Loading...
HomeMy WebLinkAboutApplication APPLICANT 5/28/2008 I I I I I I I I I I I I I I I I I I I Stormwater Drainage Report for Springfield Fire Station No. 16 Prepared For: The City of Springfield 225 Fifth Street Springfield, Oregon 97477 Prepared By: KPFF Consulting Engineers 1201 Oak Street, Suite 100 Eugene, Oregon 97401 Springfield, Oregon I EXPIRES: &/ !t'J/JO(/1r f I KPFF Project No. 307821 May 2008 Date Received: MAY 2 8 2008 Original Submittal I I I I I I I I I I I I I I I I I I I Table of Contents 1. EXECUTIVE SU MMARY ......................................................................... ....... ........................... ................. .... 1 2. EXISTI N G CO N DITIO NS ...................... ...................... ....... ............................................................................ 1 2,1 Descnptlon of Pre-Development Site . .. ...... , ,1 22 Pre-Development Drainage.... , ....... ...... ... ........, 1 3. PROPOS ED D EVE LOPME NT ................ ................................. ...................... ................................................ 1 3 1 Descnptlon of Proposed Development. .... ............. , .., ... .., ......... .. ................ , 1 4. HYDROLOGIC ANALYSIS ............................................................................................................................ 1 41 Computer Modeling.............. .. . , ............., , , . .... .1 4 2 Post-Development............, .. ..... ............ . 2 5. PROPOSED STORM DRAINAGE IMPROVEMENTS ................................................................................... 2 5 1 Water Quality.. .... ,........... . , ,..., ....... . , , ....... 2 52 Conveyance .................................... ......... .. ., ,................... ,....... .. .............3 7. PROJ ECT OVERViEW............................................. ........................... .......................................................... 3 Date Received: MAY 2 8 2008 Original Submittal I I I I I I I I I I I I I I I I I I I Appendices APPENDIX A: DRAWINGS Basin Map Utility Plan Details APPENDIX B: HYDROLOGY APPENDIX C: CONVEYANCE CALCULATIONS APPENDIX D: WATER QUALITY CALCULATIONS Date Received: MAY 2 8 2008 Original Submittal_ I I I I I I I I I I I I I I I I I I I SPRINGFIELD FIRE Sr A TlON No. 16 SPRINGFIELD, OREGON 1. EXECUTIVE SUMMARY This Storm Drainage Report has been prepared for the proposed Spnngfield Fire Station No 16 (FS) replacement located southeast of the intersection of Main Street and 68th Place In Spnngfield, Oregon, This report presents the results of the hydrologic and hydraulic analysIs for the new development and descnbes proposed storm drainage Improvements that will meet or exceed City of Spnngfield storm drainage cntena and standards, 2. EXISTING CONDITIONS 2.1. Description of Pre-Development Site The Spnngfield FS property is approximately 1 acre total In size and located at the eXisting Springfield Fire Station site In Spnngfield. The site IS bounded by 68th Place to the west, residences to the east and south, and Main Street to the north, The Lane County SOIl Survey indicates the following sOil types are present on the site' TABLE 2.1- SCS SOIL CLASSIFICA nON CRITERIA I 5011 Name Description I Map Symbol Urban land complex Pengra 106A 2.2. Pre-Development Drainage The eXisting site conditions pnmanly rely on overland flow to catch basins connecting to the public system In 68th Place and Main Street. There are two catch basins located In the parking area to the south of the bUilding, one to the west of the bUilding, and a trench dram at the end of the dnve to the north, bordenng Main Street 3. PROPOSED DEVELOPMENT 3.1. Description of Proposed Development The proposed Springfield FS development area IS approximately 1 acre and consists of a fire station, vehicle wash area, and the associated parkmg lot areas and sidewalks. 