HomeMy WebLinkAboutItem 07 Proposed Resolution Setting Local and Regional Wastewater User Fees . AGENDA ITEM SUMMARY SPRINGFIELD CITY COUNCIL Meeting Date: Meeting Type: Department: Staff Contact: Phone: Estimated Time: June 2, 2008 Regular Session Public Works e~ Susie Smith q)'7 726-3697 10 Minutes ITEM TITLE: PROPOSED RESOLUTION SETTING LOCAL AND REGIONAL WASTEWATER USER FEES 1) Conduct a public hearing on local and regional wastewater user fees. 2) Consider adopting A RESOLUTION OF THE CITY OF SPRINGFIELD COMMON COUNCIL SETTING LOCAL AND . REGIONAL SEWER USER FEES AS SET FORTH IN THE SPRINGFIELD MUNICIPAL CODE. ACTION REQUESTED: ISSUE STATEMENT: At current rates, the local and regional wastewater user fees will not produce sufficient revenue to fully fund the proposed fiscal year (FY) 08- 09 budgets for these funds. Council action is needed to establish new rates for FY 08-09. ATTACHMENTS: Attachment A - Resolution establishing a schedule of local and regional wastewater user fees. Attachment B - Council Briefmg Memorandum reviewed by the Council at its May 12,2008 work session. Each year, the City Council reviews and establishes the rates for local wastewater user fees. These rates are established to provide adequate revenue to fund operation and maintenance (O&M) of Springfield's sanitary sewer system, and a portion of the Capital Improvement Program (CIP). The Council also adopts the user fees set by the Metropolitan Wastewater Management Commission (MWMC) for the Regional Wastewater Program. The City Council reviewed options for a proposed local wastewater user fee increase at its May 12,2008 work session. At that time, the Council directed staff to prepare a schedule of user charges for a public hearing on June 2nd, based on a 12.5% increase in the local wastewater user fees. ill addition, the Council was informed that the MwMc adopted an 11 % increase in regional wastewater user fees that also needs to be incorporated into the schedule of user charges for FY 08-09. The Council Briefing Memorandum reviewed at the May 12th work session is provided as Attachment B for additional background and reference. Stormwater user fee rates will be addressed at a later time. DISCUSSION: Attachment A, a resolution establishing the local and regional wastewater user fees for FY 98-09, is provided for Council consideration. It is requested that the Council consider acting on the resolution following the public hearing. ' V:\ENVIROSV\BUDGET09\RATES 6-2-08 ~IS.DOC RESOLUTION NO. A RESOLUTION OF THE CITY OF SPRINGFIELD COMMON COUNCIL SETTING LOCAL AND REGIONAL SEWER USER FEES AS SET FORTH IN THE SPRINGFIELD MUNICIPAL CODE. WHEREAS, the City of Springfield has established a wastewater system; and WHEREAS, under the Intergovernmental Agreement (IGA) entered into by the City of Springfield, the City of Eugene and Lane County in February, 1977, and as subsequently amended, the Metropolitan Wastewater Management Commission (fv1WMC) constructs, operates, and maintains the regional sewerage facilities, as described in. the IGA; and WHEREAS, the costs related to operation, maintenance and certain capital improvements of the local and regional sanitary sewer systems are funded through user fees; and WHEREAS, Sections 4.206 (3) and 4.208 (2) (a) (i) and (ii) of the Springfield Municipal Code authorize the setting of sewer charges by resolution of the Council; and WHEREAS, the MWMC approved Resolution 08-06, adopting the Regional Wastewater Program Budget and Capital Improvements Program for fiscal year (FY) 2008-2009, and Resolution 08-07, adopting a new schedule of user fees for FY 08-09 operations and capital programs, on March 27, 2008, after reviewing the proposed Resolutions in a series of public meetings and public hearings; and WHEREAS, Section 8(c) of the MWMC IGA obligates the City to "adopt user charges required by 40 CFR 35.929 in an amount not less than adopted by the Commission"; and WHEREAS, the schedule of sewer user fees, attached as Exhibit "A," and incorporated herein, is needed to collect revenues necessary to fund the operations, maintenance and certain capital improvements of the local a~d regional sanitary sewer system in FY 08-09. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Springfield as follows: . 1) The City of Springfield Schedule of Sewer User Charges, which is attached as Exhibit l'A," is hereby adopted and shaH take effect with bills rendered on or after July 1,2008. 2) This resolution shall take effect immediately upon adoption by the Council and signature by the Mayor. Adopted. by the Common Council of the City of Springfield this day of June, 2008. Mayor . ~~ E~~.l~ ~?~ r:.?ft~i(~vErJ ATTEST: Amy Sowa, City Recorder A t-.: -;- .r\ :~: ;'1 '.::. ~ u . ;\1\ \ ~~~~_.._.~_ L~~ DATE: --~..L..~ \ C;) ~ OFFICE C:iT'{ PITORNEY Attachment A Page 1 of2 Exhibit A Wastewater (Sanitary): i Beginning with bills rendered on or after July 1, 2008 sanitary sewer charges shall be as follows: Local Regional Total Base Charge n/a $7.910 $7.910 Volume Charge Per Unit Residential $2.228 $1. 