Date: 719104
Subject: 229731' St. COM2004.00641
Attach8d Is the geotechnICal report for the subject address In AbJeslde Meadows for River Valley Builders.
Please call me W you have any questions.
Sincerely,
~
Michael Remboldt, P,E.
K & A Englneerl~, Inc.
Jul-09-2004 11 :15am Frcm-K & A En'lneerln., Int
+541-684-9358
T-640 P 002/006 F-469
} ,
Community ServIce.; 011/. Buildrng S.lfcty
CITY OF SPRINGFIELD, OREGON
22$ 51h Street, Sprrngfield. OR 97477 Ph. 726-3759
lob Address ??97 ~7:,"h. ~t .
Ciry Job # COM2Q04-0M41
,", , ," '" . . ",' " I' ,
, , ,
AMBLESIDE MEADOWS SUBDIVISION-1sT ADDITION
Site Investigation Questionnaire for Consulting Design Professionals
, toundation requirements - new structures on residential lots
This form may be used as a temporary verification to aDow construetJon to contJnue
OD the job site untO the consultant's stamped afftdavff9n the site soH compaction
and stabiUzation ,Is submitted to the City. ThJs form must be completed by a
Itcensed desJgn professional (engineer or architect) or hWher authorized employee,
and submitted to the building Inspector prior to requesting City Inspections or
placing foundation concrete. It is Important that aU questions be 8DSwered
completely for the foundation site to be approved for ccmtrumon.
Owner and/or Contractor Rtvar Va 11 e.v Bu; 1 de.JOs.
1. Date of the design professional's site evaluation? 61'29/04
2. Has the design professional reviewed a copy of the geotechnital information
for the subdivision that was provIded with the building permit? YeJ.2L No_
lf not) please contact this office for a copy of the report. The design professional
must be familiar with the geotechnical information before completing this form.
3. What was tile sfze and depth of the exc:avation and lor fW? _
Thel PYI""""tinn i'~.:lp.~~l"\v..iIr:l+lll ~idA,'1( Rnl deeD. benched intotne
wes't-fa.r.;'nl1 hi'llside.. ,The.. h1t1hes-t cut is apPr'oxfmatelv 10' into bedrock
alonQ -tile. east e.d~e. The foundati'on pad was e.xcavated rnto essentially
3 Qe~ch~' t~t ~~e. or1entea across tne slope. '
Was existing non-structural fill or expansive soil encountered on the lot?
Yes_ N~ If "yes", what types, depths and locations?
What measures were taken to remedy the soil condition (include type of
engineered fill used to stabilize the soil)? ~i 1 <l 1L.t.hp r.ut c()nsi ste.d
Af 1.0. to 1.5-fe.et of or9ani:c silt (toQs'o11l over weathered tuffaceous
s-i 1t~ navi'na ClDDroxilnate 1 y 20 to 30% of cobbles and boul ders.
1
Jul-09-Z004 !1:15am From-K & A Enllneerlni, In'
+541-684-9358
T-640 P 003/006 F-469
Communu)' ServIce.; D1II, Building SU1\:lY
CITY OF SPRINGFIELD, OREGON
225 ~Ih Suce\. Springlleld. OR 97477 Ph. 726.:\759
Job AddreSF 2297 37th St.
City Job 41 Cm12004-0064l
~(') ~ppdi'''1'' IlremadiAclI ar~ r~qlli"Qri Tn.. thic: 1"'t ntnlllr th;!n to
ensure ~tQbi1ity of the ba~t" This should consist of some sort
of retaining wall or reinforced slope system.
~ry thin lift of r.ru~hpd arqr~nat~ fill wa~ rtaced on the ~~ncbes (less
,than 4- ; nches)
Is the site as prepared adequate ~ inadequate 0 to maintain constant moisture
content in the sub grade? Note; Verification of moisture stabilization in the sub
grade is a requirement of the geotechnical report. and must be affirmed before
construction can continU8.
If inadequate) what measures are needed to provide constant moisture content in
the sub grade?
Is the site as prepared adequate U1 inadequate 0 to SUl'y....L the prVl'v.ted
structure? An affirmative answer is requisite to proceeding with construction.
If inadequate, what additional work is needed to provide adequate
foundation support? ' '
4. Did the design professional witness placement and compaction of the
enginc,;.:..,,;,d OU, or is there a special inspection report forthcoming fL. i I", a
qualified agency? I witnessed Placement 6 Special/nsp/compaction report 0
5. The design professtonalintends to use the following method for installation
of perforated perimeter footing draJns:
The design on the attached drawing provided by the de~ign professional ...... 0
The method shown on the original construction 'drawings...... ........... .'....... 0
The typical 'Foundation Drain' drawing attached to pennit ..... ................ ~
Perforated perimeter drai~s are not required ............... .................. ...... 0
Comments:
Note: City inspec~ors will inspect installed drains prior to cover upon request...
Call: 726-3769 to schedule inspection.