4. HYDROLOGIC ANALYSIS 4.1. Computer Modeling Several spreadsheets based on the Santa Barbara Urban Hydrograph Method are used m the calculation of this report, These spreadsheets were used for the conveyance and peak runoff calculations, The spreadsheets used for the water quality calculations meet the cntena outlined m the City of Portland's SWMM and have been approved by the City of Portland Bureau of Environmental Services (BES) on similar projects KPFF has completed in the past Date Received: MAY 2 8 2008 KPFF Project No 307821 Spnngfield, Oregon 0n_~~~~'~~~,l May 2008 I I I I I I I I I I I I I I I I I I I SPRINGFIELD FIRE STATION NO.16 SPRINGFIELD, OREGON PreCipitation data for the respective storms are City of Spnngfield design storms TABLE 4.1- 24-HR PRECIPITA TlON FOR SPRINGFIELD, OR (NOAA Atlas 2, Volume X) 24.HR PreCIpItation Storm Event WQ 25 Inches 0 83 4 8 4.2. Post-Development Curve numbers for Impervious and pervious areas used In the computations were 98 and 80, respectively based on a Type 1-A rainfall dlstnbution, 24-hour storm duration The drainage basins are Identified In the Basm Map drawing, ST-1 found in Appendix A Impervious and pervious areas were calculated uSing the proposed site plan drawings. 5. PROPOSED STORM DRAINAGE IMPROVEMENTS The proposed Improvements for the Spnngfield FS will meet or exceed all requirements of the Spnngfleld Development Code and the CIty of Spnngfleld PublIC Works Engmeenng DesIgn Standards and Procedures Manual (EDSP), The proposed storm drainage system consists of surface Inlets to collect surface runoff and an underground storm drainage pipe network to convey the collected runoff as shown In the Storm Uttltty Map drawing, ST-2 found In Appendix A, Bloswales and water quality catch basins provide water quality treatment of the site Impervious surfaces, The pnvate on-site storm drainage will connect to the proposed public storm drainage system at the property line. 5.1. Water Quality Sioswales Approximately 35% of the non-building rooftop (NBR) stormwater runoff from the Improvement area of the site Will be treated uSing bloswales, Bloswales are long narrow landscaped depressions used to collect and convey stormwater runoff, allOWing pollutants to settle and filter out as the water Infiltrates Into the ground or flows from one bay to the next through the facIlity After the water IS filtered through the swales, the water IS collected In ditch mlets and conveyed to the public storm system, All bloswales are designed and sized In accordance With the BES method or SWMM Simplified Approach uSing the SIMs form It should be noted that the northern swale does not receive any runoff from paved vehicle areas and, therefore, IS sized for volume rather than treatment Details for the bloswales are on sheet C6.3 of the site review plans, which are Included In Appendix A, The complete water quality calculations and worksheets for the basins are In Appendix D of thiS report Stormwater Filters Approximately 65% of the NBR for the Improved area of the site Will be treated With watD.~eived: basins Details for the water quality catch basins are provided on sheet C6 0 of the site review plans, which are Included In Appendix A. MAY 2 A 2008 KPFF PrOject No, 307821 Spnngfield, Oregon . 2 Jrlgll1,11 SL.Oti "tta. Storm Drainage Report May 2008 I I I I I I I I I I I I I I I I I I I SPRINGFIELD FIRE STATION No. 16 SPRINGFIELD, OREGON 5.2. Conveyance The conveyance system IS designed to convey the stormwater runoff peak flows of 25-year storm event or greater Pipe sizes and slopes shown on plans reflect the results of the calculations The complete conveyance calculations and worksheets are In Appendix C of this report. 6. PROJECT OVERVIEW This Storm Drainage Report as prepared by KPFF Consulting Engineers (KPFF) describes the concepts and design Intent for stormwater management at the Springfield Fire Station No 16 In Springfield, Oregon, Date Received: MAY 2 8 2008 Original Submittal KPFF Project No 307821 Spnngfield, Oregon 3 Storm Drainage Report May 2008 I " I I I I I I I I I I I I I I I I I I Appendix A: Drawings lOate Received: MAY Z 8 2~~S f\.,....~. )~..... ~ . A, ~~ ~r~j,n4~' 1~~~;:~n4i ~.J....._-.___ ~~,. _ ___ I I MAIN STREET - McKENZIE HIGHWAY (HIGHWAY 126) I 1\ I I I I I I I I I I I.-J I I I I 40 - I I",,,!........l... 'TRENCH DRAIN BASIN 9 ~ &'~~~ rJ .:::~ .-1.. ~/ ~~ J 2,~[N4J; - ~/~ i-=-~ ;:/ ~ "--,>::>: , /' ~-.,.,... 1 ,~- -.:: ..... - ..~ ", ,I... ,I.. BASIN 5 '- I \ t, \ / ) ~ v (/ / ~ BASIN 2 [] f.il U -< e-1 0.. :r: f-; 00 \0 " Ii II I[ BASIN 1 --- :::::::::- --- ~ Date Received: MAY 2 8 2008 SCALE Ongmal submittal o 20 80 NORTH 0\"\ 1(' '~ "- / '~..... -..-" 40 1 INCH = 40 FEET ." 5E JACKSON g ROSEBURG, OREGON " 97470 (541}67Hl273 FAX {:.'Il)673.7560 plharch@rosenet.tlet r- Z u CL .