DAILY FIELD REPORT
Date:
Client:
October 8, 1999
Mr. Ron Sather
City of Springfield
Dept of Public Works
225 North 5th Street
Springfield, OR 97477
Report Number:
722-90227-54
Project Name:
Ambleside SubdivIsion - 1st Add.
Project Location:
Springfield, Oregon
P.O. No.: Job No P 30115
Type of Inspection: SOIls
Permit No.:
Weather:
N/A,
Clear
Field Observations and Comments
Observed the Hydration and compaction effort of native soil structural fill with excavation areas A and B,(Please see'
the attached map for locations). Centerline Construction used a. bulldozer mounted sOil-ripper bar to rip the first lift
(approximately 1-2 feet thick) of native sOIl fill above subgrade Water was applied to the surface of thiS 11ft from
Ambleslde Drive with a side-spraYing water truck
Performed field nuclear mOlsture~denslty test on the first lift of native soil fill. Based on the AASHTO T-99 theoretical
""axlmum dry density and optimum mOisture for thiS matenal, this 11ft IS unacceptable at this time In conducting three
tlloratory test pitS within excavation A, It was revealed that the subgrade had been ripped up by the hydration effort
. applied to the first 11ft. The mixing of material into the first 11ft made achieving a uniform above optimum moisture
condItIon dIffIcult. In diSCUSSing this situation with Mr. Glenn Ling (Project Engineer), Troy Hull (PSI), and Mike
Kirkpatrick (Foreman, Centerline Construction) it was d~clded that a shallow npping and application of two full water
trucks of water to thiS 11ft would be followed by moisture-density testing again on Monday 10/11/99
Inspector: Mike Dewey
If you have any questions reg~rding this report, please feel free to contact us at 541-746-9649
Respr~~ ~
~mond V. Allperti, CS Dept. Manager C
Springfield Branch __________
Os ,\fO '\6171819 <o~
fI:J ~ AI ~~
".: ~ ~
~ ~
.... Ofl ~
,~ ~~ l$pg J
~~r\ r;; ~
'~ ..,{,
'>"" l' ,:.> /
("0"/
f, II r......(J'l..'......-/...
cling & Assoc. - Glenn Ling
Ceoterline Construction
Attachment. Site Plan
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIEfI/r ONL Y THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
ProfeSSional Service Industries, Inc. 1040A Shelley St . Springfield, pR 97477 . Phone 541/746.9649 . Fax 541/746.7163
~
l 1...' L ~ "1 (.) "1,.. ,- I
o "#: ApPROKII'1 ~"f\i=..
ej-."TB-J\.", 1-A-~
~ Af2eA&>
'OF ~d(l,)(t.p.,
t="L-A. c...e: ' :\,.... F (L-L
MEN'"t""" ([0 ( ~ ("191
.",
~
GROUND
tMBLESlDE /LEVATJONS
. OCT. ~~~~ III ANp IV
SCALE' 1" ~ Pi"
'LA . =~t::
YERS 39. 40 ,.:),
/
~
J
I
.\
,
I
,I 19
I
I
I .
I '"
I
88
87 (
J
/
-==- -=: -:
..