1 77 $3.405 Low Strength $2.228 $1.581 $3.809 Medium Strength $2.228 $2.305 $4.533 High Strength $2.228 $3.270 $5.498 Very High Strength $2.228 $4.237 $6.465 Super High Strength $2.228 $ 5.2 04 $7.432 Attachment A Page 2 of2 i M E M 0 RAN DUM CitJ1 of Springfield Date: May 8, 2008 I I To: . Gino Grimaldi, City Manag~r COUNCIL From: Dan Brown, Public Works Director Q~ BRIE~G Susie Smith, Environmental Services Manager $ I. Subject: FY 08-09 Wastewater User Fees l\1EMO~UM ISSUE: Wastewater and stormwater user fees are reviewed and updated by the City Council annually. This process occurs in conjunction with. adoption of the budget and Capital Improvements . Program (CIP) to ensure revenue adequacy. The Council also adopts the regional wastewater user fees set annually by the Metropolitan Wastewater Management Commission (MWMC). At its April 7th meeting, the Council reviewed the fiscal year (FY) 08-09 regional wastewater user fees, and was given a preview of the future revenue requirements that Will require user rate actions in the local wastewater and stormwater programs. Tills memo and the upcoming May 12th work session are intended to focus only on the local wastewater user rates, drivers of revenue requirements projected for FY 08-09, and options for Council consideration. This memo also addresses issues and questions that were raised by councilors at the April 7th work session. Information regarding the FY08-09 M\VMC regional wastewater fees adopted byMWMC was provided in detail at.othe COID+cil's April 7th work session and is not repeated here. At the Council's May 12th work session, staffwill seek Council direction for preparation of a schedule of wastewater user fees for Council consideration following a public hearing on June 2nd. The proposed FY 08-09 budget and revenue projections assume a July 1 st effective date for new rates. Stormwater user rates will be scheduled for Council consid~ration later this spring. Formulation of stormwater revenue requirements and rate options cannot be completed until we have a draft of the updated Stormwater Facilities Master Plan, which is anticipated in June. I I BACKGRO~: . .. I Each year, the Clty develops a ClP and operating budget for the local wastewater program. The CIP, operating budget, debt service obligations, and reserve levels established by the City Council determine the annual funding requirements. The primary fundmg sources include wastewater user fees (for operating and capital expenses) and ?ystem ~evelopment charges . (SDCs) (for qualifying capital expenses only). In addition to the local fees, the total wastewater user fees include regional charges established by the MWMC to fund ti.J.e Regional Wastewater Program. The Cities of Springfield .and Eugene annually implement tlie MWMC user charges consistent with the MWM:C intergovernmental agreement (IGA). Descriptions of each of the utility systems are provided below. : ! I LOCAL W ASTEW A ~ER SYSTEM: .. i . The. wastewater (or samtary) system servmg Spnngfield has two parts: a local collectIon system and a regional conveyance and treatment/disposal system. The local s~stem is made up of more . I i Attachment B 1 of 15 than 200 miles of collector pipes and 17 pump stations~ It is owned and operated by the City of Springfield. Operation and maintenance (O&M) of the local collection system is funded entirely by revenue from local sewer user fees. User fees also are currently the primary source of funding for the local CIP, which provides for system preservation, major rehabilitation, and expansion to support community growth. . REGIONAL WASTEWATER SYSTEM: The Regional (MWMC) wastewater system is comprised of numerous treafinent facilities and a conveyance system owned by the MWMC, as described in the MWMC IGA. The primary Regional Wastewater Facilities include the Water Pollution Control Facility (WPCF), the Biosolids Management Facility (BlVlF), Biocycle Farm, the residuals Beneficial Reuse Site, several maj or pump stations and associated conveyances, and the large interceptor ("East Bank") that carries Springfield's wastewater to the WPCF. Regional system O&M, provided by the City of Eugene, is funded entirely by revenue from regional wastewater user fees. MWMC administration and the Springfield Industrial Pretreatment Program, both of which are integral parts of the Springfield Public Works and Finance Departments, also are funded through regional wastewater user fees. Regional user fees also fund a significant portion of the MWMC CIP in addition to regional SDCs. LOCAL WASTEWATER PROGRAM FUNDING AND USER RATE mSTORY: Like the wastewater collection and treatment system itself, the wastewater user fees appearing on customers' monthly bills have a local (Springfield) and a regional (MWMC) component. In FY 07-08, based on a typical residential household using 5,000 gallons per month, the current local wastewater fee is $13.24, and the regional fee is $14.22. The current combined typical, residential wastewater bill for Springfield residents ~s $27.46. Residential customer bills are used as a benchmark for sewer rates because the volume and strength of the wastewater generated is similar within the customer class. The usage, and therefore the bills, of commercial and industrial users vary dramatically because their wastewater volume