Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2000-8-7 l-1~ -I Information ~.,. .To Build On Engineering · Consulting. Testing L\Ufb6r ~ Ct, DAILY FIELD REPORT Date Performed: August7,2000 Report Number: 722-00298-5 Client: Ms Barbara Cooper Project Name: Marvlns Manor 2955 Timberline Drive Eugene, OR 97405 Project Location: 47th & Jasper Road Springfield, Oregon P.O. No.: Permit No.: Type of Inspection: Site Observation Weather: Clear Field Observations and Comments Our representative witnessed a proofroll of native sOil and Import gravel fill mixture at finished fill grade, as per Rick, foreman with Centerline Construction The proofroll was conducted within lots #1, #8, #9 and #16 WIthin lots #1 and #8, It appeared that approximately one to two feet of fill had been placed. Within lots #9 and #16, It appeared that approximately two to five feet of fill had been placed The proofroll was performed with loaded watertruck weighing approximately 52,000 Ibs (as per rick with Centerline Construction). No deflections were observed under wheel loadlngand no wheel tracking (rutting) occurred Indicating a relatively firm, stable fill surface at thiS time Contractor was asked to notify our office when additional services are needed Inspector: M. Dewey If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649. Respectfully Submitted, ProfeSSIOnal Service Industries, Inc. '-~~\ ,V, (llG8.urti Raymond V. AlJpertl, Department Manager Springfield Branch c Branch Engineering City of Springfield THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL" WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIEs." IS PROHIBITED ProfeSSional Service Industnes, Inc. 1040A "helley St . Spnngfleld, O.R 97477' Phone 541/746-9649. Fax 541/746-t163