<( ~ I- U UJ I- Ic:::( , ~Q. Consultmg Engmeers """"'SIred Sit,,,, ~ freg:n 97401 (540 fJ84--49Cl2 FAX (540 &14-4009 IJ) ..-t 2 o t9 w '" o 9 w Ii: t9 2 "' Q. Ul '" o "- 2 o ~ t- Ul w ~ o z z o ...... I- <( I- U) UJ c:C ...... LL o --' UJ ...... LL 19 z ...... c:C 0.. U) 1;; W 0: tii 2 :;: :;: M '" <Xl '" ;;: w 2 .. DRAWN BY AMF CHECKED BY ..... DATE 05-26-2008 TITLE BASIN MAP SCALE SHEET NO 5T-1 1 OF 3 basins dwg I I I~ ~ \ I I I I I I I I I I I I~ I I I 40 I MAIN STREET - McKENZIE HIGHWAY (HIGHWAY 126) --L, ~ U~', _ _ (lHII iV. f~ (Lm'~ '~~ ~ ~~I< ) [~ , :::;1J ~I _TR' JHU- "TRENCH DRAI!\ / lRENCH DRAIN Cl , W / -/ 9@-J / "" ~ ~I 1/ --1 I ! I Cl /-~ wll- . I I.. .... .~ Il'/ I~ D' f- ro \D DITCH INLET ---- .:::::::::: ) - TR o Cl Date Received!: MAY 2 8 2008 SCALE Ongll.:...ll :.:>,,,jOII'lif:"'I,,_ ._' -,---, NORTH /-:;:-, I ," ' I( ~; o 20 40 80 1 INCH = 40 FEET 615 SE JACKSON '- ROSEBURG, OREGON ,- <': ~ 97470 LL (541)672 0273 FAX (541)6n~7S60 _ plb;uch@rosene.lnet I--- Z LL CC U a.. ' ~- :;:( f-_ U_ w . f-_ I<( u . ~a. ~7 Consultmg EnglneetS 1201O>k S>reI Ilk'" ~ O"tp7I 97401 (54U 6lJ4-49(2 FAX154lfi8H009 ,..@a ~ .-i z o 19 w 0: o ci -' w u: 19 Z a: "- tJl 0: o u. Z o i= <! t- tJl W 0: u: . o z z o I-t I- ~ I- (f) w IX I-t LL o .....J W I-t LL ~ Z I-t ct: a... (f) tu w 0: t- tJl Z ;( ::E "" tJl '" '" :;; w Z <! DRAWN BY AMF CHECKED BY .I.H DATE 05-26-2008 TITLE STORM UTILITY MAP SCALE SHE ET NO 5T-2 2 OF 3 plpenumbers dwg I-I AUTOMAllC ELECTRIC____________ I I\.~ I ACTUATED VALVE ~ I I r::-12"- 2"WW ~ \ DISCHARGE ro_~ I-~ Mn~ n ~ SLOPE -::::-- ::: - I GREASE TRAP :-- I ~ I I I 6g;~:~~ EA WAY\\ T~ \ L 1-,2"- I .., I I I 10 GAGE STEEL PLATE ASPHALT DIPPED, GIBSON STEEL BASINS OR APPROVED EQUAL I I I I I I SOLID DIAMOND SUPPOR~~.1lH~g ~ H20 LOADING ~ I T ~I l I I I NOTE 20" DUCTILE IRON SO / TRAFFIC GRATE RIM-PER PLAN 11.- r- '" 1 GREASE~ ---i' TRAP \11TH HINGED LID I I LJ .., ~ IE PER PLA~ ;. OJ (; 24"- / SECTION B-A 53" I ~ "'" ~TER INSERT, "'" SEE NOTE 3 . ~ RFPLACEABLE Ltl ABSORBEN T ~ POUCHES ~'..... Il I - I 48 25" SEcnON A-A -8 ..... ommooooo 000000000000 ooooooooom 000000000000 000000000000 000000000000 omomoooo oooooooomo <l: 000000000000 000000000000 J 000000000000 000000000000 omomoooo 000000000000 000000000000 000000000000 oomooooooo 000000000000 ooooomoooo 000000000000 -8 -= I , CONTRACTOR TO \I1DEN EXCAVAllON AS REQUIRED ro OBTAIN COMPACllON \\1TH CONTRACTORS COMPACllON EQUIPMENT GRATE SHALL BE RATED FOR HS-20 LOADING AND BIKE llRE 3 NEW CATCH BASINS TO BE INSTALLED WITH CATCH BASIN FILTER INSERTS INSERTS SHALL BE MANUFACTURED BY KRISTAR, MODEL NO FF-24D AND INSTALLED PER MANUFACTURER S WRITTEN SPECIFlCATIONS LEAK PROOF GASKET UNDER SOLID LID I AUTOMATIC AIR ACTUATED VALVE ON 2. DIA PIPE BOX F ABRICA TED FROM 10 GA MATERIAL I 0- SANITARY/STORM}T~LET WITH SWITCH I I - POL YMER CONCRETE~ ::::::::: ' \ :-' 64' Jr TRENCH rAIN ~~l " r GRATE SEE NOTE 5 . PER PLAN . I . _A-/ I ~CI~~~~ Lm_=C='=~SOLlD END CAP _ A ~PRECAST' PRESLOPED CHANNELS DRAIN PER 14" PLAN 4", , rPAVEMENT SECllON PER PLAN L . -. 'I 0 1 I". - t '17 -: - --.,..,.. - 'l I ~-.-: -:-::-: - -"f I ,,- / I I '''!'\' -:4 j- 1-1 ~ - \:(4) ,4X CONT ,4U 0 24"0 C J:!Q.II:.S.. , MATCH EXISTING TRENCH GRATE \\1DTH AND MATERIAL FOR THE SYSTEM IN THE DRIVEWAY OFF MAIN STREET 2 NEW TRENCH ORAIN TO THE SOUTH TO BE PRE-FORMED PRE-SLOPEO AND MADE OF POLYMER CONCRETE 3 SYSTEM SHALL BE INSTALLED PER MANUFACTURE'S INS"fRUCllONS wi ACCESSORIES OF SAME MATERIAL AS CHANNELS 4 ALL DIMENSIONS ARE BASED ON POL YDRAIN BY ABT INC PRODUCTS AND \I1LL NEED TO BE REVISED IF A SUBSllTUTION PRODUCT IS USED INVERT ELEVA 1l0NS OF THE TRENCH DRAIN SYSTEM AND CATCH BASINS CONNECTING ro THE STORM DRAINAGE SYSTEM \I1LL ALSO NEED TO BE REVISED 5 SEE PROJECT SPECfFlCA llDNS FOR "fRENCH GRATE 8 TRENCH DRAIN NTS II :~.. ; i ,I ~''"oo~_. BODY /LLl 1-4"--1 "' 1 DRAIN SHALL BE INSTAllED WITH A VENT AND MEANS OF MAINTAINING TRAP SEAL IN ACCORDANCE 'MTH CURRENT PLUMBING CODE 2 DRAIN TRAP AND CLEANOUT PER DETAIL 2A ON THIS SHEET CD SANITARY DRAIN NTS __!4"l '92"1 I ~t 7 !/~j-1 ~ I :" '" . i ~I \. '------./ ) '---- CAST IRON _ ~ BODY ,r N P T -I j:::-~~~~5UT PLUG Date Received: @ DEEP SEAL TRAP NTS MAY 2 8 2008 Original subil\lttai "lSSE)~ ROSE6lIRG ~ON "97470 (541)6n-027l FA-'l (541)673-7560 plba.!:h~net U a.. <( ~ ti w I- .