and strength vary greatly. However, to give the Council some examples, a typical bill for one of the major industries in Springfield that generates about 900,000 gallons of "super high" strength wastewater is about $2,350. For a large grocery store generating about 140,000 gallons of "medium" strength wastewater, the typical monthly bill is about $366. Figure A below shows the trends (i:e. increases) in the local and regional user fees over the last several years. Prior to this trend, rates were stable, and the MWMC rates were stable for a long period of time (with no increases since 1996) prior to the annual increases that began in 2003. The annual MWMC user rates occurring since 2003, and projected in future years, are driven primarily by: 1) lost revenue from mdustry shut downs and other reductions in customer usage; 2) inflation; and 3) the 2004 Facilities Plan capital projects, which are intended to extend the effective life of the treatment plant through 2025. Attachment B 2 of 15 Figure A Springfield Monthly Regional & Local Residential* Wastewater Bill Historical Trend $30.00 ----- . . $25.00 ; [J Regional [J Local ---.-..--.----. 'V , M N $20.00 - , M :, 't"" 'V ct) - - -. ... .. -. ex> ~ N T"" " 1.0 LO CD .' 0 't"" 't"" Ett7 $15.00 'r"'" 't"" 1.0 't"" Ett7 0 't"" 6'7 .. - .. 0 0 ., 6'7 .. ~: 1 .' .. .. 'r"'" 't"" 't"" .. .- .. .- .~ ",..:5 $10.00 ; Ett7 Er7 ~.. 6'7 ~. i,: .)~ ~. 1.0 ". N _. - .. - - ex> of, CD ~~. ~: 't"" " ~( N .~: '".:0;. :f, ~..- ;1;. C"! ~ ;:~ .:-~.~. ~ M M .'Ij (J) ~' .~ ct) . ':'.:,- ':~ $5.00 -':? . tq LO ~~ ;.~~ 0 .c: -r.~ 't"" .~- 'r"'" ::1 ,] ~\ 't"" C;~ '~ 0) 51 't"" 't"" Er7 cO :~. ,;',l:: i . ~', 't"" 6'7 ';:ii, CO ::.~( ",::'1'1 ~,. Er7 {f: 6'7 ... :'~:5 6'7 ;S; Er7 6'7 . :<:.;;; '?}:' 'l;~ i;~ $0.00 ,~. . . , :' .:;.,. . .:\: , , 01/02 02103 03/04 04/05 05/06 06/07 07/08 01/02 02/03 03/04 04/05 05/06 06/07 07/08 $8.53 $8.53 $9.09 $11.28 $11.96 $13.15 $14.22 $10.15 $10.15 $10.56 $10.83 $11.61 $12.43 $13.24 .$18:69 ~. . $18.69 $19.65 $22.11 ., . $23.57 ........$25.58 ... $27.45 . . . I . $0.00 I .$0.971 $2.461. $1.461 $2.011 .,. $1.871 01/02 02/03 03/04 04/05 05/06 06/07 07/08 00/0 7% 24010 6010 1 00/0 8% 00/0 4% 3% 70/0 7% 60/0 '.0% 50/0 12% .7% 9010 70/0 * Residential based on average customer using 5,000 gallons per month For Springfield's local wastewater program, the current user rates are projected to generate about $4.3 million during the current fiscal year. Current SDCs are projected to generate about $230,000 for capital projects in the current fiscal year. For years, the Council has dedicated a significant portion of user fee revenues to the CIP. In recent years, the annual user rate contribution to the capital program has been about $1.4 million, along with about $660,000 in annual debt service payments. In FY 07-08, the wastewater CIP is funded about 30% through SDCs and about 70% through user rates. Exhibit 1 shows the projected future allocation of the ,average residential bill t6 operations and capital programs (under the Option 1 rate scenario described below). As the revenue requirements of the capital program continue to place upward pressure on user rates, Springfield's wastewater rates are approaching the average of residential user rates among the Oregon cities we survey annually. A review and update to the local wastewater SDC methodology is currently underway. This process will provide the Council with the opportunity to provide policy direction regarding the balance of user rate funding vs. SDC funding for capital projects. A shift toward increased capital cost recovery to SDCs would reduce that portion of the user's bill dedicated to capital proJects in future years. PREVIOUS COUNCIL ACTIONS: In reviewing the FY 07-08 local wastewater program funding requirements and options last year at this,tirne, the Council committed to fund the projects in the adopted five-year ClP. With this Attachment B 3 of 15 action, the Council recognized that $8 million to $10 million would need to be borrowed just to fund the Jasper Road Trunk Sewer project. To fund operating and capital requirements in FY 07 -08, the Council increased user fees by 6% and anticipated subsequent increases of 6% to 6.5% for multiple years. The Council also directed staff to update the SDC methodology with an eye toward increasing SDC cost recovery for capital projects. This process is underway, and staff ~ticipates forwarding the results of this study and new SDC ra~es to Council by October, 2008. Finally, the Council directed staff to develop a Capital Financing Plan once the Wastewater Facilities Master Plan (Master Plan) update is completed. The draft Master Plan is now complete and is scheduled for City Council review in June. The current CIP includes the following projects and amounts that have been identified for the five-year period ofFY 08-09 through FY 12-13. Funding is available for all of these projects except for the Jasper Trunk Sewer under the current user rate and SDC structure. Local Wastewater Five-Year Adopted CIP (FY 08-09 throu2h FY 12-13) CIP Project/Category . Project Cost Sewer System Rehabilitation (WWFMP) $ 6,686,000 Gray Jacqua Infrastructure $ 430,000 Jasper