HomeMy WebLinkAboutPermit Building 2000-8-4
.,r
SPRINQFlELD
~.
.
. "~j -);1
. .
,. I
.
Job# 00-00675-02
Page 1 of 3
~ /-I/?O 4 Po. 15
~~.iI--II:-d9i30
W-M,~
CITY OF SPRINGFIELD~ OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-00675-02
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 500 Main St Spr
Assessors Map#: 17033531
Lot: Block: Addition:
Scope Of Work: Commercial
former Gerlach building renovation
Phase 1 permit to reconstruct mezzanine, shear walls and footing pads and construct two
ornllnrl floor rAstronms.
Contractor
Emerald Empire Art Association
500 Main St, Springfield, OR 97477
C & SElectric Inc i~;dW18;~~I"'U'bYC-<9/'lJOO"4"'1Il::~ yu,; ".541-741-2236
Po Box 1482, Springfield, OR 97477-Q~icationCadtOPtedbytheOregOnUlilil'
en er. Those rUles J
Steve Keating .:~ OAR 952-001-0010 through O:~e settors~ 1-726-9995
188 West B Street, Springfield, OR 97~flP,'"YOU may obtain COpies of the9r52, "001,
ca rnJltIle center (N u as b\.
Tucker Plumbing Co numt1~J:l18Hhe0r9 ~l~ta'ephone 541-726-2192
2451 Clearvue, Springfield, OR 97477 C"nt".'~ '_Q~~~'l'l~~~~~lcatjon
Owner:
Address:
Contractor Type
General Contr
Electrical Contr
Engineer
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Tax Lot #: 08100
Subdivision:
Emerald Empire Art Association
500 Main St
Phone Number: 541-746-5727
City/StatelZip:
Springfield, OR 97477
Value: $50,000
Remodel
Registration # Expiration Date
Phone
541-746-5727
2CNWD
Office Use
Land Use: Other Professional Svc.
Zoning Code: CC
Bedrooms:
Range: NOT'~f:.
# Of Buildings:
Occupancy Group:
Heat Source:
Sq. Footage:
To request an inspection call the 24 hour recording arr26-3i7'6'9d1An;iI;\SlleClions,relluested before 7:00
a.m. will be made the same working day, inspectionsfreql!J~'li!,\!:~~'11IQ;(j6J.m.'Gm Ibe'li\~deCiliEilfollowing
working day. COMMENC ut. fHISPERMITISNOT
"n ~DOR'SA8ANDmll::nr=f"\'"
Requlrea II1~P-"<i~9'l:~:1I0D.
I Buildinll I
-After trenches are excavated.
- Before covering sheathing with finish materials.
- Prior to cover.
-Prior to taping.
Footing
Shear Wall Nailing
Framing
Drywall
Hold Downs Installed
Final Fire
Final Building
-When all Fire Department requirements have been met.
-When all required inspections have been approved and the building is complete.
~/'
Rough Electrical
Final Electrical
.
.
I Job# 00-00675-02 I
Required Inspections
Electrical
Page 2 of 3
"Prior to cover.
- When all electrical work is complete.
I Plumbing
-Prior to insulation or decking.
- Prior to cover.
-When all plumbing work is complete.
Mechanical
Underfloor Plumbing
Rough Plumbing
Final Plumbing
Rough Mechanical
Final Mechanical
- Prior to cover.
- When all mechanical work is complete.
Zoning: CC
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2:
Comments:
Overlay District: Historic
# of Street Trees:
Land Use: Other Professional Svc.
Pave Driveway? 0
3:
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Planner:
Urban Growth Boundary?D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access? 0
,Area (Sq. Feet)
I Main: Accessory:
Fee
Commercial Plan Check
Total Plan Check
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge For Plumbing Permit
Plumbing Administrative Fee
Total Plumbing
Flood Plain FEMA:
# Of Stories:
Current Units:
Census Code: Does not apply
Height (feet):
Proposed Units:
Total:
Paid On Receipt#
Plan Check
08/04/2000 2790
Value/Quantity
1
Fee Amount
50,000
$183.95
$183,95
Building
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
50,000
$283.00
$19.81
$8.49
$311.30
Plumbing
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
9
$.00
$90.00
$6.30
$2.70
$99,00
..
.
Job# 00-00675-02
.
Page 3 of 3
4'/'
Fee
Paid On Receipt#
Mechanical
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
08/04/2000 2790
Value/Quantity
Fee Amount
Hood and Exhaust
Minimum Mechanical Permit
Mechanical Administrative Fee
Vent Fan to One Duct
Mechanical Issuance
State Surcharge For Mechanical Permit
Total Mechanical
Grand Total
1
$4.50
$4.50
$.45
$6.00
$10.00
$1.05
$26.50
$620.75
2
Plan Check Type
Checked By
Date Completed
Comment
Initial Review-C/I/P
Engineering-C/I/P
Structural-C/I/P
Fire Marshal-C/I/P
Lisa Hopper
Steve Templin
Lorne Pleger
AI Gerard
07/03/2000
08/03/2000
07/13/2000
07/13/2000
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon. I further state that only contractors and employees who are in compliance with
ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are
requested at the proper time, that the project address is readable from the street, that the permit card
is located at the front of the property, and the approved set of plans will remain on the site at all times
during construction.
-f~ \1:L--e::...~~ n~-o'-\- 00
Signature Date