-<( .:1: U ~~ Consu/[mg Eng:meers an"",,,,,,,, ""'m &gene 0q;uJ 97401 (54tJ~ FAX (S4~ ~ z a \0 lil .--I '" a 0 ~ z '-' z z 1f V> 0 ...... '" f- ir <( z f- a (f) i= '" W l- V) W cr:: ~ ...... ~ LL z 0 '" --l W ...... LL ~ t9 z '" l- V> ...... Z cr:: :< 0... L '" (f) "' '" '" ~"" DRAWN BY AMF CHECKED BY JLH DATE 5-27-2008 TITLE CIVIL DETAILS SCALE SHEET NO (6.1 7 OF 11 7821dl dwg I I 25- : MIN, ,2' MAX 2' MIN BOTTOM Of BASIN 2 MIN I I~ -WET ZONE A' -F-----'-- ....... ~ _ _ _ ,~jl. _ _ ~ ' ~___~ ~ ~ 4MIN j - - - ,- -- - <... PLANTING PER ! 1 ~ =------LANDSCAPE PLANS ~ ~ ... - " ~ RIVER ROCK I I _ 30'---j LJ,.';{';.;';;I 66"MIN 'S. AMENDED -" 'r. -~." . J LOAM \\RAP DRAINAGE DRNNAGEJ "-4' PVC PERF PIPE FOR FABRIC AROUND ALL FILL BASIN PER PLAN SLOPE SIDES 12" OVERLAP TO DRAIN - 810SWALE -2'MIN I I = I , LONGITUDINAL SLOPE TO BE AS SHOWN ON PLANS OR 0 57. MINIMUM 2. SIT PLANTING PLANS FOR SWALE PLANTING ..., I 0- BIOSWALE ,.------ /~ '> -~ /' /' NTS I P STORM PIPE'/ '" '" ~ /MlTER PIPE 45 ~~I W/ GRATE COVER ~-- j~ QU-, ) I ~ (~ 2"-6" CLEAN I !iQJIS.. , INSTALL ROCK 3' 1I10E ROUND RIVER ROCK I ROCK OUTFALL CD 0- NTS. I ! I: I fSAWCUT EDGE OF CONCRETE 7'" RE-BAR 0 IS" DC DRILLED 8< EPOXYED IN PLACE ~ '" =f WHEEL STOP SEE \ DETAIL THIS SHEET I' I +- CONCRETE !lASE MAIDlJAL I! r hi 1 I t:- 24 ~GR~NULAR WORKING BLANKET -NEW CONCRETE DRIVEWAY PER PLANS SIT DETNL S/C6 2 II CD CONCRETE JOINT TRANSITION NTS. I I ~ ~~ '... DIFfUSING PLATFORM 4" CAST IN PLACE CONCRETE SEED CONCRETE II1TH ROUND ROCK MINIMUM SI2E ROCK TO BE 3/4" MAXIMUM SIZE ROCK 2" ROCK SHOULD BE IMBEDDED INTO CONCRETE TO HALF OF ITS CIRCUMFERENCE SPACING BETWEEN ROCK SHOULD BE A MINIMUM OF 1/2" AND MAXIMUM OF ," SEE SITE PLAN FOR LOCATION OF DIFFUSING PLATFORMS ,-- 3/4" EXPANSION JOINT MATERIAL, HOLD DOWN 3/4. BELOW FINAL GRADE SEAL GAP II1TH SELF LEVELING WATER PROOF AND UV PROTECTED SEALER "-0"- 2" CLEAF, TYP HEAVY A/C PVM T SEE DETAIL 2/C6 2 l'~ ~ " "'000')0') /0. r.---.!~ <' REBAR (2) #4 CONTINUOUS REBAR S" LONG - '" BAR 0 24" 0 C 2" CLEAR MINIMUM 4" OF 3/4" MINUS COMPACTED CRUSHED QUARRY ROCK COMPACTED TO AT LEAST 957. OF THE MATERIAL'S MAXIMUM DRY OENSllY AS DETERMINED BY AASHTO METHOD T -99 - COMPACTED OR UNDISTURBED SUBGRADE (RAMP DETECTABLE WARNING TEXTURE SEE DETAIL THIS SHEET : lllUlL_, , ~~~ DIFFUSION EDGE NTS EDGE OF\ PARKING LOT E 4" WHITE~ ~ STRIP (TYP) I: ADA SYMBOL SIGN II1TH _ " "VAN ACCESSIBLE" , :::----.-~ TEXT SHALL OCCUR ONLY AT STALLS I SHOWN ON PLANS J VAN '" -r 9 (TVP) ~ ~;,.:..::,:~, , CONCRETE SHALL BE 4000 PSl 12" GRANULAR WORKING BLANKET 2. MAXIMUM CONlROL JOINT SPACING SHAU BE 12 FEET 3 MAXIMUM CONSTRUCTION JOINT SPACING SHALL BE 36 FEET 90 TYP (U N 0) II o I STANDARD CONCRETE PAVEMENT SECTION I o NTS I _ 0 Oz -2- " 0 ~ z 2- N TS TYP. PARKING LAYOUT m"""''''''~ ROSEBURG, OREGON 97470 (541)672-0273 FAX (S41)67J 7560 pIbafUl~nell-- Z U 0.. <l: ::( G UJ f- ~~ COlISlJl/mg EnglneetB rot(hlc Sb"ooI S."''' ~Chlp::n974(Jf (540684-49112 FAX (541) 684-4909 z 0 \D b3 .--i a: 0 0 g Z '" z Z ~ lJl 0 ...... f- a: <( it f- z 0 (j') ;:: "" LlJ I- lJl cr:: "' r;: ...... !e LL z 0 "" ---l LlJ ...... LL 19 ~ z a: >- ...... lJl Z cr:: :< a.. :E .., (j') ~ :Jl ORA WN BY AMF CHECKED BY JLH DATE 5-27-2008 TITLE C1VI L DET AI LS Date Received: SCALE MAY 2 8 2008 SHEET NO (6.3 Onglnal But/mitt;,;", ___ "1---- 9 OF 11 7821 dldwg I I I I I I I I NOT USED CD N TS I I FlRE HYDRANT- A W W A ~ " CS02 COMPRESSION TYPE ~~(2) 2 1/2 HOSE NOZZLES ~~ ~Q~~~R~~~ MB~ ,/(1) S" STORZ PUMPER PORT (MUELLER CENTURION A423 OR WATEROUS PACER) 0 ~OISTANCE PER PLAN- ,6" GATE VALVE & e- /w VALVE BOX SPEC SET 2"-6" jO: FLG X FLG ABOVE F1Nl~ *1' rAC OR :;:.~O:':':"~ - ~ . ~ j ViA, It( ~o;~ . ~~ ~ I -~~,." ~~. Uirt/~TEEW/MJ I--f" 'I ~ j ; 0 ~ / - 3000 PSI -" I ~ CONe SUPPORT~/ ~ ~ ~ BLOCK ::E Z <C . ~:)::: ~~g~DE DRAIN ~ v e ~ lli11rS... 1 ALL FIRE HYDRANT ASSEMBLIES lilBLUDE A TEE VALVE AND BOX GATE VALVE AS SHOWN 2 ALL FlRE HYDRANT ASSEMBLIES SHALL BE IN ACCORDANCE WlTH SUB WATER DEPARTMENT STANDARDS ALL HYDRAN1S W1LL REQUIRE STORZ STEAMER PORT FITTINGS CONTACT BART McKEE AT SUB WATER DEPARTMENT FOR REQUIREMENTS, (S41)-744-37S6 I I I I I o FIRE HYDRANT ASSEMBLY, M.J. NTS I I I I A ~ !~ A -A 1 12 SLOPE MIN (TYP) + '^" PLAN STANDARD MANHOLE~ -. /GROUT FRAME rFINISH GRAOE FRAME ANO COVER ,,~ (TYP ) { t i~'~ ~. . x 'J------il "'\..