DAILY FIELD REPORT
Date:
Client:
October 8, 1999
Mr. Ron Sather
City of Springfield
Dept. of Public Works
225 North 5th Street
Springfield, OR 97477
Report Number:
722-90227-54
Project Name:
Ambleside SubdivIsion - 1st Add.
Project Location:
Springfield, Oregon
P.o. No.: Job No. P 30115
Type of Inspection: SOils
Permit No.:
Weather:
N/A
Clear
Field Observations and Comments
Observed the Hydration and compaction effort of native soil structural fill with excavation areas A and B,(Please see
the attached map for locations). Centerline Construction used a t;>ulldozer mounted sOil-ripper bar to rip the first 11ft
(approximately 1-2 feet thick) of native soil fill above subgrade Water was applied to the surface of this 11ft from
Ambleside Drive With a side-spraying water truck
Performed field nuclear mOisture-density test on the first lift of native SOil fill Based on the AASHTO T-99 theoretical
""'axlmum dry denSity and optimum mOIsture for thiS material, thiS lift IS unacceptable at this time In conducting three
tlloratory test pitS Within excavation A, it was revealed that the subgrade had been ripped up by the hydration effort
applied to the first lift The mixing of material Into the first lift made achieVing a uniform above optimum moisture
condItIon difficult. In discussing thiS situation With Mr. Glenn Ling (Project Engineer), Troy Hull (PSI), and Mike
Kirkpatrick (Foreman, Centerline Construction) it was deCided that a shallow ripping and application of two full water
trucks of water to this lift would be followed by mOisture-density testing again on Monday 10/11/99.
Inspector: Mike Dewey
If you have any questions reg~rdlng this report, please feel free to contact us at 541-746-9649.
Respectfull ______ --...
\;' 0 . -?<--
aymond V. Allperti, CS Dept. Manager C ,
Springfield Branch ~
0. '\~ '\6171819<0
~ ~ ...4 ~,.
,." ~ ~
~ ~
... /), / Ofl \I)
~ 1fftJ? 1#J'J' ~
'\ l/f/[;; !v~~
~>"" .~o.../
.~ , ~ r.(' ~~/
Pt.., .J'il..1/
c' Ling & Assoc - Glenn Ling
Ceoterline Construction
Attachment: Site Plan
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industnes, Inc' 1040A Shelley St . Spnngfleld, pR 97477' Phone 541/746-9649' Fax 541/746.7163
~
l1..:L - I(.,n,-l.~ 1
~ 1;lI: Appgo)<.Ih t:..1'i:..
ej.1l9-rr" "" 1-^~
~ A1Ze~
1> F -:nf..;J at l,) I! P-<t- -
f>t.-A c...e . F (~L
r1EN"'t""" ([~ ( B 1'"191
.o;,!,
"
t
GRO"UND
tMBLES/DE /LEVATIONS
OCT. ~~~~ "' ANp IV
SCALE; 1" _~.,tJ
LAYERS 39- '~,
. 40 ",,/,
I
/
/
40 41 42 43 44 45/ I
/ / /
,..../
/ :z
,.-
/;;...---
/::::
,"'-
/'"
_1.3.._ ..12"- --- 11 10 9
--
,./,./
- .-'
~.,--
,./
90 ~ BB
- ,
-
~
~\.
'.
"
, \
I
!
i
I
, i ·
1 ~;.