Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 1999-10-4 l....~ ., Information ~~. .To Build On Engineering. Consulting. Testing DAILY FIELD REPORT ~'Wtt. ~onrrt ~ J Date Performed: October 4, 1999 Report Number: 722-90227 -43 Client: Mr Ron Sather Project Name: Ambleslde SubdivIsion-First Add City of Springfield 225 5th Street Project Location: Springfield, Oregon Springfield, Oregon 97477 P.O. No.: Job No P3-0115 Permit No.: N/A Type of Inspection: SOils Weather: N/A Field Observations and Comments PSI representative observed track-hoe stripping of organics contaminated sOil along lot line boundary between south facing lots on Ambleslde Drive and north facing lots on Falcon Drive BUried grass strlpplngs and bUried rooted grass and shrubs were revealed and removed throughout the extent of the current excavation which extends approXimately 25 feet south of the lot line between lots 94 through 102 (facing Falcon Drive) Subgrade elevation was Identified through this excavation and three subgrade elevations were measured as follows at approximately 115 feet south of station 2+00 on Falcon Drive = 47804 feet, at approXimately 105 feet south of statl!Jn 4+00 on Falcon Drive = 48449, at approXimately 90 feet south of station 5+25 on Falcon Drive = 490 34 Some strlpplngs were trucked off Site, while some was stockpiled In lots 27 through 29, and 33 through 37 p~' representative observed excavation of four (4) potholes In the approximate center of lots 96, 98, 99 and 100 Only I. ,e pothole In 'lot #100 was bUried organics discovered ApproXimately 18 Inches of primarily wood chips and grass were found at approXimately 6 Inches below current ground elevation The other three potholes were clean Along the western edge of the Site, bUrle? organic (grass) was seen to "Daylight Our at approXimately the intersection of the back lot line and the lots 94/95 boundary Please see accompanYll)g map for depiction of the referenced areas Inspector: Mike Dewey If you have any questions regarding thiS report, please feel free to contact us at 541-746-9649 RespeCtf~ r Jmltted; -IL..... ~ rol~ _ ~mond V Allpertl, CS Dept Manager Springfield Branch Attachment - Site Plan \~'\9202~1:.?~ ro~ Ai. ~v ~ T ~ II.;: IS- :t OCl \~~~ ~ ~ RtG':N:;ItU } ~ ~ 6' 19 ,,~o <9St-E't\./ C Ling and ASSOCiates - Mr Glenn Ling THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED ProfeSSional Service Industnes, Inc. 1040A Shelley St . Spnngfleld, 9R 97477. Phone 541/746-9649. Fax 541/746-7163 /0/1 49 12.2-'107....7-1 o ... ~ ro-HIPt..€S ~ GROUND ELEVATIONS AMBLES/DE PHASE 11/ AND IV OCT. 1/9B CLJ I SCALE 1" =~l LAYERS 39, 40 ) / 41 42 " / 43 44 r?'7') ~ Af'P,{o}',IMJ'ET6 ~ /....A'TeR.fl..t.... lG?1-:l'~HI of 5 ~"^,'l10f>-j '.,. 0 c:....t..SNJ ~F,U<N.t;;t I / I / , I J /7 ( .. 45/ // i I /61 / \0. .--1 ," I {1721 / J , , / / L ,,/ /' \ ~ ~/ I I 1 -- --- -----