~ ~~ --1042'-- wlx "":i\,~:~~,: ,"~\Oi'- ~ ~<:i SEE NOTE 3~ ".oil \ v z '" ~ .oil /PRECA5T SECTIONS , (HEIGHT VARIES) SEE NOTE 1 .oil ',,;ll .oil ( ,j kCAST_IN PLACE OR ..J ~~JC~~~~~~ 3000 PSI 2" MIN FROM TOP OF ~ $ll PIPE TO MANHOLE /' ' , SECTION .....1 .~~rv. qU 'i:.::',:':{. . ' , \ " f.': ,/" ~~~::/ ~~~..::.;; ~ECTlON 'A-A' "- 8" MIN CONCRETE 5' v~ TYP - ioll till1L ALL PRECAST SECTIONS SHALL CONFORM TO REQUIREMEN1S OF ASTM C-478 INSTALL RUBBER GASKETS AT ALL PRECAST MANHOLE SECTION JOIN1S 3. ALL PIPE CONNECTIONS TO MANHOLE SHALL BE WATERTIGHT CD STANDARD MANHOLE NTS [-IS'-j ~INLET FRAME & GRATING =: II... SEE NOTE 1 , '-J R ~! ..--" I ~~~ ~~~ ~ 4" PERF J PIPE INLET PLAN ~FlNISH GRAOE RIM & +~ OVE~~~RW :~~ 51 ~ ~_ _________~g~~~~ --'l i J :~ , ~/ IU - TO STORM , J ... r-- SYSTEM <"6 '--.... 4" PERF PIPE___ TR('/. ' ~.' ~'. ~IE=SEE PLAN INLET ~ IE=SEE PLAN V __ ~ . i~U~~EO~YS\ I BAND BOLTED OR ' EMBEDDED 2" IN WALL (2) . SUPPORTS :-10'- -~BASE MATERIAL I- -15- 1S' SECTION 7S'MIII~ SUMP 2S'- rJQJL GRATING AND FRAME SHALL BE GALVANIZED STEEL MEDIUM Dun CD NTS TRAPPED DITCH INLET 350D PSI~ CONCRETE , COLLAR I "'(1) #4~2"~1 EA WAY :3" I I -II . I L1 -r-,- ~"" : FT-/\~ ~ GREASE TRAP~ ~ I I FlL TER INSERT SEE NOTE 3 RFPLAf:F"AElI.E ABSORBENT POUCHES '825" saUD DIAMOND PLATE. UlJ ~ SUPPOR1S AASHTO , H20 LOADING <( '- I c::~rTlnN A-A. ottrmm!lII mmlDmlIIl ~== U~l~mil <( aRID IUQIl!IRD ! DmalllRmllnDlII!IIm um~liiWl IUIIIlIIIUl I11IB.IIIIIWlIUIlIIIIIIUI, =011= II=mn """ GRATE SEE nrUIUD nlllllJllll NOTE 2- NOTES u CONTRACTOR TO W1DEN EXCAVATION AS REQUIRED TO OBTAIN COMPACTION W1TH CONTRACTORS COMPACTION EQUIPMENT 2. GRATE SHALL BE RATED FOR HS-20 LOADING AND BIKE TIRE NEW CATCH BASINS TO BE INSTALLED WITH CATCH BASIN FlLTER INSERTS INSERTS SHALL BE MANUFACTURED BY KRISTAR, MODEL NO FF-24D AND INSTALLED PER MANUFACTURE'S WRITTEN SPECIFICATIONS LEAK PROOF GASKET UNDER SaUD UD 5 BOX F ABRICA TED FROM 10 GA MATERIAL CD WATER QUALITY CATCH BASIN N TS G1SSEJIIOCSOO ROSEBlJRG" ~ON r 97470 (S4t}612~Z73;::~ fAX {541}673-75Go plbard>~flet u "'- ~ :;r I- U _ UJ I- ~ ....:.. ~ ~ ~* Consullmg Engzneers """"- SU/om &.ge:naCr9;pl !N4OI (S41J{l/4~ FAX (S4'6lJ4-.4.SaJ 1.0 T"'l z o &1 '" o ~~ '" Z ~ Vl '" [2 Z o >= ~ Vl W ~ ~ Z '" o z z o ..... ~ <( ~ if) W cr:: ..... LL o ...J W ..... LL 19 z ..... cr:: a.. if) ~ '" >-- Vl Z .. >: '" "' al '" ""'" DRAWN BY AMF CHECKED BY' JLH DATE 5-27-2008 TITLE CIVIL DETAILS Date Received: SCALE MAY 2 8 2008 SHEET NO (6.0 Original SubmltL:,,_____._ ,_ 6 OF 11 7821dt dwg I I I I I I I I I I I I I I I I I I I Appendix B: Hydrology Date Received: MAY 2 8 2008 Original Submittal I I I Bureau of Environmental SelVices - SBUH Calculation Worksheet I PrOject Name Springfield Fire Station (25-Year Event) Designer: A. Backus Date. 05/12/08 Basm 1 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Preclpltalion In 24 hours (Pt) = Time of Concentration, Tc, minutes 41271 0091 801 481 51 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp 77471 0181 981 I I Note minimum Tc IS five minutes I Calculations are for the BES 25-Yearstorm 48 Inches of crain in 24 hours In an NRCS Type 1A distribution Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs 02725911391 029 Total Runoff Volume, V, cubic feet Time to Peak Runoff, hou rs 3,8811 783 I Runoff Hydrograph 035 I 030 . , , , " , , , I 025 I I 020 J!! " ::: 0 l: :> 0:: 015 I 010 I '" J .'~ / ~ 000 \ o 500 1000 1500 2000 2500 I I I Time, minutes I Date Received: MAY 2 8 2008 I Original submittal. I I I Bureau of Environmental Services - SBUH Calculation Worksheet I PrOject Name. Sprmgfleld Fire Station (25-Year Event) Designer. A. Backus Date 05/12/08 BasIn 2 User-SupplIed Data PervIOus Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentrallon, T c, mlnules I I 26861 0061 801 481 51 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes 6031 014 98 I Calculated Data CalculatIOns are for the BES 25-Year storm: 4.8 mches of ram In 24 hours In an NRCS T"pe 1A dlstrlbutton I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs 02000964191 0221 I Runoff Hydrograph 025 I I I I I I . I I I \: I 020 I 015 .l!! c.