Trunk Sewer $11,500,000* Existing Debt Service (five years) $ 3,081,000 Five- Year Total $21,697,000 Note *: Not funded under current user rates or SDCs. CURRENT/FUTURE FUNDING NEEDS AND RATE OPTIONS: Without a current Master Plan for many years, the wastewater CIP has been limited mostly to: 1) addressing City Council objectives for community growth; and 2) sewer rehabilitation to eliminate sewage overflows through implementation of the Wet Weather Flow Management Plan (WWFMP). In the foreseeable future, funding requirements in the local wastewater program will be driven by the updated Master Plan funding needs. The draft Master Plan identifies $39 million (in 2008 dollars) in capital projects over the period ofFY 08-09 through FY 19-20 in addition to the $21,697,000 (in 2008 dollars) of projects included in the current adopted CIP (shown above). Of the $39 million identified through 2020, almost $37 million is needed in the fITst five years. This is due to the aging nature of the existing collection system, which must be rehabilitated in order to avoid sewage overflows onto streets and private properties and into waterways. The new projects also include work to expand capacity in the existing collection system to address growth that has occurred, and to extend sewers to newly developing areas. The table below shows the types and .costs of projects identified in the Master Plan over the next five years. Attachment B 4 of 15 Local Wastewater Facilities Master Plan New CIP Proiects (FY 08:-09 throueh FY 12-13) I CIP Project/Category Project Cost i I Mandatory Sewer System Rehabilitation $26,501,000 I I System Expansion for Growth $ 5,81"6,000 : , Glenwood System Expansion* $ 4,441,000* I I Five-Year Total $36,758,000 I Note * : To be funded by other sources. , I I I The total five-year unfunded capital project needs under current user rat~sand SDCs equate to almost $30.1 million in newly identified rehab and development-driven :expansion, plus the $11.5 million Jasper Trunk Sewer that is in the adopted CIP. The local rastewater capital reserves have been depleted, and the City will need to fmance capital prpjects through borrowing for the foreseeable future. ! i CAPITAL PROJECT FUNDING AND WASTEWATER USER FEE OPTIONS: To give the Council options and flexibility regarding user rates, staffha~ divided the current .and future wastewater capital projects into two categories. The fIrst category includes projects that are already included in the CIP and. additional mandatory sewer rehabiH;tation work identified in the draft Master Plan as needed to avoid sewage overflows. The other Qategory includes . discretionary projects the Council may chose to pursue to facilitate timely extension of services for community growth. Exhibit 2 shows a description and estimated tinillng of the projects and the annual cash flow requirements that would be associated with the two proj ect categories. The .options for funding the identified wastewater CIP proj ects, and the corr~sponding user fee rate actions for FY 08-09 are discussed below. ' OPTION 1: i Option one would provide funding ONLY for the mandatory sewer rehabilitation work (i.e. $33 , I million) and the projects included in the adopted CIP (i.e. $11.5 million' Jasper Trunk Sewer and the infrastructure for the Gray Jacqua development area). This option would enable the Glenwood System Expansion projects to be completed if they can be fullded through urban renewal or,other funding sources. Other discretionary projects would qe deferred until and unless viable alternative funding sources could be identified. Under thi~ bare-bones scenario, significant borrowing will need to occur over the next five years, with approximately $20 million occurring in FY 08-09. (Refer to Exhibit 2 for the cash flow requiremep.ts that would be met through borrowing.) Exhibit 3 shows the historical and projected comb,ined local and regional wastewater fees under this option. I I This scenario is based on the following rate, revenue and operational as:sumptions. The local user fees would need to increase $1.31 per month on the average residehtial monthly bill (a 10% increase in FY 08-09), and a similar amount for each of the next five y~ars. The local wastewater SDC charges, under the currently adopted methodology, will increase from $1,086 to I $2,025 for an average single family residence based on a new Master Plan project list that includes all of the SDC el~gible pr~jects. Also, SDC revenues will onl~ me.et projected need if . the level of new constructIon remams stable. Through the process of updatmg the SDC methodology over the next six months, the Council may have some pollcy flexibility to shift a greater portion of capital costs to the SDCs. This would enable the CoJncil to reduce the I . i I I ! i I ! i ! Attachment B 5 of 15 projected user rate increases in years two through five. Finally, this rate option does NOT anticipate the addition of any incr~ased staff or other operational costs beyond approximately 3 % per year for inflation. The accelerated work schedule for mandatory work will require increased use of contractual engineering services, and the increased system operations and maintenance