Total Plan Check Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Minimum Plumbing Permit Fee Number of Fixtures State Surcharge For Plumbing Permit Plumbing Administrative Fee Total Plumbing Flood Plain FEMA: # Of Stories: Current Units: Census Code: Does not apply Height (feet): Proposed Units: Total: Paid On Receipt# Plan Check 08/04/2000 2790 Value/Quantity 1 Fee Amount 50,000 $183.95 $183,95 Building 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 50,000 $283.00 $19.81 $8.49 $311.30 Plumbing 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 9 $.00 $90.00 $6.30 $2.70 $99,00 .. . Job# 00-00675-02 . Page 3 of 3 4'/' Fee Paid On Receipt# Mechanical 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 08/04/2000 2790 Value/Quantity Fee Amount Hood and Exhaust Minimum Mechanical Permit Mechanical Administrative Fee Vent Fan to One Duct Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical Grand Total 1 $4.50 $4.50 $.45 $6.00 $10.00 $1.05 $26.50 $620.75 2 Plan Check Type Checked By Date Completed Comment Initial Review-C/I/P Engineering-C/I/P Structural-C/I/P Fire Marshal-C/I/P Lisa Hopper Steve Templin Lorne Pleger AI Gerard 07/03/2000 08/03/2000 07/13/2000 07/13/2000 By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I further state that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that the project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. -f~ \1:L--e::...~~ n~-o'-\- 00 Signature Date