> ::: 0 c: ::l 0: 010 I I I I 005 I 000/ o 500 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ I 1000 1 SOD Time, mmutes I I 2000 2,9021 783 2500 Date Received: MAY 2 8 2008 Original Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet PrOject Name Spnngfleld Fire Station (25-Year Event) Designer A. Backus Date: 05/12/08 BasIn 3 User-SupplIed Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentration, Tc, mmutes I I I 361 0001 801 481 51 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes I Calculated Data CalculatIOns are for the BES 25-Year stonn. 4.8 mches of'ram in 24 hours m an NRCS Type 1A distribution I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs I Runoff Hydrograph 005 - I I I I ~ 003 " 15- l: :I a:: 002 I I I I I I I \ /.~ I 004 , , , , , , I' , , , , ' , I 004 003 002 001 001 000 o 500 I 0 0330599171 004 ~ 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ 1500 Time, 10m utes 2000 14041 003 981 5421 7831 2500 Date Received: MAY 2 8 2008 Original Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet Project Name' Springfield Fire Station (25-Year Event) Designer: A. Backus Date 05/12/08 Basm 4 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation m 24 hours (Pt) = Time of Concentration, Tc, mmules I I I 1259 003 80 48 5 Impervious Area ImpervIous Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five mmules I I, Calculations are for the BES 25-Year storm 48 inches of ram In 24 hours in an NRCS Type 1A distribution Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs o 0561898531 006 I Runoff Hydrograph 006 I I I 004 Ul '() :::- 003 0 !: ::l c:: 002 I I I I I I I 005 I, , , 001 I J~ / ~ 000 o 500 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours 1500 2000 Time, 10m utes 1188 003 98 7371 783 2500 Date Received: MAY 2 8 2008 Onglnal Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet Project Name: Spnngfield Fire Station (25-Year Event) Designer A. Backus Date' 05/12/08 Basin 5 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I I 1082 002 80 48 5 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five mmutes I Calculated Data Calculations are for the BES 25-Yearstorm 4.8 mches of ram m 24 hours m an NRCS Type 1A distribution I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs I Runoff Hydrograph 012 I 010 I 008 I I J!! '" :g 0 06 c: ::l " I 004 J ~ 002 I 000/ o 500 I I I I I I' , I I I I I I 0 0881563361 010 ~ Tolal Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ 1000 1500 Time, mmutes 2000 2759 006 98 1.2941 783 2500 Date Received: MAY t ? 2008 :f.q'll' !.!I,nQ! I I I Bureau of Environmental Services - SBUH Calculation Worksheet Project Name SpringfIeld Fire Station (25-Year Event) Designer A Backus Date: 05/12/08 Basin 6 User-SupplIed Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I I 41341 009 801 481 51 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes I Calculations are forthe BES 25-Year storm. ,4.8 Inches of rain In 24 hours In an NRCS Type 1A distributIOn Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs 0119499771 010 I Runoff Hydrograph 012 I I I 008 J!! '" :::: 006 0 c ::l c:: 004 I I I I I I I 010 I I I I I I I I , I I 002 I ~ 000 o 500 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ 1500 2000 Time, minutes 10721 0021 981 1,3441 783 2500 Date Received: MAY 2 8 2008 Orlgjna~ Submlltir, ___"..,. I I I Bureau of Environmental Services - SBUH CalculatIon Worksheet I PrOject Name. Sprmgfield Fire Station (2S-Year Event) Designer: A. Backus Date' 05/12/08 Basin 7 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I 01 0001 801 481 51 ImperviOus Area ImperviOus Area, SF ImperviOus Area, Acres ImperviOus Area Curve Number, CNlmp 3624 008 98 Nole minimum Tc IS five minutes I Calculated Data Calculations are for the BES 25-Yearstorm 48 mches of ram m 24 hours m an NRCS Type 1A dlstnbutlon I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs 0083186181 o 111 I Runoff Hydrograph 012 I 010 I' I I I 008 III U ::: 006 0 c: ;j a::: I I 004 002 J 000/ o 500 I I Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours 1.3781 783 \ I 1000 1500 TIme, mmutes I I 2000 2500 Date Received: MAY 2 8 2008 Original SubmittaL I I I Bureau of Environmental Services - SBUH Calculation Worksheet PrOject Name Sprmgfield Fire Station (25-Year Event) Designer. A. Backus Date 05/12/08 Basm 8 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I I 01 0001 801 4 ~I Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp 1962 005 98 Note minimum Tc IS five minutes I -Calculations are torthe BES 25-Year stonn 4.8 Inches otTaln In 24 hours In an NRCS Type 1A distribution