requirements will necessitate increasing Maintenance Division staff at some point. OPTION 2: Option 2 would enable construction of all of the projects on the adopted five-year CIP, the mandatory sewer rehabilitation projects and the discretionary projects the Council may chose to pursue to facilitate timely extension of services for community growth as anticipated in the new ~ Master Plan (shown in the table below and in Exhibit 2). This option would require a greater commitment to borrowing over five years, and the resulting user fee increase for FY 08-09 would b~ $2.86 per month on an average residential bill. .All of the other user rate, SDC and operational assumptions described in Option 1 also apply to this optio~. Development Driven System Expansion Project Cost Peacehealth Riverbend Pump Station $3,200,000 McKenzie Highway Sewer Extension . $1,616,000 Local Sewer Extensions to New Areas $1,00.0,000 Five- Year Total $5,816,000 OPTION 3: The Council could elect to establish a user rate (between the Option 1 and Option 2 levels) and include CIP fundi!Lg for a set amount of capital proj ect expenditures, and leave the determination of project priorities and timing for a later date. This option would provide the Council with flexibility to respond to development opportunities without committing prematurely to any specific proj ects. Based on the SDC rate and revenue assumptions described under Option 1, the user rates under Option 3 would need to be increased an additional $.33 per month (i.e., 2.5(10) for each $1 million in capital projects the Council may wish to fund. In addition to the projects included in Option 1, the projects that would be anticipated for Council consideration, totaling $5,816,000 (in 2008 dollars) over five years, are shown above. If the Council establishes some level of funding available for a future Council priority, there may be opportunities, such as a reimbursement district, that could provide for additional developer participation in the project costs. FIVE- YEAR RATE IMP ACTS: The five-year summary of Options 1 and 2 is shown on the table below. Exhibit 3 provides graphs that show the five-year projections for the combined regional and local wastewater user fees. o f 1 FY 08 09 FY 09 10 FY 10 11 FY 11 12 FY 12 13 'p1lon - - - - - Proposed Rate $1.31 $1.46 $1.60 $1.76 $1.94 Increase * (10%) (10%) (10%) (10%) (10%) Projected Revenues User Fees** $5,000,000 $5,556,000 $6,143,000 $6,791,000 $7,509,000 SDCs $482,000 $487,000 $492,000 $497,000 $502,000 Attachment B 6 of 15 o f 2 FY 08 09 FY 0910 FY 10 11 FY 11 12 FY 12 13 'p110n - - - - - Proposed Rate '$2.86 $3.59 $0.59 $0.61 $0.63 Increase* (21.7%) (22.3%) (3.0%) (3.0% ) (3%) Proiected Revenues User Fees** $5,519,000 $6,783,000 $7,112,000 $7,362,000 $7,621,000 SDCs $482,000 $487,000 $492,000 $497,000 $502,000 Notes *: Based on average residential customer using 5,000 gallons per month **: In~ludes 1 % projected growth in volume from new customers. COMPARISON OF WASTEWATER USER FEES TO OTHER OREGON CITIES: Each year, staffupdates a survey of user fees and SDCs anticipated for the upcoming fiscal year in order to "benchmark" Springfield's program costs to those of other similar communities. Figure B below shows a sample of communities for which anticipated FY 08-09 data was available. It should be noted that at the time of this survey, not all of the cities had finalized user rates for the upcoming year, so some of the user rates may be higher effective July 1 st than indicated below. For the purposes of estimating Springfield wastewater user "fees, staff assumed the adoption of a $1.31 (10%) increase in the local wastewater fee (Option 1) in addition to the $1.55 (11 %) regional wastewater fee increase adopted by MWMC. The combined monthly increase on the average residential bill, assuming 5,000 gallons of usage a month would be about $2.86. This - information is also shown graphically in Exhibit 4, which includes a graph showing a comparison of all SDCs (including wastewater, stormwater, transportation, parks, and water) for each city. ~~;~:~7';~;:.,: Figure B . Average Residential Wastewater Bill/mo. * $35.29 $29~89 $25.18 $27.42 $43.00 $22.61 $24.63 $45.65 $38.81 $37.72 ". '\i""(ff''''.'' , :. },j j.J!.ar,'. $42.00 $23.54 $32.4 7 Residential (2,400 sq ft) Wastewater SDC $2,376 $2,800 $2,038 $4,171 . $4,896 $1,627 $4,923 $2,870 $3,258 $2,804 ~~: $3,250 $2,632 $4.1 53 City Albany Beaverton Bend Corvallis Creswell Eugene Gresham McMinnville Portland Salem Veneta . West Linn Wilsonville I i *Note: Based on typicalresidential usage of 5,000 gallons per rhonth. The average residential bill of all cities surveyed is $32.69, which is about $2.37 higher than Springfield's estimated average bill (including a 10% local rate increas~). The average I Attachment B 7 of 15 wastewater.SDCs for the surveyed cities is projected to be $3,083, which is about $38 lower than Springfield's projected rate for FY 08-09. OTHER LOCAL WASTEWATER FUNDING CONSIDERATIONS: At the April 7tt1 City Council work session, councilors requested that staff return with an assessment of the potential for other types of fees or .charges that could bear some portion of the