HomeMy WebLinkAboutPermit Field Test & Inspection Report 2008-5-2
CIty of Springfield
Community ServIces DIvisIOn
225 FIfth Street
Springfield, OR 97477
Telephone. (541) 726-3759
Fax (541) 726-3689
COVl1z00B-oObIO
BUilding PermIt # I
S()f1f~ c:'1.,At;H~
Project Title
IBZO H.t>lveeL ~~c..Iy
Project Address ·
5/ZftJ8
Datl
~ods
WESi
Special Inspection and Testing
To applIcants ot proJects I equlI 109 speCial mspectlOn or test 109 as per SectIOn 1704 of the Oregon Stluctlll al Specmlty Code Please I eVJew the mformatlOn below. When you have
finished, acknowledge an undelstandmg of the information by slgnmg below, and retUln thIS form to the CIty
BEFORE A PERMIT CAN BE ISSUED: The owner or owner's representative, on the advice of the responsible Project Engineel or AlcllItect, shall complete, sIgn, and SUblTIlt to the
City for review and applOval thiS fOlm completed on both the flOnt and back
I. Contractor is responsible for pi oper notificatIOn for the InspectIOn or Testmg of items IIsted~
The owner and General Conti actOl, where applicable, shall also acknowledge the followmg conditions applIcable to Special InspectIOn and/or Testmg
Testmg laboratory shall take approprmte samples and transport them to their laboratory for proper evaluation or testmg
2
o
V1
,
N
co
I
o
co
)>
3
. Copies of all laboratory reports and mspectlOns ale to be sent to the City by the Testmg Agency
4,
Special Inspector shall plovlde mspectlon reports to the bUlldmg otlicial of all mspectlOn actiVities
Special Inspection Agency IS to submit names and qualificatIOns of on-sIte Specmllnspectors to the CIty for approval
5
Conti actor is responsible to review the City approved plans for addItional mspection 01 testing requlI ements that may be noted
,
o
I.N
-..1
BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED: The Specmllnspection Agency shall submit to the Building OffiCIal a statement that all items lequillllg ~
inspection have been fulfilled and reported and were to the best of the lIlspector's knowledge, 10 confOl mance With the approved plans, speclticatlOns and applIcable \VOl kmanshlp<
provISIons Those Items not tested and/or IIlspected shall be noted in the statement. The report IS to be submitted to the City prior to a request for tinal mspectlons 0
.('("cKeI1Z( e..... cmrnrJ\lfccg I Con-rmdt:::rs;Irc, ~Cf) ~
Gen C~ntractor Firm N~ ne (Prlllted) ~eneral cont!:.,~ature
J)&)lJ ~~m~~~ '_
SpecIal InspectIon Agency Name (Prmted) peclal Insp Agency Rep SIgn,
ACKNOWLEDGEMENTS
Owner Name (Prlllted)
~~0l:f~~1 ~~N~c;
Engineer or ArchltecC Firm (Prmted)
~er Signature U /
(EnA'~ 1l<A~
~n~er..., Architect SIgnature
Testmg Laboratory Rep SIgnature
Testing Laboratory Name (Pnnted)
BUlldmg OffiCial Name (Prmted)
BUlldmg OffiCial Slgnatwe
~
o
o
"-
I1:l
o
o
B
City of Springfield
Community Services DIvision
225 Fifth Street
Springfield, OR 97477
Telephone: (541) 726-3759
Fax: (54]) 726~3689
Co~zoo8-o0blo
Buildmg PelIDit # /.
$tJq;:1f'd ~ ~n1t'\.
. J Project Title
I BZ.O f:>, o,V"eetfL t:>p.ly
Project Address'
Special Inspection and Testing
5/:2/08
Dat6
Mods
tJESI
To applicants OfpTOjects requintlg special inspection or testing as per Sectlon 1704 oftlle Oregon Structural Specialty Code. Please review the infonnation below. When you have
finished, acknowledge an understanding of the information by signmg below, and return this form to the City.
