Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2000-8-7 l-}~ -I Information ~.,. .10 Build On Engineering 0 Consulting. Testing ~q\ \\ddef'l ~ DAILY FIELD REPORT Date Performed: August7,2000 Report Number: 722-00298-5 Client: Ms. Barbara Cooper Project Name: Marvlns Manor 2955 Timberline Drive Eugene, OR 97405 Project Location: 47th & Jasper Road Springfield, Oregon P.O. No.: Permit No.: Type of Inspection: Site Observation Weather: Clear Field Observations and Comments Our representative witnessed a proofroll of natIVe sOil and Import gravel fill mixture at finished fill grade, as per Rick, foreman with Centerline Construction The proofroll was conducted within lots #1, #8, #9 and #16 WIthin lots #1 and #8, It appeared that approximately one to two feet of fill had been placed. Within lots #9 and #16, it appeared that approximately two to five feet of fill had been placed The proofroll was, performed with loaded watertruck ~elghing approximately 52,000 Ibs (as per rick with Centerline Construction). No deflections were observed under wheel loadlngand no wheel tracking (rutting) occurred indicating a relatively firm, stable fill surface at thiS time Contractor was asked to notify our office when additional services are needed. Inspector: M. Dewey If you have any questions regarding thIS report, please feel free to contact us at 541-746-9649. Respectfully Submitted, ProfeSSIOnal Service Industnes, Inc. '-~\ ,V, Cl~Gelfti Raymond V Allpertl, Department Manager Springfield Branch c Branch Engineering City of Springfield THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD. AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL... WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES IS PROHIBITED ProfeSSional Service Industnes, Inc .1040A <:>helley St . Spnngfleld. o.R 97477. Phone 541/746-9649. Fax 541/746-'1163