local wastewater costs in order to shift some of the burden away from user fees and SDCs. A request also was made to return with information about how the Council might provide . consideration to 19W income and fixed income sewer customers. Initial responses to these considerations are provided below. ALTERNATIVE FUNDING SOURCES: Throughout the State of Oregon, the vast majority of sewer utility expenses are now covered through user rates and SDCs. In preparing the 2005 Financial Plan for the Regional Wastewater Program, staff and the MWMC fmancial advisor conducted a comprehensive evaluation of funding and fmancing mechanisms to support wastewater capital programs: From this research, the Financial Plan concludes that, without the benefit ofgrants and or internal transfers from other funds, user fees and SDCs will be the primary source of revenue for wastewater utilities state wide. The most economically strategic fmancing tools appear to be State Revolving Fund loans and revenue bonds. When the original treatment plants were constructed in the 1970s and 1980s, with about 80% federal grant funding, some communities, like Eugene-Springfield, funded the local match to the grants with General Obligation (GO) Bonds, which were repaid through property taxes. Among the reasons communities no longer tend to fund wastewater improvements with GO bonds is to reserve property taxes and bonding for other community priorities that do not have user rates and SDCs as a funding option. The Council could choose to put the discretionary development- driven capital projects on a future ballot. However, the mandatory sewer rehabilitation projects are not suitable for GO bond funding for three reasons: 1) we are on a short time line for securing the funding and completing the projects to avoid sewage overflows; 2) the projects are not discretionary; and 3) the required amount of funds is large and may compromise the Council's ability to pass other priority ballot measures. Reimbursement Districts, which have been a recent topic of discussion by the City Council, provide another funding tool that could be used in the future by the Council, particularly for development driven discretionary projects. However, they do not provide 'a ready alternative that can be applied to the mandatory sewer rehabilitation projects (included in Option 1). The City of Ashland dedicates a significant portion of a special restaurant tax to fund a portion of the wastewater utility. We are not aware of any other community in Oregon that funds wastewater programs in this manner. If the Council wishes to pursue this type of a fee to support wastewater capital programs, staff would need to return. to Council with a work plan, scope and cost of a project to develop this type of fee for Council consideration. Staff is not aware of other'viable wastewater funding strategies. However, additional research could be conducted in the context of the Capital Financing Plan development. Attachment B 8 of 15 RELIEF FOR LOW-INCOME AND FIXED-INCOME CUSTOl\fflRS In our annual survey of wastewater utilities throughout the state, we havp not identified any communities that have a low-income wastewater subsidy or reduced rat~ program. Therefore, we do not l?ave a model that we could rea'dily apply to Springfield. Dev~lopment and administration of a reduced rate for low-income customers as ~ part of S!pringfield's rate structure would, at a minimum, entail the following: I. 1) An updated rate study completed by a consultant, which would include an analysis of how much of the wastew.ater utility revenue requirement wouid ~e shifted from low- income customers to other customers, and how it would be distri;buted; 2) Development of a program, which may require additional staff or consultants, to determine criteria for apprqval of low-income status customers, ~o review customer information for proof of low-income status, and to administer the rate program; 3) Additional contractual services with the Springfield Utility Boar~ to assign special rate categories to customer accounts upon request; and i 4) A program to track the status and accounts of qualifying custom~rs on an ongoing basis~ I Staff has not evaluated the costs of developing a low-income program. Jf the Council wishes to pursue a low income rate, additional contractual services would need to !be included in the FY 08~09 budget. These operational costs would need to be added to the rate model to determine the rate impact of additional program expenditUres. Implementation of such a program would not occur at least until FY 09-10. : As a side note, unlike energy costs that can often be higher for !ow-incobe customers due to uninsulated housing, wastewater bills are likely to be lower than the av~rage residential usage which is typically used as a benchmark. Although not insignificant, the!relative impact of the fee . I increases would be less for those with less water consumption. ! i RECOMMENDATIONS AND REQUESTED ACTION: ! . As described above, staff has evaluated the funding requirements assoc~ated with the proposed FY 08-09 budget and the adopted FY 08-09 CIP for the local wastewat~r program, as well as the new project list