2
Jul-09-2004 11:16am Frcm-K & A En'lneerlng, Inc
+541-684-9358
T-640 P 004/006 F-469
Communi\y ScrvlI':C)., D1V, Building Solfeey
CITY OF SPRINGFIELD, OREGON
225 Sib S\r~l. Springfield, OR 97477 Ph. 726.3759
Job Address 2297 37th St.
City Job,. COM20Q4..0Q641
Low.point crawl space drains are required to prevent the build-up of excess
moisture Inside the foun4atlons during (and after) construction. This drain
may be Installed after foundation plat:ement smLv with the exDress uermissJQD
of ~e ~eBfm.prpfessioDaJ.
a. The design professional has determined the following:
The crawl space drain is required when thefoundoJion;s installed..... 0
The low-point drain can be installed after foundtlrion placement without a
significant moisture build-up problem within the foundation........... .. 0
(The low-point drain may be installed at the fram1'na stage
of construction) posr & beom.frORli"l. rooflng. 81r.'
b. Has the design professional observed and approved the installation of the
required low point drain?............ ...................... Yes, No ~v
if "yes", where is the low point drain located under the building and
where does it terminate at this time? (must be an apptoved location. i. e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.)
The design professional must de~...uuine whether th~ ~!,~I...,..ed pennit drawings have
adequate foundation steel. Is any additional foundation steel required that is not
shown on the foundation drawings for tbe building?
Yes No xx . q "yes II, describe additional steel required (or provide drawing).
The following sta,tement must be signed by the individual, doing the observations and
providing direction for the excavation and site preparation work on the property.
3
Jul-09-2004 11 :16am From-K & A Enllneerlni, Inc
,
+541-684-9358
T-640 P 005/006 F-469
Community Service... Dlv. Buildmg Safety
CITY OF SPRINGFIELD. OREGON
225 SllJ Street. Springlleld, OR 97477 Ph. 726.3759
lob Address. 2297 37th St.
City Job # COM2004-Q0641
The undersigned d,sirn professional (Dr tJUtluJrlt.ed emplo,ee) dIm that he/she
observed required moisture stability procedure, on this sile, tmtl tJuu such procedures
were accompli8hed before till, changes occIu76d. in the moisture content OjtllB sub-
gI'IIIle under lUJd tll'ound the building (where expansive soils were encountered). The
undersigned ftuthel' attests that the sub-grade, as prepared, is adetpUlte to support the
buildin, proposed/or this site.
Additional comments:
(Note): A copy oftbis report sball be kept on site with the approved plans at aU
times.
This report shall be followed by an affidavit. signed and stamped by the design
professional under whose auspices this report was completed) affirming the infonnation
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting li.:..uing inspection for the building.
Slgnature~ t~
Name Mi cbae 1 Rembo 1 dt ~ P .1: \
()oampany K & A Enqineerinq. Inc.
Phone 684-9.399
~
Title PI"e>lI:i 1lilnt
Licensee ~1chael R~mhn'rlt_ ~ ~
Ucense # 19474
exprres 12/31/20n4
The geotechnical report for the Ambleside Meadows - 1 sl Addition Subdivision
reco~nds immediate moisture stabilization of exposed expansive sub-grades. and that
expansive soils be over-excavated and replaced with at least 12 inches of fIll compacted
to at least 95% of ASTM 0698 for foundation preparation. The report also rec....uuuends
that measures be taken to prevent water i~VAU collecting in or around the foundation areas
during and after the construction process, aDd that positive site drainage be provided to
reduce the infiltration of surface water into the expansive soils.
The geotechnical report further emphasizes that the finish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, fim1lv
eomJ23Cted to reduce the infiltration of water at the surface. The adequacy of fill soil
material around the building must be verified to the satisfaction of the design
professional.
4
Jul-09-2004 11 :17am From-K & A Enilneerlni, Inc
+541-684-9358
1-640 P 006/006 F-469
Community Selvicc\ Div. 8uildmg S..f~ly
CITY OF SPRINGFfELD, OREGON
225 Slh SU-CCI. Springfil:Jd. OR 97477 Ph. 726-"75',1'
Job Address ~?q7 ~7th ~t__
City Job #; COM2004-0~641
Affidavit
For Site Investigatio~ Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1 St Addition
Subdivision
The undersigned hereby affmns that the excavation, structural fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my firm and that the following is true:
1. The foundation sub-grade is capable of supporting a minimum of 1509 psf, and is
adequate to support the building l"V1"osed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
prior to any significant change in moisture content of the sub-grade.
3. The site is adequately graded and drained to prevent the collection of water in the
excavated area during construction.
4. The accompanying repon titled "Site Investigation Questionnaire for Consulting
Design Professionals>J containing field observations and instructions made on
June. 29. 20Q4 .(date) for the building site was completed either by
myself or by an employee of my finn under my supervision. To the best of my
knowledge, the information contained in that report is complete and accurate.
Name of Licensed ~rofessional (print) t'lh:: bit@' n'i',"~ 7 ' 1t. ~ ~.
Signaror;. ~.
--r_~
~"t~
~
Date 7/9/2004