BEFORE A PERMIT CAN BE ISSUED: The owner or owner's representative. on the advice of the responsible Project Engmeer or ArchItect, shall complete. sign. and submit to the
City for review and approval thIS fonn completed on both the front and back.
The owner and Gen~1 Contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection and/or Testing.
1. Contractor is responsible for proper notification for the Inspection or Testing ofitemslisted.
2. Testing laboratory sball take appropriate samples and transport them to their laboratory for proper evaluation or testing.
. Copies of all laboratory reports and inspections are to be sent to the City by the Testmg Agency.
3. Special Inspection Agency is to submit names and qualifications of on-site Spec1a1lnspectors to the City for approval.
4. Special Inspector shall provide inspection reports to the building official of all inspection actlvllles
5. Contractor is responsible to review the City approved plans for additional inspection or testing reqUIrements that may be noted
BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED: The Speciallnspectlon Agency shall submit to the Buildmg Official a statement that all items requiring
inspection have been fulfilled and reported and were to the best of the inspector's knowledge, in confonnance with the approved plans, specifications and applicable workmanship
provisions. Those items not tested and/or InSpected shall be noted in the statement. The report is to be submitted to the City prior to a request for final inspections.
rrcKet'lz(e... Cumlt\Qf'C<.9 f Co,froc::lt::ts';Itc. ,3..$)d ~
Gen. C~ntractor Firm N:-nc (Printed) ~eneral contr~to~ature
]h;~Jf"~m~.~ '_.
Special Inspection Agency Name (pnnted) peclal lnsp. Agency Rep Sign.
>1
<r:
~
ACKNOWLEDGEMENTS
7Jrff~-2>kytJlf.w/it, -.n- ~
Owner Name (Printed) Owner Signature r /
ht~~Gz-~ ~~~ --Pl'M\ /L;.I,~ /
Engineer or Architec{ Finn (Printed) ( En~i~!,. Arclllt~ct SIgnature
t?5j:" ~rf\ 0
Testing Laboratory Name (Pnnted) Testing Laboratory Rep Signature
BUIlding Official Name (printed)
Building Official SIgnature
C'l
I1:l
.-!
o
""
.-!
o
C'l
"-
o
M
"-
.-!
o
I1:l
o
o
'., ~
...,
0)
o
~
o
Z
i-1
P:::
"-
1-1
Eo<
.-!
o
It)
.-!
~
::z:::
Eo<
00
o
o
N
"-
N
N
"-
It)
o
Reinforced Concrete, Gumte, Grout and Mortal
Concrete Gumte Grout MOl tar
I
I
I
I
I
I I
PI ecast/Pre-stressed Concrete
Piles Post-Tens Pre-Tens
Cladding
SMOKE CONTROL:
Leakage testing
Control VenficatlOn
ROOFING:
InsulatIOn installatlOn/R-Value*
Test Stllps/seams
SPECIAL INSPECTION AND TESTING SCHEDULE
Aggregate Test of MIx Design
Reinforcing Test
MIX Design-Weighmaster Celt *
Reinforcing Placement
Continuous Batch Plant Inspect
Inspect Placing
Cast Samples
Samples (Plckup/Dellvered)
CompressIOn Test*
GRADING, EXCA V A TION, AND FILL
Acceptance tests * PSF
Establish final grade
Fill placement inspectIOn/continuous
Soil DenSity
STRUCTURAL STEELIWELDlNG:
Sample and test (list specIfic members below)
Shop matel mlldentlficatlon (mill cel t)
Weld inspection Shop_
Ultraso/J/c Inspection Shop
High Strength Boltlllg Shop
A325 _N _X
A490 N_X
Metal deck weldlllg IIlSpectlon
RelnfOlcmg Steel weldmg mspectlon