in the draft Wastewater-Facilities Master Plan. Given the level of investment the City needs to make in wastewater infrastructure, funding requirements datmot be met without increaSing user fees in each of the next five years. Staff recommends Option 3, with a baseline increase of 10% plus a 2.510 increase to establish the ability to fund an additional $1 million in discretionary capital projects to be determined by the Council at a later date. This will provide the Council with the flexibilitY to fund one or more capital projects needed to support the development of areas not currentlf served by wastewater infrastructure. This recommendation equates to a 12.5% rate increase, Which would amount to $1.65 on an average residential bill over FY 07-08 rates. I Regardless of which option is selected by the Council, additional rate increases will be needed over the next five years in order to fund the increasing level of debt serlice and reserves necessary to finance the projects. With the completion of the Master Plb, staff will have the tools needed to complete a longer term capital fmancing plan and revisibns to the SDC methodology in FY 08-09. Attachment B 9 of 15 Staff requests that the Council select one of the options described in this memo and direct staff to prepare a draft schedule of local and regional wastewater fees, which will include the MWMC- adopted rates for FY 08-09 and the Council's selected local wastewater user fee option. The draft schedule of wastewater fees will be reviewed and considered at a public hearing, which is scheduled for June 2nd. . Attachment B 10 of 15 Exhibit 1 Average User Local Residential Bill Allocation to Operatipns Projected Trend using Option #1 I [J Operations [J Capital I $25.00 $20.00 $15.00 $10.00 $5.00 6.27 6.33 6.41 $0.00 2009 .2010 2011 6.51 6.66 ~012 2013 Service 2009 I 2010 I 2011 I :2012 I 2013 Operations 6.27 6.33 6.41 6.51 6.66 :;'ea:pital~;:t:t;;.;"S<{;,:)(:i:.::~\.. 8.28 9.68 1 1.20 12.86 14.65 Total 14.551 16.01 17.61 I 19.371 21.31 * Assumes Local increase by 10010 per year ** Rounding of % increase causes slight adjustments to Total numbers Updated 5/8/2008 Attachment B 11 of 15 Local Wastewater Capital Improvement Project Phasing and Cash Flow - Option #1 Proiect/Y ear Total 08/09 I 09/1 0 I 10/11 I 11/12 I 12/13 Mandated* 33,501,000 8,500,000 2,000,000 8,135,000' 4,773,000 3,093,000 Already Approved** 11,930,000 4,130,000 7,800,000 0 0 0 Discretionary*** 12,815,900 01 0 0 0 5,815,900 Total 58,246,900 12,630,0001 9,800,000 I 8,135,0001 4,773,0001 . 8,908,900 "Mandated Wet Weather Flow Management Plan (WWFMP) and Sanitary Sewer Overflow (SSO) projects .... Already Approved in FY '07-08 and FY '08-09 C IP ...... Master Plan Projects as identified by CH2M Hill draft local Wastewater Master Plan P rojectIY ear Total 08/09 I 09/10 I 10/11 I 11/12 I 12/13 Remaining WWFMP Work 8,500,000 8,500,000 Basin 22 Rehab 6,200,000 2,000,000 4,200,000 10th & N Street Upgrade (proj #1) 3,935,000 3,935,000 58th Street Bypass (proj #9) 2,195,000 2,195,000 9th Street Sewer Upgrade (proj #2) 476,000 476,000 Main 5t Improvements # 1 (proj #10) . 2,102,000 2,102,000 Main 5t Improvements # 2 (proj #13) 1,145,000 1,145-,000 A Street Improvements # 1 (proj #11) 539,000 539,000 A Street Improvements # 2 (Proj #12) .246,000 .. . 246,000 A Street Improvements # 3 (Proj #14) 163,000 . . .163,000 Misc Rehab 8,000,000 ' .1,000,000 Jasper Road 11,500,000 4,000,000 7,500,000 . Gray Jaqua 430,000 130,000 300,OOQ PeaceHealth Riverbend PS 3,189,900 3,189,900 McKenzie Hwy 1.626,000 1,626,000 Local Sewer Extensions 8,000,000 1,000,000 Franklin Exp****. 2,998,000 2,998,000 Nugget Way PS**** 1,443,000 1,443,000 Totals 58,246,900 12,630,0001 9,800,0001 8,135,0001 4,773,0001 8,908,900 Note- Project estimates in 2008 dollars *...... Not counted in Total-Funded through other sources \ Local Wastewater Capital Improvement Project Phasing and Cash Flow - Option #2 Proiect/Y ear Total 08/09 I 09/10 I 10/11 I 11/12 I 12/13 Mandated* 36,301,000 8,500,000 9,935,000 5;773,000 2,145,000 1,948,000 Already Approved** 11,930,000 4,130,000 7,800,000 0 0 0 Discretionary*** 12,815,900 0 0 0 4,815,900 1,000,000 Total 61,046,900 12,630,000 I 17,735,000 I 5,77:3,0001 6,960,900 I 2,948,000 *MandatedWet Weather Flow Management Plan (WWFMP) and Sanitary Sewer Overflow (SSO) projects .... Already Approved in FY '07-08 and FY'08-09 CIP *** Master Plan projects as identified by CH2M Hill draft local Wastewater Master Plan ProjectIY ear Total 08/09 I 09/10 I 10/11 I 11/12 I 12/13 Remaining WWFMP Work 8,500,000 8,500,000 Basin 22 Rehab 6,000,000 6,000,000 10th & N Street Upgrade (Proj #1) 3,935,000 3,935,000 58th Street Bypass (proj #9) 2,195,000 2,195,000 9th Street Sewer Upgrade (Proj #2) 476,000 476,000 Main St Improvements # 1 (Proj #10) 2,102,000 2,102,000 Main St Improvements # 2 (proj #13) 1,145,000 1,145,000 A Street Improvements # 1 (proj #11) 539,000 539,000 . A Street Improvements # 2 (proj #12) 246,000 246,000 A Street Improvements # 3 (proj #14) 163,000 163,000 Misc Rehab 11,000,000 1,000,000 1,000,000 1,000,000 Jasper Road 11,500,000 4,000,000 7,500,000 Gray Jaqua 430,000 130,000 300,000 PeaceHealth Riverbend P5 3,189,900 . 