Calculated Data I Total Pro)ectArea, Acres Peak Flow Rate, Qpeak, cfs o 0450365011 0061 I Runoff Hydrograph 006 'I I I 004 <II 'ti :::- 003 0 c ::l a:: 002 I I I I I I I 005 I I , I I I: I I I I I I I I 001 I J / 000 o 500 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours 7461 7831 \ 1500 2000 2500 Time, minutes Uate Received: MAY 2 B 2008 Oog..I,...; ':..luiflirtC!L_ I I I Bureau of Environmental Services - SBUH Calculation Worksheet PrOject Name Springfield Fire Station (25-Year Event) Designer: A. Backus Date' 05/12/08 Basin 9 User-SupplIed Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I I 1614 004 80 48 5 Impervious Area ImpervIous Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes I CalculatIOns are forthe BES 25-Year storm 4.8 mches of ram m 24 hours man NRCS Type 1A distribution Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs o 1018308081 0111 I Runoff Hydrograph 012 . I I I 008 J!! lJ ::: 006 0 c ::l a: 004 I I I I I I I 010 I' , , , , I I 002 I I It. /~ 000 ' o 500 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ 1500 2000 Time, mmutes 2821 006 98 1,4391 7831 2500 Date Keceived: MAY t 8 2008 'tIP ~'/" ~~n...:'\l .. 8\ I I I I I I I I I I I I I I I I I I I Appendix C: Conveyance Calculations Date Received: MAY 2 8 2008 Original Submittal I I ~ll1I Consuftmg Engmeers I I I I I I I I I I I I I I I I I CALC-BASIN AREA xis BASIN ITOTAL BASIN AREA SF ACRES 11874 02726 8,717 02001 1,440 0 0331 2,447 00562 3,840 00882 5,206 0 1195 3,624 00832 1,962 00450 4,435 01018 43,545 1 00 1 2 3 4 5 6 7 8 8 DRAINAGE BASIN AREAS TABLE C-1 I PERVIOUS AREA (CN 85) SF ACRES 4,127 00947 2,686 00617 36 0 0008 1,259 00289 1 081 00248 4,134 00949 o 0 0000 o 0 0000 1,614 00371 14,937 034 I IMPERVIOUS AREA (CN 98) SF ACRES 7,747 01778 6,031 0 1385 1 ,404 0 0322 1,188 00273 2,759 00633 1,072 0 0246 3,624 00832 1,962 0 0450 2,821 00648 28,608 0 66 I of I SPRINGFIELD FIRE STATION NO.16 Project 307821 KPFF Consulting Engineers By ALB/JLH CN /WQ VAULT/CB AREA (SF) 93 0 94 6,031 98 1,404 91 1,188 94 2,759 88 0 98 0 98 0 93 2821 94 14,203 Date Received: MAY 2 8 2008 ':~nt'1l(k;l S,,';0!rllttai 5/27/2008 I I Springfield Fire Station No. 16 Storm Drainage KPFF Consulting Engineers Spnngfield, Oregon Conveyance Calculations By ALB/JLH Project 307821 25-year DESIGN SECTION DESIGN CALCULATIONS DESIGN SUB-BASIN I RU~OFF TOTAL SLOPE DIA CAPACITY VEL RUNOFF VEL LENGTH OR TIME Q Qf Vf RATIO AT STRUCTURE MIN CFS CFS % IN CFS FT/S Q/Qf Q/QF FEET ST8 500 029 029 100 6 056 281 052 281 38 ----~-- 1- ST3 500 006 006 150 6 069 344 009 206 36 WQCB2 500 022 022 100 6 056 281 I 039 262 15 ST4/ST5 (WQCB2+ST3) 500 000 028 100 6 056 281 050 279 58 WOCB1 500 004 004 150 6 069 344 006 206 8 ST6 (WQCB1+ST4!ST5) 500 000 032 100 6 056 281 057 289 72 WQCB3 500 006 006 150 6 069 344 009 206 14 SDA1 500 000 006 150 6 069 344 009 206 17 SDA2 (SDA1+ST6) 500 000 038 100 6 056 281 068 299 55 WQCB4 500 010 010 100 6 056 281 018 208 - 14 SDA3 (SDA2+WQCB4) 500 000 048 150 6 069 344 070 368 34 ST1 500 011 011 100 6 056 281 020 215 66 ----- -~-- ST7 500 010 021 100 6 056 281 037 258 44 SDA4 (SDA3+ST7) 500 000 069 100 8 121 345 057 355 24 TRENCH DRAIN1 500 011 011 100 6 056 281 020 215 9 I I I I I I I I I I I I I I Date Received: I MAY 2 8 2008 ;H'1 _I UUihU..C~ I CALC-conveyance-calcs-25-yr -rev xis 5/26/2008 I I I I I I I- I I I I I I I I I I I I I Appendix D: Water Quality Calculations Date Received: MAY 2 8 2008 Original Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet Project Name: Springfield Fire Station (Water Quality Event) Designer. A. Backus Date. 05/12/08 Basin 1 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes I I I 4127\ 009 801 0831 51 ImperviOus Area ImperviOus Area, SF ImperviOus Area, Acres ImperviOus Area Curve Number, CNlmp Note minimum Tc IS five minutes 7747 018 98 I Calculated Data Calculations are for the BES Water Quality stonn 0 83 Inches of rain In 24 hours In an NRCS Type 1A dlstnbutlon ' I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs I Runoff Hydrograph 004 I 003 l: I 003 I 002 III 'i:i :::: 0 c ::l n:: 002 I I J~ / 001 I 001 I I 000 o 500 I I 02725911391 003 ~ 1000 Total Runoff Volume, V, cubiC feel Time to Peak Runoff, hours I , I I I I I I 1500 Time, minutes 2000 4181 7831 2500 uate Received: MAY 2 8 2008 Original Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet I PrOject Name: Springfield Fire Station (Water Quality Event) Designer A. Backus Date: 05/12/08 Basin 2 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv PreCipitation In 24 hours (Pt) = Time of Concentration, Tc, minutes 2686 006 80 083 5 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp 6031 014 98 I I Note minimum Tc IS five minutes I Calculations are for the BES Water Quality storm - 0 83 Inches of rain In 24 hours In an NRCS Tvpe 1A dlstnbutlon Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs 02000964191 002 Total Runoff Volume, V, cubic feet Time to Peak Runoff, hours 3241 783 I Runoff Hydrograph 003 I I I 003 I , I I ,I I I I 002 J!! " :::- 002 0 !: ::l 0::: 001 I I I I 001 J / I I 000 o 500 1000 1500 2000 2500 Time, minutes Date Received: I MAY 2 8 2008 I Onglnal Submittal I I I Bureau of Environmental Services - SBUH Calculation Worksheet Project Name' Springfield Fire Station (Water Quality Event) Designer. A. Backus Date: 05/12/08 Basin 3 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentration, Tc, mlnules I I I 361 0001 801 0831 51 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes 1404 003 98 I Calculated Data Calculations are for the BES Water Quality stann 0.83 Inches of rain In 24 hours In an NRCS Tvpe 1A distribution I Tolal ProJect Area, Acres Peak Flow Rate, Qpeak, cfs 00330599171 001 I 001 Runoff Hydrograph I 001 I 001 I 000 ~ u ::: 0 <: '" c::: 000 I I 000 I 000 I I 000 o I I , , , " , , J / 500 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours \ 1000 1500 Time, minutes 731 783 2000 2500 6eH~ !Re~e\\,ed MAY 2 B 2008 OnglnAI Sub! mttaL__ ____ -~,~ I I I Bureau of Environmental Services - SBUH Calculation Worksheet PrOject Name' Springfield Fire Station (Water Quality Event) Designer. A. Backus Date: 05/12/08 Basin 4 User-Supplied Data PervIous Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentralion, Tc, minutes I I I 1259 003 80 083 5 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp Note minimum Tc IS five minutes 1188 003 98 I Calculated Data L Calculations are forJhe BES Water, Quality storm '0.83 Inches of rain 1n,24 hours 111 an NRCS Type 1A distribution ',' I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs I Runoff Hydrograph 001 , I , , , , , , , , , , , " , , , , , , , , 001 I I 000 '" 'ti - 000 '0 c :> a:: 000 I I I 000 I 000 o 500 I I I o 0561898531 0001 1000 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours 1500 2000 Time, minutes 661 783 2500 uate Received: MAY 2 8 2008 Original Submittai I I I Bureau of Environmental Services - SBUH Calculation Worksheet I Project Name. Springfield Fire Station (Water Quality Event) Designer. A. Backus Date' 05/12/08 Basin 5 User-Supplied Data Pervious Area Pervious Area, SF Pervious Area, Acres Pervious Area Curve Number, CNperv Precipitation In 24 hours (Pt) = Time of Concentrallon, Tc, mmutes 1081 002 80 083 5 Impervious Area Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNlmp 2759 006 98 I I Note minimum Tc IS five mrnules I ,Calculations are for,the BES Water,Qualltv stonn. 0 83'lnches of ram-m 24 ,hours m an NRCS Type 1A dlstnbutlon Calculated Data I Total Project Area, Acres Peak Flow Rate, Qpeak, cfs o 0881480721 001 Total Runoff Volume, V, cubiC feet Time to Peak Runoff, hours 1481 783 I Runoff Hydrograph 001 , I 1 1 1 ,I jl I I 001 I I 001 J!! u ::: 001 0 l: = a:: 000 I I .. I 000 I I 000 o 500 1000 1500 2000 2500 Time, mmutes uate Received: I MAY 2 8 2008 I Onglnal 8ubmlhal__. I I SPRINGFIELD FIRE STATION NO 16 SOUTH BIOSWALE WQ EVENT ...{ fis{ ~ .1/ ---, ~' Diagram of Swale Variables Used In Spreadsheet I s V -d I r Height Qpeak = Peak flow rate, cfs ~ I i i I User-Supplied Data Variable Name Side Slope 1 SS1 Side Slope 2 SS2 Swale Width W Lengthwise Slope S Peak Flow Rate Qpeak SwaJe Height Height Manning Coefficient n I I I Computed Data Name d A WP R Qpkcalc I Variable Depth Cross-sectional Area Wetted Perimeter Hydraulic RadiUS Computed Peak Flow Rate Computed Peak VelOCity IComputed Length L Vpkcalc I Unit 4 SS1 1 4 SS2 1 2 feet o 005 feeUfoot o 03 cfs 1 5 feet 025 Unit 1 38 Inches o 28 sf 2 95 feet 010 feet o 03 cfs o 09 fUsec 48 feet IWarnlng swale length must be 100' or more I DeSigned swale length IS approximately 120 ft I I I I I I CALC-BES-SWALE SPREADSHEET-SOUTH xis I Date Received: MAY 2 8 2008 . " lC"'j' 5/26/2008