RelnfOlcmg steel mill certificate
Metal stud weldmg mspectlon
Concrete IIlSel t weldlllg IIlSpectlon
Moment I eSlstmg steel ti ames
Field
Field
Field
F
F
Agglegate Tests
Relllforcmg Tests
Tendon Test
MIX Deslgns*
RelnfOl clng Placement
Insert Placement
Concrete Batching
Concrete Placement
Installation Inspection
Cast Samples
Pick-up Samples
CompressIOn Tests
STRUCTURAL WOOD'
Shear wall nailing inspectIOn
Shear wall anchors
InspectIOn ofGlu.lam fab. * T/C pSI
InspectIOn of tl USS JOiSt fab
Sample and test components
FabllcatlOn welding of steel accessories
FIREPROOFING:
Placement inspectIOn
'Density tests
Thickness tests
Inspect batchlng
MASONRY
Special inspectIOn stresses used* fm t'g
Preliminary acceptance tests (masom)' umts, wall prisms)
Subsequent tests (mOl tar, glOUt, field wall prisms)
Placement IIlSpectlon of ullItS, and I elllfol cement
Masonry, mortal, grout, and reinforcing steel cel tlficates
ADDITIONAL INSRUCTIONS, OTHER TEST, & INSPECTIONS:
Form Completed by
Date
*PROVIDE STRENGTH REQUIRED BY ARCHITECT OR ENGINEER OR CONTRACT DOCUMENT LOCATION OF VALUES
CITY OF SPRINGFIELD
SPECIAL INSPECTION
SPECIAL INSPECTIONS AND WHEN
Tl1.EY'RE REQUIRED
A special Inspection IS the monitOl ing ofthe
materials and workmanship which ale cntlcal to
the Integnty of the building Stl ucture Many
buildings and structures use specialized matellals
or methods of constructIOn ThIS is m additIOn to
the standard inspectIOns performed by Olll City
mspectors (i e. toundations, flaming, plumbing,
mechalllcal, electrical, msulatlOn, sheetrock, final,
etc
The use of special Inspectors IS not discretIOnary
The Olegon Structural SpeCialty Code (OSSC)
Chapter 17, Section 17oq...lists the conditions when
speCial inspectors must be used
Generally special inspections mclude: Gradmg,
excavahon, and fill; PIlings, Concrete and
reinforcing, StructUl al masonry, wood, or steel,
Weldmg, High strength, slip Critical, expanSIOn, or
epoxy tensIOn boltmg, Single ply rooting; Splay-
applied tileprooting, and Smoke control
What is a special inspector and who is
qualified?
A specialmspector IS a person who has been
approved by the building offiCial to pel form certam
types of inspections, The special Inspector IS
reserved for complex installations that reqUIre
highly developed Inspection Skills, normally a
person employed by a private testing laboratory
The speclallnspectol shall be a qualltied pelson
who shall demonstrate competence, to the
satisfactIOn of the buildmg offiCial, fOl mspectlOn
of the particular type of construction 01 operation
requiring speclalmspectlon The ICBO
certificatIon IS recoglllzed by the building offiCial
as havmg met those reqUIrements The holder of
the certificatIOn will have satisfactorily passed a
wntten exammatlon, an oral mtervlew, and havmg
a review of their relevant education and work
expellence A list ot indiVIduals Will be
maintamed by the City of Spllngfield of those
persons who have been accepted as speCial
mspectors and m what particular diSCiplines they
have been appl oved
WHA T ARE THE RESPONSIBILITIES OF
THE OWNER, ARCHITECT, COMMUNITY
SERVICES, SPECIAL INSPECTOR AND
CONTRACTOR?