3,189,900 McKenzie Hwy 1,626,000 1,626,000 Local Sewer Extensions 8,000,000 1,000,000 Franklin Exp**** 2,998,000 2,998,000 Nugget Way PS**** 1,443,000 1 ,443,000 Totals 61,046,900 12,630,0001 17,735,0001 . 5,773,0001 6,960,9001 2,948,000 Note- Project estimates in 2008 dollars Attachment B *"** Not counted in Total-Funded through other sources 12 of 15 Updated 5/8/2008 ('I') ..... ;g .c >< W $45.00 $40.00 $35.00 $30.00 $25.00 $20..00 $15.00 $10.00 $5.00 $0.00 Springfield Monthly Regional & Local Residential Wastewater Bill w/Historical & Future.. Trend Using Option #1 l.~_~~gi~~~I__~ ~OC~I ~-i\ .... ... :t;" ~r11.2' .' 04/05 . 05/06 06/07 07/08 08/09 09/10 010/11 11/12 12/13 ~ "Elrl Year Q.)~ ]~ 0("1') cd~ 07/08 09/10 010/11 12/13 ~ $14.22 $17.51 $18.38 $20..27 $13.24 $16.01 $21.31 .$33.51- $41.57 $3~ 191 : $2:901 10.1. ,10.1. 01/02 02/03 03/04 $8.53 $8.53 $9.09 $10.15 $10.15 $10.56 . $18.69 $18.69. .$19~65 1$ Change I $0.001. $0..971 '" No Regional or Local Rate increase from 01/02 to 02/03 "'''' Residential based on average customer using 5,000 gallons per month ',J: i$B.53~ . f: .:~ li$8.53'~ . ,-::\ 04/05 $11.28 $10.83 $22:11 .. $2.461 0.1/0.2 02/0.3 03/04 04/05 05/06 07/08 08/0.9 09/10 010/11 11/12 1_2/13 00/0 7O.IcJ 240/0 6% 80/0 11 o.IcJ 11 0/0 5% 50/0 50/0 OO.IcJ 40/0 3O.IcJ 70/0 6 o.IcJ 1 OO.IcJ 100/0 10% 1 OO.IcJ 100/0 T ota I 0% :5O.IcJ .......12% . :.7%> .... 7.oJb 10.% .. 11 oJb . .'.7%... 70Jb . .....8OJb Updated 5/8/2008 01/02 02/03 03/04 v ...... :0 :c x lLl $6,000 . $5,000. $4,000 $3,000 $2,000 $1,000 $- ~: ~; l ~~.:. l~l I, J.'... ~;;.. - ~ ~;~ :ji .;~ ~l f: co,,; '!I I: .~ ,: .1 Wastewater SDC's and Total'Wastewater Fees by City ~Wastewater -Average Sewer -ll-Monthly Wastewater -Average Monthly Wastewater ~ . } i! f~~ i,i: ~-.~ . t.,l, ~? '.I~: l.',;: . ;....~,;..:.. ~~ ~ 1', ~ . ~i. lli:' :IJ~ . ;~(~ :.Ii .~ :[ Ll" tL I"- .!~ t~l ~t :';~ Jr ;", .r ':~.f.'. I '" .;1 i:.;g ..~ ~' - \'? r:l w hi II i{ ;m ...(. .;' I~I ~:' .:t ~a_t ;.~i. N.~ ,!',it f."~ iy, :~ ~. ~:~ t CO_1~ ~~:D ~ dl(') Q).....-l ]t) ~~ :t::.....-l < E co ..c (fJ Q) c!> (ii ~ (fJ Q) (j ~ ro 2: o u co Q) c Q) > ... "U (ii li= Cl C 'C a. C/) ~ 'S; c c ~. u ~ E Q) ro C/) c o 1:: Q) > co Q) [0 >- c co .0 ~ ... Q) c Q) Cl ::J. W ~ 'S; c o fIJ ~ "U C co t o 0. c c :.:J 't) ~ "0 C Q) [0 Q) oil Jg > E ~ Jg -0 -0 C C ... 0 Q) ro Q) .:; 0 c >- Q) L- .:; c E (!) ro ~ m ..... li= C t ::i c -0 c City .c c ro Q) Q) Q) ro c Q) City CJ) CJ) c: 0 t c 0> C ..... Q) Q) Q) ~ Q) c ~ m > CJ) .0 0> 0> L- a .!!l 0 > 'C U) co ~ <( co ::J ro (!) () () ~ 0.. 0- 0 Q) W t: U) ~ CO 0 () Wastewater 4,923 4,896 4,171 4,153 3,258 3,250 3,121 2,870 2,804 2,800 2,632 2,376 2,038 1,627 1,322 Wastewater Monthly 24~63 43.00 27.42 32.47 38.81 42.00 30.32 45.65 37.72 "29.89 23.54 35.29 25.18 22.61 31.83 Monthly Wastewater Wastewater * Combined Local/Regional Wastewater SDCs ** Residential based on average customer using 6.68 units (5,000 gal) per month Updated 5/8/2008 . 'O;f" ...... :0 :c >< ill Combined Residential seCts and Total Monthly Wastewater Fees by City mc::::nTotal SDC's -Average SDC's ----Monthly Wastewater - - - 'Average Sewer $20,000 $15,000 $10,000 ';:1 I~I :i !~ $5.000 ,~) '- ;t~_.~~ H_ ~~i ~~- . t,~.~... ~f. ,~: '~ f~ . ~".l .n ".', ~. [;: ~{. $0 iY !i ;; ;-:, c c ::J U) ~ c o t:: Q) > ro Q) a::l "0 C (I.) a::l E ro .c (/) Q) c!5 ~ ro ~ o t) ~ 'S; c o (/) ~ ~\ (J) " cii' ..- :':. __ ._~~ h '-~.; li~l II Ave SDC's $11 221 . ~.: ,~ t., ClO..~ It ~ ..~ ~( <<>,~ .'\- =- . coT ~. ~ 'j;! ~j' ~:~ Q) S: (/) Q) L.. () (I.) > e <.9 (I.) 0) ro ~ o () $50.00 $45.00 $40.00 $35:00 $30.00 $25.00 $20~OO---- ~- $15.00 $10.00 $5.00 $- CO 1:llr) <l)~ ]~ Ulr) C\$~ t: .<e Q) :m i< :m > c c E ~ "0 "0 i< 0 C 0 Q) co Q) 'S; >- Q) '- t:: co 'S; "0 C E <.9 Category I :.J ro lj:: co ill c c c ~ Category I Q) .r::. c c Q) Q) co ...... > (/) 0 c: Q) 0) 1:: c ro 0) .S .0 (/) Q) City (/) co Q) (/) 0 m c 0 Q) :2 ~ Q) 0) City ~ '- 'C > en ::l '- co Q) <.9 ~ () 0- 0.. ill (J U ~ m en :2 0 U Wastewater 2,632 2,800 4,923 4,153 4,171 2,038 3,121 3,258 3,250 2,804 1,627 2,870 2,376 4,896 1,322 Wastewater Stormwater 455 900 802 492 237 0 1,100 614 145 449 493 0 0 0 1,255 Stormwater Transportation 4,897 3,200 2,721 3,859 2,228 4,356 1,057 2,000 1,738 1,814 1,615 1,425 1,719 0 775 Transportation Parks 8,029 6,783 3,643 2,502 5,084 3,550 2,513 3,117 .3,283 0 2,924 2,118 0 0 238 Parks Water 4,628 3,144 4,043 4,436 1,841 3,496 3,199 1,787 1,937 4,184 2,167 0 2,023 0 1,063 Water Total SDC's 20,641 16,827 16,132 1 5,442 13,561 13,440 10,990 10,776 10,353 9,251 8,826 6,413 6,118 .4,896 4,653 Total SDC's * Combined Local/Regional Wastewater SDCs .. Information based on 2,400 sq. ft residential house ... Springfield Water SDC based on 3/4" pipe and second level elevation (570' to 670') pump s.tation fees i< "0 Q5 l+= 0> C 'C 0- W "0 C ro :e o a.. co CD c ~ i< Q) c Q) 0> ::l W E Q) ro w ~ 'S; c c ~ u :2 >- c co .0 <i: Mon. Wastewater .... Average Monthly Sewer bill for all listed cities Is $32:69 ....~ Springfield Monthly Total Wastewater Fees Include a 11 % Regional and 10% Local increase ...... Residential based on average customer using 6.68 units (5.000 gal) per month Updated 5/8/2008 .