Tile Owner: The owner, or a person actmg as the
owner's agent shall select a qualitied speCial
lI1spector and employ them to conduct the I eqUlred
speclallllspectlOns
The Architect: The architect or engmeer ot recOld
assIsts the owner With the selectIOn ofa speCial
inspector. The Architect or engllleer shall speCIfy
types of speCial inspections reqtllred in the
construction documents
Community Services D,vlSton: The CIty leviews
the constructIOn documents for compliance WIth
speCial inspection requllements The diviSion
approves the speclalll1speCtor and m 0111 tOl s the
speclalll1spector and the mspectlOn activities
The ContHlctOl: In addition to notlfYlIlg the
Commulllty Selvlces that the wOIk IS leady tOl
regular mspectlons, the contractOl shall notify the
speclalmspector when WOl k IS ready for speCial
mspectlOn
The Svecial Ins/Jector: The speclallllspector
obselves all WOlk for whIch they are respon,slble
tor compliance With the apPloved deSIgn drawmgs
and speclticatlOns, Identities non-confonmng work
Immediately, plov/des tllnely lIlspectlOn leports on
a legulal basis mdlcatmg the mspectlons conducted
and test pel formed, lists of any nonconfOlmlty and
how they wele lesolved: and any unauthOllzed
changes by the archltect/engmeer, submit
diSCI epancy repOl ts IIstmg unresolved Items,
parties notified, times and methods, and submIts d
final signed summa! y repOlI.
It you have fUl ther mterest m the plOgram 01
would like addltlOnallnfOl matlon about speCial
IIlSpectlons, thIS office has a copy available of the
ICBO SpeCial InspectOl PlOgram Booklet, whIch
out]1I1es the plogram requlI ements 111 more
complete detail
It IS the lesponslbdlty of the appltcant and thell
deSignated repl esentatlves to undel stand when
specfallllspectlons are reqUIred Before a permIt
can be Issued, the owner shall complete, sIgn and
submit to the CIty tOl I eVlew and approve the
speclallllspectlOn and test agl eement and schedule.
We encoUlage the desIgn/contI actor team and
speclallllspectors to refer to Oregon Structural
SpeCIalty Code Chapter J 7 and I eVlew the "SpeCial
InspectIOns" sectIOn If there are any questions
about the progl am 01 the I eqUlrements of the
specml 1I1spectlOn contact the Development
Selvlces, Commul11ty ServIces DIVISion tOl
c1anficatlons
. ,
_"n
l-~;lInfoT71UJ#or(cY \.'fJ 1{
~..,. .ToBuiZtfeR,~
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Periormed: May 6, 2008 Report Number: 722-80120-1
Client: Chad BUlte Project Name: Pioneer Parkway Column Repair
McKenzie Commercial
865 West 2nd Ave Project Location: 1820 Pioneer Parkway, West
Eugene, Oregon 97402 Springfield, Oregon
Contractor: McKenzie Commercial B.P. No.: COM200B-00610
Fabricator: Gibson Steel Shop! Field: Field
Type of Inspection: Welding InspectIon Weather: Clear
field Observations and Comments
Performed periodic visual Inspection of the following items: retro fit columns per revised detail 8/A4.1 dated Apnl 15,
2008. Weldments were Inspected for size, length, profile and locations. To the best of our knowledge, the work
. inspected IS In conformance with approved drawings, specifications and applicable D1.1 codes,
Inspector: David Smith, Certification #0877340w85
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
-.?rofesslonaf s\jce (j1strieS1 Inc.
J~~d- ('~ '
DaviY"~~t~
Branch Manager
c: McKenzie Commercial - cbliiie@mckenziecommercial com
City of Springfield - dbowJspy@cLspnngfield.or.us
THIS REPORT IS PROVIDED FOR THE INFORMATION OFTHE CUENT ONLY. 71-1E REPRODUCTION OF 71-1IS REPORT, BY ANY MErHOD, AND ITS TRANSMITTAL ro A THIRD
PARTY, BY ANY MEANS, EXCEPT iN FULL. WITHOUT THE WRITTEN PERMISSiON OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITS.'J
Professional Sel'Vlce Industries, Inc. '1040.A Shelley Street. Springfield, OR 97477' Phone 5411746.9649. Fax 5411746.7163